# Fighting Jays Solar Project

ERCOT asset profile · https://askthegrid.com/assets/facilities/fighting-jays-solar-project

AP Solar 2, LLC · Fort Bend County · ERCOT

Fighting Jays Solar is an operating photovoltaic facility in Fort Bend County, Texas. EIA's May 2026 inventory lists Plant ID 62945 as one 227.5 MW generator operated by AP Solar 2, LLC, with service beginning in June 2022. The broader project was sold to a Copenhagen Infrastructure Partners affiliate in July 2020 as a 350 MWac development. That project-level rating is kept separate from the current EIA plant record. The sale announcement also disclosed a long-term physical-power hedge with Shell Energy and CenterPoint substation construction for the ERCOT interconnection.

## Profile

- **Grid role:** Utility-scale photovoltaic generation serving ERCOT's Houston-area market.
- **Capacity scope:** 227.5 MW current EIA plant record · 350 MWac project scope at the July 2020 sale.
- **Operating record:** One EIA photovoltaic generator · June 2022 service month.
- **Commercial history:** CIP-affiliate acquisition · Shell Energy long-term physical-power hedge · CenterPoint interconnection work.

## Metrics

- **EIA operating capacity:** 227.5 MW — Plant 62945 · May 2026
- **Transaction project scope:** 350 MWac — July 2020 sale announcement
- **Commercial operation:** Jun 2022 — EIA
- **Settlement point:** JAY_RN_1 — ERCOT settlement point.
- **Resource stack:** 2 resources — JAY_UNIT1 · JAY_UNIT2
- **Registry anchor:** Plant 62945 — AP Solar 2, LLC

## Facts

- **EIA operating capacity:** 227.5 MW — EIA · confidence: high
- **Transaction project scope:** 350 MWac — AP Solar · confidence: high
- **Registered operator:** AP Solar 2, LLC — EIA · confidence: high
- **Commercial operation:** June 2022 — EIA · confidence: high

## Related parties

- **Project company and EIA registered operator:** AP Solar 2, LLC — EIA May 2026 generator inventory
- **Acquirer through an affiliate in July 2020:** Copenhagen Infrastructure Partners — Fighting Jays sale and hedge announcement ([source](https://www.cip.com/))

## Sources

- [EIA May 2026 generator inventory](https://www.eia.gov/electricity/data/eia860m/) — U.S. Energy Information Administration · regulatory — Current generator records, capacity scopes, dates, status, operator, and technology.
- [Fighting Jays sale and hedge announcement](https://apsolarholdings.com/news/fighting-jays-solar/) — AP Solar Holdings · official — Project sale scope, parties, Shell hedge and CenterPoint interconnection work.

---

Canonical page: https://askthegrid.com/assets/facilities/fighting-jays-solar-project
Website: [Copenhagen Infrastructure Partners](https://apsolarholdings.com/news/fighting-jays-solar/)
Profile published: 2026-07-17T03:34:16.112Z
Source: Ask the Grid — https://askthegrid.com/