# FirstEnergy Harrison Power Station

PJM Conventional Steam Coal · https://askthegrid.com/assets/facilities/firstenergy-harrison-power-station

FirstEnergy Harrison Power Station is a coal-fired power facility with 2,052 MW of EIA-reported nameplate capacity in Harrison County, West Virginia, registered as EIA Plant ID 3944. FirstEnergy's official fact sheet identifies Harrison Power Station as one of the largest and cleanest coal-fired generating facilities in the nation. Monongahela Power Company acquired a 79.46% interest in the plant from Allegheny Energy Supply Company, LLC in 2013.

## Key facts

- Technology: Conventional Steam Coal
- Power capacity: 2052 MW
- Commercial operation: 1972
- Operating status: operating
- Retirement: 2040

## Grid and market context

- ISO/RTO: PJM
- Balancing authority: PJM Interconnection, LLC (PJM)

## Source-backed facts

- Owner logo domain: firstenergycorp.com — Microsoft Word - 2025 MATS Repeal Comments Final for signature (002) · confidence: medium
- Identifiers: [{"value":"3944","system":"EIA plant ID"},{"value":"5961","system":"FERC EIA record ID"},{"value":"2","system":"FERC generator ID"},{"value":"PJM","system":"ISO/RTO / balancing authority"},{"value":"WV0005339; WV0075795","system":"EPA/NPDES permit IDs"},{"value":"033-00015","system":"West Virginia facility ID / air permit"},{"value":"12-1571-E-PC","system":"West Virginia PSC docket"}] — MBR | Index - Federal Energy Regulatory Commission · confidence: medium
- Identifiers: [{"value":"3944","system":"EIA plant ID"},{"value":"5961","system":"FERC EIA record ID"},{"value":"2","system":"FERC generator ID"},{"value":"PJM","system":"ISO/RTO / balancing authority"},{"value":"WV0005339; WV0075795","system":"EPA/NPDES permit IDs"},{"value":"033-00015","system":"West Virginia facility ID / air permit"},{"value":"12-1571-E-PC","system":"West Virginia PSC docket"}] — Steam Electric Industry - EIA/NPDES ID Match-Up (XLSX) · confidence: medium
- Identifiers: [{"value":"3944","system":"EIA plant ID"},{"value":"5961","system":"FERC EIA record ID"},{"value":"2","system":"FERC generator ID"},{"value":"PJM","system":"ISO/RTO / balancing authority"},{"value":"WV0005339; WV0075795","system":"EPA/NPDES permit IDs"},{"value":"033-00015","system":"West Virginia facility ID / air permit"},{"value":"12-1571-E-PC","system":"West Virginia PSC docket"}] — WEST VIRGINIA ACTION GROUP v. PUBLIC SERVICE COMMISSION OF WEST VIRGINIA (2014) | FindLaw · confidence: medium
- Official project url: https://www.firstenergycorp.com/content/dam/corporate/generationmap/files/Harrison-Power-Station-fact-sheet.pdf — Source · confidence: high
- Description: FirstEnergy Harrison Power Station is an operating coal-fired generating station in Haywood, Harrison County, West Virginia. The EIA plant record identifies three generating units with 2,052 MW of capacity, while FirstEnergy's official fact sheet reports 1,984 MW of net electricity output. The three units entered service in 1972, 1973, and 1974, and the station uses scrubbers and selective catalytic reduction systems. — Source · confidence: medium
- Description: FirstEnergy Harrison Power Station is an operating coal-fired generating station in Haywood, Harrison County, West Virginia. The EIA plant record identifies three generating units with 2,052 MW of capacity, while FirstEnergy's official fact sheet reports 1,984 MW of net electricity output. The three units entered service in 1972, 1973, and 1974, and the station uses scrubbers and selective catalytic reduction systems. — Microsoft Word - 2025 MATS Repeal Comments Final for signature (002) · confidence: medium
- Canonical name: FirstEnergy Harrison Power Station — MBR | Index · confidence: high
- Identifiers.0: {"value":"3944","system":"EIA plant ID"} — MBR | Index - Federal Energy Regulatory Commission · confidence: high
- Identifiers.1: {"value":"5961","system":"FERC EIA record ID"} — MBR | Index · confidence: high
- Identifiers.2: {"value":"2","system":"FERC generator ID"} — MBR | Index - Federal Energy Regulatory Commission · confidence: medium
- Identifiers.4: {"value":"WV0005339; WV0075795","system":"EPA/NPDES permit IDs"} — Steam Electric Industry - EIA/NPDES ID Match-Up (XLSX) · confidence: medium
- Identifiers.6: {"value":"12-1571-E-PC","system":"West Virginia PSC docket"} — WEST VIRGINIA ACTION GROUP v. PUBLIC SERVICE COMMISSION OF WEST VIRGINIA (2014) | FindLaw · confidence: medium
- Parties.0: {"relationship":"Owner and operator","name":"Monongahela Power Company (Mon Power)","official_url":"https://www.firstenergycorp.com/mon_power.html"} — Microsoft Word - 2025 MATS Repeal Comments Final for signature (002) · confidence: high
- Parties.1: {"relationship":"Parent company","name":"FirstEnergy Corp.","official_url":"https://www.firstenergycorp.com/"} — Microsoft Word - 2025 MATS Repeal Comments Final for signature (002) · confidence: high
- Site acres: 1400 — Source · confidence: high
- Unit configuration: Three coal-fired generating units equipped with scrubbers and selective catalytic reduction (SCR) systems — Source · confidence: high
- Commercial operation date: 1972 — Source · confidence: medium
- Construction scope: Operating coal-fired conventional steam station with three generating units/generators. The units have 684 MW nameplate capacity each (2,052 MW total); technical documentation states each unit can produce 720 MW at full load. Installed scope includes three Foster-Wheeler boilers, three Westinghouse steam turbines, three electric generators, scrubber modules on all three units, three SCR systems, and two hyperbolic cooling towers. The Unit 1 SCR retrofit used Haldor Topsoe catalyst/process technology. — Source · confidence: medium
- Construction scope: Operating coal-fired conventional steam station with three generating units/generators. The units have 684 MW nameplate capacity each (2,052 MW total); technical documentation states each unit can produce 720 MW at full load. Installed scope includes three Foster-Wheeler boilers, three Westinghouse steam turbines, three electric generators, scrubber modules on all three units, three SCR systems, and two hyperbolic cooling towers. The Unit 1 SCR retrofit used Haldor Topsoe catalyst/process technology. — Finding Lost Megawatts at the Harrison Power Station · confidence: medium
- Construction scope: Operating coal-fired conventional steam station with three generating units/generators. The units have 684 MW nameplate capacity each (2,052 MW total); technical documentation states each unit can produce 720 MW at full load. Installed scope includes three Foster-Wheeler boilers, three Westinghouse steam turbines, three electric generators, scrubber modules on all three units, three SCR systems, and two hyperbolic cooling towers. The Unit 1 SCR retrofit used Haldor Topsoe catalyst/process technology. — CFB Repowering, SCR Retrofit and Distributed Generation Projects Tabbed as Projects of the Year · confidence: medium
- Product url: https://www.woodgroup.com/solutions/expertise/boiler-parts-and-services — Boiler parts and services | Wood · confidence: medium
- Product url: https://www.woodgroup.com/solutions/expertise/boiler-parts-and-services — Utility steam turbines · confidence: medium
- Kind: thermal — Source · confidence: high
- Equipment models: [{"manufacturer_domain":"woodgroup.com","product_url":"https://www.woodgroup.com/solutions/expertise/boiler-parts-and-services","count":3,"unit_mw":720,"name":"Foster-Wheeler steam boiler"},{"manufacturer_domain":"westinghousenuclear.com","product_url":"https://westinghousenuclear.com/operating-plants/outage-services/turbine-services/","count":3,"unit_mw":720,"name":"Westinghouse steam turbine"},{"manufacturer_domain":"siemens-energy.com","product_url":"https://www.siemens-energy.com/global/en/home/products-services/product/utility-steam-turbines.html","count":3,"unit_mw":684,"name":"Siemens Energy electric generator"}] — Finding Lost Megawatts at the Harrison Power Station · confidence: medium
- Equipment models.0: {"manufacturer_domain":"woodgroup.com","product_url":"https://www.woodgroup.com/solutions/expertise/boiler-parts-and-services","count":3,"unit_mw":720,"name":"Foster-Wheeler steam boiler"} — Finding Lost Megawatts at the Harrison Power Station · confidence: medium
- Equipment models.1: {"manufacturer_domain":"westinghousenuclear.com","product_url":"https://westinghousenuclear.com/operating-plants/outage-services/turbine-services/","count":3,"unit_mw":720,"name":"Westinghouse steam turbine"} — Finding Lost Megawatts at the Harrison Power Station · confidence: medium
- Significance: FirstEnergy's official fact sheet identifies Harrison Power Station as one of the largest and cleanest coal-fired generating facilities in the nation. — Source · confidence: medium
- Description: FirstEnergy Harrison Power Station is a three-unit conventional coal station in Haywood, Harrison County, West Virginia, with 2,052 MW of EIA nameplate capacity; FirstEnergy's fact sheet reports 1,984 MW of net output. Monongahela Power Company (Mon Power), a FirstEnergy subsidiary, owns and operates the station in the PJM balancing area. Units 1, 2, and 3 went online in 1972, 1973, and 1974, respectively. Allegheny Energy Supply, another FirstEnergy subsidiary, transferred its remaining 79.46% interest to Mon Power in an October 2013 asset-swap transaction, making Mon Power the sole owner; the plant is equipped with scrubbers and selective catalytic reduction systems. — Source · confidence: high
- Description: FirstEnergy Harrison Power Station is a three-unit conventional coal station in Haywood, Harrison County, West Virginia, with 2,052 MW of EIA nameplate capacity; FirstEnergy's fact sheet reports 1,984 MW of net output. Monongahela Power Company (Mon Power), a FirstEnergy subsidiary, owns and operates the station in the PJM balancing area. Units 1, 2, and 3 went online in 1972, 1973, and 1974, respectively. Allegheny Energy Supply, another FirstEnergy subsidiary, transferred its remaining 79.46% interest to Mon Power in an October 2013 asset-swap transaction, making Mon Power the sole owner; the plant is equipped with scrubbers and selective catalytic reduction systems. — ' · confidence: high
- Description: FirstEnergy Harrison Power Station is a three-unit conventional coal station in Haywood, Harrison County, West Virginia, with 2,052 MW of EIA nameplate capacity; FirstEnergy's fact sheet reports 1,984 MW of net output. Monongahela Power Company (Mon Power), a FirstEnergy subsidiary, owns and operates the station in the PJM balancing area. Units 1, 2, and 3 went online in 1972, 1973, and 1974, respectively. Allegheny Energy Supply, another FirstEnergy subsidiary, transferred its remaining 79.46% interest to Mon Power in an October 2013 asset-swap transaction, making Mon Power the sole owner; the plant is equipped with scrubbers and selective catalytic reduction systems. — Source · confidence: high
- Quality notes: ["The EIA record reports 2,052 MW of nameplate capacity, while FirstEnergy's official fact sheet reports 1,984 MW of net output; these are different capacity measures.","The October 2013 transaction value was an intra-FirstEnergy asset purchase and swap. The cited records identify transaction consideration and regulatory accounting amounts, but no separate project-finance debt facility or construction-financing instrument.","The documented 1995 scrubber installation and subsequent environmental controls are environmental retrofits. — Source · confidence: medium
- Quality notes: ["The EIA record reports 2,052 MW of nameplate capacity, while FirstEnergy's official fact sheet reports 1,984 MW of net output; these are different capacity measures.","The October 2013 transaction value was an intra-FirstEnergy asset purchase and swap. The cited records identify transaction consideration and regulatory accounting amounts, but no separate project-finance debt facility or construction-financing instrument.","The documented 1995 scrubber installation and subsequent environmental controls are environmental retrofits. — PSC order allows acquisition of Harrison Power Station | | wvnews.com · confidence: medium
- Quality notes: ["The EIA record reports 2,052 MW of nameplate capacity, while FirstEnergy's official fact sheet reports 1,984 MW of net output; these are different capacity measures.","The October 2013 transaction value was an intra-FirstEnergy asset purchase and swap. The cited records identify transaction consideration and regulatory accounting amounts, but no separate project-finance debt facility or construction-financing instrument.","The documented 1995 scrubber installation and subsequent environmental controls are environmental retrofits. — Source · confidence: medium
- Financing summary: No separate project-finance debt or construction-financing instrument is identified in the cited records. In the October 2013 intra-FirstEnergy asset-swap transaction, Mon Power made a net payment of approximately $1.102 billion to acquire Allegheny Energy Supply's remaining Harrison interest; the West Virginia PSC described approximately $800 million of investment allowed in rate base and a $257 million acquisition adjustment. These amounts represent transaction consideration and regulatory accounting treatment, not identified project financing. — PSC order allows acquisition of Harrison Power Station | | wvnews.com · confidence: medium
- Financing summary: No separate project-finance debt or construction-financing instrument is identified in the cited records. In the October 2013 intra-FirstEnergy asset-swap transaction, Mon Power made a net payment of approximately $1.102 billion to acquire Allegheny Energy Supply's remaining Harrison interest; the West Virginia PSC described approximately $800 million of investment allowed in rate base and a $257 million acquisition adjustment. These amounts represent transaction consideration and regulatory accounting treatment, not identified project financing. — ' · confidence: medium
- Timeline: [{"event":"Unit 1 commercial operation","date":"1972","detail":"Unit 1 went online."},{"event":"Unit 2 commercial operation","date":"1973","detail":"Unit 2 went online."},{"event":"Unit 3 commercial operation","date":"1974","detail":"Unit 3 went online."},{"event":"Environmental retrofit","date":"1995","detail":"Scrubber systems became part of all three units; the systems remove more than 98% of sulfur dioxide emissions."},{"event":"Acquisition and asset swap","date":"2013-10","detail":"The West Virginia PSC approved Mon Power's acquisition of the remaining 79.46% of Harrison from Allegheny Energy Supply, while Mon Power transferred its Pleasants interest to Allegheny Energy Supply. The transaction took effect in October 2013 and made Mon Power the sole owner."},{"event":"Retirement planning","date":"2021-12","detail":"FirstEnergy and its utilities proposed environmental-compliance measures supporting continued operation of Harrison until its anticipated 2040 retirement date; this is a planned date, not a completed retirement."}] — Source · confidence: medium
- Timeline: [{"event":"Unit 1 commercial operation","date":"1972","detail":"Unit 1 went online."},{"event":"Unit 2 commercial operation","date":"1973","detail":"Unit 2 went online."},{"event":"Unit 3 commercial operation","date":"1974","detail":"Unit 3 went online."},{"event":"Environmental retrofit","date":"1995","detail":"Scrubber systems became part of all three units; the systems remove more than 98% of sulfur dioxide emissions."},{"event":"Acquisition and asset swap","date":"2013-10","detail":"The West Virginia PSC approved Mon Power's acquisition of the remaining 79.46% of Harrison from Allegheny Energy Supply, while Mon Power transferred its Pleasants interest to Allegheny Energy Supply. The transaction took effect in October 2013 and made Mon Power the sole owner."},{"event":"Retirement planning","date":"2021-12","detail":"FirstEnergy and its utilities proposed environmental-compliance measures supporting continued operation of Harrison until its anticipated 2040 retirement date; this is a planned date, not a completed retirement."}] — Source · confidence: medium
- Timeline: [{"event":"Unit 1 commercial operation","date":"1972","detail":"Unit 1 went online."},{"event":"Unit 2 commercial operation","date":"1973","detail":"Unit 2 went online."},{"event":"Unit 3 commercial operation","date":"1974","detail":"Unit 3 went online."},{"event":"Environmental retrofit","date":"1995","detail":"Scrubber systems became part of all three units; the systems remove more than 98% of sulfur dioxide emissions."},{"event":"Acquisition and asset swap","date":"2013-10","detail":"The West Virginia PSC approved Mon Power's acquisition of the remaining 79.46% of Harrison from Allegheny Energy Supply, while Mon Power transferred its Pleasants interest to Allegheny Energy Supply. The transaction took effect in October 2013 and made Mon Power the sole owner."},{"event":"Retirement planning","date":"2021-12","detail":"FirstEnergy and its utilities proposed environmental-compliance measures supporting continued operation of Harrison until its anticipated 2040 retirement date; this is a planned date, not a completed retirement."}] — PSC order allows acquisition of Harrison Power Station | | wvnews.com · confidence: medium
- Timeline: [{"event":"Unit 1 commercial operation","date":"1972","detail":"Unit 1 went online."},{"event":"Unit 2 commercial operation","date":"1973","detail":"Unit 2 went online."},{"event":"Unit 3 commercial operation","date":"1974","detail":"Unit 3 went online."},{"event":"Environmental retrofit","date":"1995","detail":"Scrubber systems became part of all three units; the systems remove more than 98% of sulfur dioxide emissions."},{"event":"Acquisition and asset swap","date":"2013-10","detail":"The West Virginia PSC approved Mon Power's acquisition of the remaining 79.46% of Harrison from Allegheny Energy Supply, while Mon Power transferred its Pleasants interest to Allegheny Energy Supply. The transaction took effect in October 2013 and made Mon Power the sole owner."},{"event":"Retirement planning","date":"2021-12","detail":"FirstEnergy and its utilities proposed environmental-compliance measures supporting continued operation of Harrison until its anticipated 2040 retirement date; this is a planned date, not a completed retirement."}] — ' · confidence: medium
- Timeline: [{"event":"Unit 1 commercial operation","date":"1972","detail":"Unit 1 went online."},{"event":"Unit 2 commercial operation","date":"1973","detail":"Unit 2 went online."},{"event":"Unit 3 commercial operation","date":"1974","detail":"Unit 3 went online."},{"event":"Environmental retrofit","date":"1995","detail":"Scrubber systems became part of all three units; the systems remove more than 98% of sulfur dioxide emissions."},{"event":"Acquisition and asset swap","date":"2013-10","detail":"The West Virginia PSC approved Mon Power's acquisition of the remaining 79.46% of Harrison from Allegheny Energy Supply, while Mon Power transferred its Pleasants interest to Allegheny Energy Supply. The transaction took effect in October 2013 and made Mon Power the sole owner."},{"event":"Retirement planning","date":"2021-12","detail":"FirstEnergy and its utilities proposed environmental-compliance measures supporting continued operation of Harrison until its anticipated 2040 retirement date; this is a planned date, not a completed retirement."}] — IEEFA-Kunkel-report-on-Harrison-acquisition.... · confidence: medium
- Timeline: [{"event":"Unit 1 commercial operation","date":"1972","detail":"Unit 1 went online."},{"event":"Unit 2 commercial operation","date":"1973","detail":"Unit 2 went online."},{"event":"Unit 3 commercial operation","date":"1974","detail":"Unit 3 went online."},{"event":"Environmental retrofit","date":"1995","detail":"Scrubber systems became part of all three units; the systems remove more than 98% of sulfur dioxide emissions."},{"event":"Acquisition and asset swap","date":"2013-10","detail":"The West Virginia PSC approved Mon Power's acquisition of the remaining 79.46% of Harrison from Allegheny Energy Supply, while Mon Power transferred its Pleasants interest to Allegheny Energy Supply. The transaction took effect in October 2013 and made Mon Power the sole owner."},{"event":"Retirement planning","date":"2021-12","detail":"FirstEnergy and its utilities proposed environmental-compliance measures supporting continued operation of Harrison until its anticipated 2040 retirement date; this is a planned date, not a completed retirement."}] — Mon Power and Potomac Edison Propose Environmental... · confidence: medium
- Commercial parties.0: {"relationship":"Owner and operator","name":"Monongahela Power Company (Mon Power)","detail":"Mon Power owned 20.54% of Harrison before the 2013 proceeding and acquired the remaining 79.46% from Allegheny Energy Supply, becoming sole owner.","official_url":"https://www.firstenergycorp.com/mon_power.html"} — Utilities agree with conditions for purchase of W.Va power station · confidence: high
- Commercial parties.0: {"relationship":"Owner and operator","name":"Monongahela Power Company (Mon Power)","detail":"Mon Power owned 20.54% of Harrison before the 2013 proceeding and acquired the remaining 79.46% from Allegheny Energy Supply, becoming sole owner.","official_url":"https://www.firstenergycorp.com/mon_power.html"} — ' · confidence: high
- Commercial parties.1: {"relationship":"Seller and transferor","name":"Allegheny Energy Supply","detail":"FirstEnergy subsidiary that held the remaining 79.46% interest and transferred full ownership of Harrison to Mon Power in the October 2013 transaction.","official_url":null} — Utilities agree with conditions for purchase of W.Va power station · confidence: medium
- Commercial parties.2: {"relationship":"Parent company","name":"FirstEnergy Corp.","detail":"Parent company of Mon Power and Allegheny Energy Supply; FirstEnergy disclosed the station's operating, environmental-control, and anticipated-retirement information.","official_url":"https://www.firstenergycorp.com/"} — Source · confidence: high
- Commercial parties.2: {"relationship":"Parent company","name":"FirstEnergy Corp.","detail":"Parent company of Mon Power and Allegheny Energy Supply; FirstEnergy disclosed the station's operating, environmental-control, and anticipated-retirement information.","official_url":"https://www.firstenergycorp.com/"} — Mon Power and Potomac Edison Propose Environmental Compliance Program for Power Plants · confidence: high
- Commercial parties.3: {"relationship":"Asset-swap participant","name":"Potomac Edison","detail":"FirstEnergy subsidiary and transaction participant; the settlement included the sale of Mon Power's 7.69% interest in Pleasants Power Station to Allegheny Energy Supply. Potomac Edison was not identified as an owner of Harrison in the cited transaction records.","official_url":null} — Utilities agree with conditions for purchase of W.Va power station · confidence: medium
- Quality notes.0: The EIA record reports 2,052 MW of nameplate capacity, while FirstEnergy's official fact sheet reports 1,984 MW of net output; these are different capacity measures. — Source · confidence: medium
- Quality notes.1: The October 2013 transaction value was an intra-FirstEnergy asset purchase and swap. The cited records identify transaction consideration and regulatory accounting amounts, but no separate project-finance debt facility or construction-financing instrument. — PSC order allows acquisition of Harrison Power Station | | wvnews.com · confidence: medium
- Quality notes.1: The October 2013 transaction value was an intra-FirstEnergy asset purchase and swap. The cited records identify transaction consideration and regulatory accounting amounts, but no separate project-finance debt facility or construction-financing instrument. — ' · confidence: medium
- Quality notes.1: The October 2013 transaction value was an intra-FirstEnergy asset purchase and swap. The cited records identify transaction consideration and regulatory accounting amounts, but no separate project-finance debt facility or construction-financing instrument. — Source · confidence: medium
- Timeline.0: {"event":"Unit 1 commercial operation","date":"1972","detail":"Unit 1 went online."} — Source · confidence: high
- Timeline.1: {"event":"Unit 2 commercial operation","date":"1973","detail":"Unit 2 went online."} — Source · confidence: high

## Timeline

- 1972 — Unit 1 commercial operation
  Unit 1 went online.
  Source: Source (https://www.firstenergycorp.com/content/dam/corporate/generationmap/files/FE-Harrison%20Fact%20Sheet.pdf)
- 1973 — Unit 2 commercial operation
  Unit 2 went online.
  Source: Source (https://www.firstenergycorp.com/content/dam/corporate/generationmap/files/FE-Harrison%20Fact%20Sheet.pdf)
- 1974 — Unit 3 commercial operation
  Unit 3 went online.
  Source: Source (https://www.firstenergycorp.com/content/dam/corporate/generationmap/files/FE-Harrison%20Fact%20Sheet.pdf)

## Sources

- [Microsoft Word - 2025 MATS Repeal Comments Final for signature (002)](https://downloads.regulations.gov/EPA-HQ-OAR-2018-0794-7266/attachment_1.pdf) — downloads.regulations.gov · tier regulatory
- [MBR | Index - Federal Energy Regulatory Commission](https://mbrweb.ferc.gov/SearchlkpEIA/Index?page=120) — mbrweb.ferc.gov · tier regulatory
- [Steam Electric Industry - EIA/NPDES ID Match-Up (XLSX)](https://echo.epa.gov/files/Steam%20Electric%20Industry%20-%20EIA%26NPDES%20ID%20Match-Up.xlsx) — echo.epa.gov · tier regulatory
- [WEST VIRGINIA ACTION GROUP v. PUBLIC SERVICE COMMISSION OF WEST VIRGINIA (2014) | FindLaw](https://caselaw.findlaw.com/wv-supreme-court-of-appeals/1664619.html) — caselaw.findlaw.com · tier other
- [Source](https://www.firstenergycorp.com/content/dam/corporate/generationmap/files/Harrison-Power-Station-fact-sheet.pdf) — firstenergycorp.com · tier other
- [Source](https://www.firstenergycorp.com/content/dam/corporate/generationmap/files/FE-Harrison%20Fact%20Sheet.pdf) — firstenergycorp.com · tier other
- [Finding Lost Megawatts at the Harrison Power Station](https://www.cw-connect.com/sites/default/files/2020-01/Finding_Lost_Megawatts_Harrison_Power_Station_2007.pdf) — cw-connect.com · tier other
- [CFB Repowering, SCR Retrofit and Distributed Generation Projects Tabbed as Projects of the Year](https://www.power-eng.com/operations-maintenance/cfb-repowering-scr-retrofit-and-distributed-generation-projects-tabbed-as-projects-of-the-year/) — power-eng.com · tier other
- [Boiler parts and services | Wood](https://www.woodgroup.com/solutions/expertise/boiler-parts-and-services) — woodgroup.com · tier other
- [Utility steam turbines](https://www.siemens-energy.com/global/en/home/products-services/product/utility-steam-turbines.html) — siemens-energy.com · tier other
- ['](https://www.psc.state.wv.us/scripts/orders/ViewDocument.cfm?CaseActivityID=406613&Source=Docket) — psc.state.wv.us · tier other
- [Source](https://firstenergycorp.com/content/dam/corporate/generationmap/files/Harrison-Power-Station-fact-sheet.pdf) — firstenergycorp.com · tier other
- [PSC order allows acquisition of Harrison Power Station | | wvnews.com](https://www.wvnews.com/psc-order-allows-acquisition-of-harrison-power-station/article_ec68898a-2f9b-11e3-9b56-0019bb2963f4.html) — wvnews.com · tier other
- [IEEFA-Kunkel-report-on-Harrison-acquisition. ...](https://ohiorivervalleyinstitute.org/wp-content/uploads/2021/04/IEEFA-Kunkel-report-on-Harrison-acquisition.pdf) — ohiorivervalleyinstitute.org · tier other
- [Mon Power and Potomac Edison Propose Environmental ...](https://www.firstenergycorp.com/newsroom/news_articles/mon-power-and-potomac-edison-propose-environmental-compliance-pr.html) — firstenergycorp.com · tier other
- [Utilities agree with conditions for purchase of W.Va power station](https://www.power-eng.com/coal/utilities-agree-with-conditions-for-purchase-of-w-va-power-station/) — power-eng.com · tier other
- [Source](https://www.sec.gov/Archives/edgar/data/1031296/000103129613000054/fe-09302013x10q.htm) — sec.gov · tier regulatory
- [PUBLIC SERVICE COMMISSION OF WEST VIRGINIA CHARLESTON October 7,2013 CASE NO. 12-1571-E-PC MONONGAHELA POWER COMPANY and THE POTOMAC EDISON COMPANY](https://www.psc.state.wv.us/scripts/WebDocket/ViewDocument.cfm?CaseActivityID=380383) — psc.state.wv.us · tier other
- [202 Annual Report 4](https://www.sec.gov/Archives/edgar/data/1031296/000119312525071860/d856291dars.pdf) — sec.gov · tier regulatory
- [First Energy CEO Says Gas Will Replace Mon Power Coal ...](https://wvpublic.org/story/energy-environment/first-energy-ceo-says-gas-will-replace-mon-power-coal-plants/) — wvpublic.org · tier other
- [Sheet1](https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2025-2026/2025-2026-rpm-existing-resource-list-post.xlsx) — pjm.com · tier other
- [PJM 'Data Center Planning Initiative'](https://protectpwc.org/wp-content/uploads/2023/09/2022-PJM-RTEP-Window-3-Loudoun-County-VA-impacting-Proposals092223.pdf) — protectpwc.org · tier other
- [Generation System](https://www.firstenergycorp.com/about/generation_system.html) — firstenergycorp.com · tier other

## Data quality

- The EIA record reports 2,052 MW of nameplate capacity, while FirstEnergy's official fact sheet reports 1,984 MW of net output; these are different capacity measures. The October 2013 transaction value was an intra-FirstEnergy asset purchase and swap. The cited records identify transaction consideration and regulatory accounting amounts, but no separate project-finance debt facility or construction-financing instrument. The documented 1995 scrubber installation and subsequent environmental controls are environmental retrofits.

---

Canonical page: https://askthegrid.com/assets/facilities/firstenergy-harrison-power-station

Source: Ask the Grid — https://askthegrid.com/
