# Fowler Ridge Wind Farm LLC

PJM Onshore Wind Turbine · https://askthegrid.com/assets/facilities/fowler-ridge-wind-farm-llc

Fowler Ridge Wind Farm LLC is a wind power facility with 588.3 MW of EIA-reported operating capacity in Benton County, Indiana, registered as EIA Plant ID 56777. AE Power Services LLC is the registered plant entity or operator. It operates in the PJM market and has five operational generating units. Commercial operation began in January 2009.

## Key facts

- Technology: Onshore Wind Turbine
- Power capacity: 588.3 MW
- Operating status: operating

## Grid and market context

- ISO/RTO: PJM
- Balancing authority: PJM

## Source-backed facts

- Owner logo domain: clearlightenergy.com — LS Power Completes Acquisition of bp's US Onshore Wind Business - LS Power · confidence: medium
- Owner logo domain: clearlightenergy.com — Fowler Ridge 1 - Clearlight Energy · confidence: medium
- Official project url: https://clearlightenergy.com/blog/project-location/fowler-ridge-1/ — Fowler Ridge 1 - Clearlight Energy · confidence: medium
- Description: Fowler Ridge Wind Farm LLC is EIA plant 56777, an operating onshore wind facility in Benton County, Indiana. The plant has 588.3 MW of nameplate capacity and five operating generating units, with FERC records placing generator IDs FIA, FIB, FII, and FIII under the same plant code in PJM. The associated Fowler Ridge assets were transferred from bp to LS Power’s Clearlight Energy platform in a transaction that closed December 9, 2025. — LS Power Completes Acquisition of bp's US Onshore Wind Business - LS Power · confidence: medium
- Parties.0: {"relationship":"Current owner and operator platform","name":"Clearlight Energy","official_url":"https://clearlightenergy.com/"} — LS Power Completes Acquisition of bp's US Onshore Wind Business - LS Power · confidence: medium
- Parties.0: {"relationship":"Current owner and operator platform","name":"Clearlight Energy","official_url":"https://clearlightenergy.com/"} — Fowler Ridge 1 - Clearlight Energy · confidence: medium
- Parties.1: {"relationship":"Parent / portfolio owner","name":"LS Power","official_url":"https://www.lspower.com/"} — LS Power Completes Acquisition of bp's US Onshore Wind Business - LS Power · confidence: medium
- Parties.6: {"relationship":"Wind-turbine upgrade OEM/service provider","name":"Vestas North America","official_url":"https://www.vestas.com/"} — bp boosts renewable energy production and efficiency with technology upgrades at Indiana wind farm | News and stories | bp America · confidence: high
- Product url: https://www.vestas.com/en/energy-solutions/onshore-wind-turbines/2-mw-platform/V120-2-2-MW — V120-2.2 MW™ · confidence: high
- Product url: https://www.vestas.com/en/energy-solutions/onshore-wind-turbines/2-mw-platform/V120-2-2-MW — Life cycle assessment of electricity produced from onshore... · confidence: high
- Equipment models: [{"manufacturer_domain":"vestas.com","product_url":"https://www.vestas.com/content/dam/vestas-com/global/en/sustainability/reports-and-ratings/lcas/LCA%20V82165%20MW%20onshore2007.pdf.coredownload.inline.pdf","count":182,"unit_mw":1.65,"name":"Vestas V82-1.65"},{"manufacturer_domain":"gevernova.com","product_url":"https://www.gevernova.com/wind-power/wind-turbines","count":133,"unit_mw":1.5,"name":"GE 1.5sle"},{"manufacturer_domain":"vestas.com","product_url":"https://www.vestas.com/en/energy-solutions/onshore-wind-turbines/2-mw-platform/V120-2-2-MW","count":40,"unit_mw":2.2,"name":"Vestas V120-2.2"}] — V120-2.2 MW™ · confidence: medium
- Product family: Vestas V82-1.65, GE 1.5sle, and Vestas V120-2.2 — V120-2.2 MW™ · confidence: medium
- Equipment models.2: {"manufacturer_domain":"vestas.com","product_url":"https://www.vestas.com/en/energy-solutions/onshore-wind-turbines/2-mw-platform/V120-2-2-MW","count":40,"unit_mw":2.2,"name":"Vestas V120-2.2"} — V120-2.2 MW™ · confidence: medium
- Description: Fowler Ridge Wind Farm LLC is a 588.3-MW operating onshore wind plant in Benton County, Indiana, with five operating units in PJM. Its plant record reflects the Fowler Ridge I–III buildout, constructed in 2008–09; Phases I and III became operational in January 2009 and Phase II was operational by December 31, 2009. BP historically owned the associated Fowler Ridge assets with partners, acquired Dominion’s remaining 50% interest in Fowler Ridge 1 in July 2020, and sold its U.S. onshore wind business to LS Power in a transaction completed December 9, 2025. The assets are now operated through LS Power portfolio company Clearlight Energy; BP also completed a 40-turbine Fowler Ridge 1 upgrade in November 2023. — 2017 Fowler Ridge Wind Farm · confidence: medium
- Description: Fowler Ridge Wind Farm LLC is a 588.3-MW operating onshore wind plant in Benton County, Indiana, with five operating units in PJM. Its plant record reflects the Fowler Ridge I–III buildout, constructed in 2008–09; Phases I and III became operational in January 2009 and Phase II was operational by December 31, 2009. BP historically owned the associated Fowler Ridge assets with partners, acquired Dominion’s remaining 50% interest in Fowler Ridge 1 in July 2020, and sold its U.S. onshore wind business to LS Power in a transaction completed December 9, 2025. The assets are now operated through LS Power portfolio company Clearlight Energy; BP also completed a 40-turbine Fowler Ridge 1 upgrade in November 2023. — Source · confidence: medium
- Description: Fowler Ridge Wind Farm LLC is a 588.3-MW operating onshore wind plant in Benton County, Indiana, with five operating units in PJM. Its plant record reflects the Fowler Ridge I–III buildout, constructed in 2008–09; Phases I and III became operational in January 2009 and Phase II was operational by December 31, 2009. BP historically owned the associated Fowler Ridge assets with partners, acquired Dominion’s remaining 50% interest in Fowler Ridge 1 in July 2020, and sold its U.S. onshore wind business to LS Power in a transaction completed December 9, 2025. The assets are now operated through LS Power portfolio company Clearlight Energy; BP also completed a 40-turbine Fowler Ridge 1 upgrade in November 2023. — bp boosts renewable energy production and efficiency with technology upgrades at Indiana wind farm | News and stories | bp America · confidence: medium
- Quality notes: ["The 588.3-MW EIA plant record is kept separate from broader Fowler Ridge complex descriptions totaling 750 MW that include Phase IV; Phase IV is not added to this plant's capacity or history.","Plant-operator naming is not uniform across available records: one plant directory identifies Clearlight Energy as operator, while another plant record identifies AE Power Services LLC. Clearlight is treated as the current platform-level owner/operator following the 2025 transaction, with AE Power Services retained as an associated registered operating entity.","The original construction cost and any separate construction-financing amount were not disclosed in the cited project account. The approximately $100 million disclosed by BP relates to the 2023 turbine upgrade, not sale consideration or original project financing.","No retirement or decommissioning milestone is identified in the cited records; the latest plant record describes the facility as operational."] — 2017 Fowler Ridge Wind Farm · confidence: medium
- Quality notes: ["The 588.3-MW EIA plant record is kept separate from broader Fowler Ridge complex descriptions totaling 750 MW that include Phase IV; Phase IV is not added to this plant's capacity or history.","Plant-operator naming is not uniform across available records: one plant directory identifies Clearlight Energy as operator, while another plant record identifies AE Power Services LLC. Clearlight is treated as the current platform-level owner/operator following the 2025 transaction, with AE Power Services retained as an associated registered operating entity.","The original construction cost and any separate construction-financing amount were not disclosed in the cited project account. The approximately $100 million disclosed by BP relates to the 2023 turbine upgrade, not sale consideration or original project financing.","No retirement or decommissioning milestone is identified in the cited records; the latest plant record describes the facility as operational."] — bp boosts renewable energy production and efficiency with technology upgrades at Indiana wind farm | News and stories | bp America · confidence: medium
- Quality notes: ["The 588.3-MW EIA plant record is kept separate from broader Fowler Ridge complex descriptions totaling 750 MW that include Phase IV; Phase IV is not added to this plant's capacity or history.","Plant-operator naming is not uniform across available records: one plant directory identifies Clearlight Energy as operator, while another plant record identifies AE Power Services LLC. Clearlight is treated as the current platform-level owner/operator following the 2025 transaction, with AE Power Services retained as an associated registered operating entity.","The original construction cost and any separate construction-financing amount were not disclosed in the cited project account. The approximately $100 million disclosed by BP relates to the 2023 turbine upgrade, not sale consideration or original project financing.","No retirement or decommissioning milestone is identified in the cited records; the latest plant record describes the facility as operational."] — Top Plants: Fowler Ridge Wind Farm, Benton County, Indiana · confidence: medium
- Financing summary: The cited 2009 project account states that the exact construction cost was confidential and does not disclose a separate project-financing amount or structure. BP disclosed an approximately $100 million capital investment for the November 2023 upgrade of 40 Fowler Ridge 1 turbines; this was repowering or upgrade capex, not acquisition consideration. The 2025 BP-to-LS Power portfolio transaction value was not disclosed. — Top Plants: Fowler Ridge Wind Farm, Benton County, Indiana · confidence: medium
- Financing summary: The cited 2009 project account states that the exact construction cost was confidential and does not disclose a separate project-financing amount or structure. BP disclosed an approximately $100 million capital investment for the November 2023 upgrade of 40 Fowler Ridge 1 turbines; this was repowering or upgrade capex, not acquisition consideration. The 2025 BP-to-LS Power portfolio transaction value was not disclosed. — bp boosts renewable energy production and efficiency with technology upgrades at Indiana wind farm | News and stories | bp America · confidence: medium
- Financing summary: The cited 2009 project account states that the exact construction cost was confidential and does not disclose a separate project-financing amount or structure. BP disclosed an approximately $100 million capital investment for the November 2023 upgrade of 40 Fowler Ridge 1 turbines; this was repowering or upgrade capex, not acquisition consideration. The 2025 BP-to-LS Power portfolio transaction value was not disclosed. — BP to sell US onshore wind business to LS Power for... · confidence: medium
- Commercial parties.0: {"relationship":"Current owner and operator platform","name":"Clearlight Energy","detail":"LS Power portfolio company that operates the acquired U.S. wind assets, including the Fowler Ridge assets, following the December 2025 closing.","official_url":"https://clearlightenergy.com/"} — Source · confidence: medium
- Commercial parties.1: {"relationship":"Parent and 2025 portfolio acquirer","name":"LS Power","detail":"Acquired BP Wind Energy North America, including the Fowler Ridge interests, in a transaction completed December 9, 2025.","official_url":"https://www.lspower.com/"} — Source · confidence: medium
- Commercial parties.2: {"relationship":"Historical owner and 2025 seller","name":"BP Wind Energy North America / bp","detail":"Historically owned and operated Fowler Ridge assets, acquired Dominion's remaining Fowler Ridge 1 interest in 2020, funded the 2023 Fowler Ridge 1 upgrade, and sold its U.S. onshore wind business to LS Power in 2025.","official_url":"https://www.bp.com/"} — Source · confidence: high
- Commercial parties.4: {"relationship":"Historical Fowler Ridge II partner","name":"Sempra Generation","detail":"Acquired a 50% stake in Fowler Ridge II from BP Wind Energy in September 2009 for an undisclosed sum.","official_url":"https://www.sempra.com/"} — Sempra buys into BP's Fowler Ridge II wind farm · confidence: medium
- Commercial parties.7: {"relationship":"Turbine OEM and upgrade supplier","name":"Vestas North America","detail":"Supplied the new blades and nacelles used in BP's 2023 upgrade of 40 Fowler Ridge 1 turbines; Vestas turbines are also identified in the original Fowler Ridge configuration.","official_url":"https://www.vestas.com/"} — bp boosts renewable energy production and efficiency with technology upgrades at Indiana wind farm | News and stories | bp America · confidence: high
- Timeline.1: {"event":"Predecessor ownership transfer","date":"2007","detail":"The developed project was sold to BP and Dominion Resources, establishing the historical ownership structure that preceded the later phase-specific partnerships."} — 2017 Fowler Ridge Wind Farm · confidence: medium
- Timeline.2: {"event":"Construction of Phases I and III","date":"2008","detail":"Government wildlife-monitoring records state that Fowler Ridge Phases I and III were constructed in 2008."} — 2017 Fowler Ridge Wind Farm · confidence: high
- Timeline.3: {"event":"Initial commercial operation","date":"2009-01","detail":"Phases I and III became operational during January 2009; the plant directory identifies the first unit as online in 2009."} — Sempra buys into BP's Fowler Ridge II wind farm · confidence: medium
- Timeline.4: {"event":"Phase II ownership transaction","date":"2009-09","detail":"Sempra Generation acquired a 50% stake in Fowler Ridge II from BP Wind Energy for an undisclosed sum."} — 2017 Fowler Ridge Wind Farm · confidence: high
- Timeline.7: {"event":"Fowler Ridge 1 turbine upgrade","date":"2023-11","detail":"BP completed an upgrade of 40 turbines, installing 120 blades and 40 new nacelles supplied by Vestas; BP disclosed capital investment of approximately $100 million."} — Source · confidence: medium
- Timeline.8: {"event":"BP agreed to sell its U.S. onshore wind business","date":"2025-07","detail":"BP agreed to sell BP Wind Energy North America, including its Fowler Ridge 1, Fowler Ridge 2, and Fowler Ridge 3 interests, to LS Power. The transaction value was not disclosed."} — Source · confidence: high
- Acquisition date: 2025-12-09 — Source · confidence: high
- Seller: bp Wind Energy North America Inc. (bp) — Source · confidence: high
- Interconnection voltage kv: 345 — 5150-34: · confidence: medium

## Timeline

- 2008 — Construction of Phases I and III
  Government wildlife-monitoring records state that Fowler Ridge Phases I and III were constructed in 2008.
  Source: 2017 Fowler Ridge Wind Farm (https://www.fws.gov/sites/default/files/documents/Fowler%20Ridge%202017.pdf)
- 2009-01 — Initial commercial operation
  Phases I and III became operational during January 2009; the plant directory identifies the first unit as online in 2009.
  Source: 2017 Fowler Ridge Wind Farm (https://www.fws.gov/sites/default/files/documents/Fowler%20Ridge%202017.pdf)
- 2009-12-31 — Phase II commercial operation
  Phase II was constructed in 2009 and became operational by December 31, 2009.
  Source: 2017 Fowler Ridge Wind Farm (https://www.fws.gov/sites/default/files/documents/Fowler%20Ridge%202017.pdf)
- 2023-11 — Fowler Ridge 1 turbine upgrade
  BP completed an upgrade of 40 turbines, installing 120 blades and 40 new nacelles supplied by Vestas; BP disclosed capital investment of approximately $100 million.
  Source: bp boosts renewable energy production and efficiency with technology upgrades at Indiana wind farm | News and stories | bp America (https://www.bp.com/en_us/united-states/home/news/press-releases/bp-boosts-renewable-energy-production-and-efficiency-with-technology-upgrades-at-indiana-wind-farm.html)

## Sources

- [LS Power Completes Acquisition of bp's US Onshore Wind Business - LS Power](https://www.lspower.com/news/ls-power-completes-acquisition-of-bp-us-onshore-wind-business/) — lspower.com · tier other
- [Fowler Ridge 1 - Clearlight Energy](https://clearlightenergy.com/blog/project-location/fowler-ridge-1/) — clearlightenergy.com · tier other
- [bp boosts renewable energy production and efficiency with technology upgrades at Indiana wind farm | News and stories | bp America](https://www.bp.com/en_us/united-states/home/news/press-releases/bp-boosts-renewable-energy-production-and-efficiency-with-technology-upgrades-at-indiana-wind-farm.html) — bp.com · tier other
- [V120-2.2 MW™](https://www.vestas.com/en/energy-solutions/onshore-wind-turbines/2-mw-platform/V120-2-2-MW) — vestas.com · tier other
- [Life cycle assessment of electricity produced from onshore ...](https://www.vestas.com/content/dam/vestas-com/global/en/sustainability/reports-and-ratings/lcas/LCA%20V82165%20MW%20onshore2007.pdf.coredownload.inline.pdf) — vestas.com · tier other
- [2017 Fowler Ridge Wind Farm](https://www.fws.gov/sites/default/files/documents/Fowler%20Ridge%202017.pdf) — fws.gov · tier regulatory
- [Source](https://lspower.com/news/ls-power-completes-acquisition-of-bp-us-onshore-wind-business) — lspower.com · tier other
- [Top Plants: Fowler Ridge Wind Farm, Benton County, Indiana](https://www.powermag.com/top-plants-fowler-ridge-wind-farm-benton-county-indiana/) — powermag.com · tier other
- [BP to sell US onshore wind business to LS Power for ...](https://www.reuters.com/business/energy/bp-sell-us-onshore-wind-business-ls-power-undisclosed-sum-2025-07-18/) — reuters.com · tier other
- [Sempra buys into BP's Fowler Ridge II wind farm](https://www.rechargenews.com/wind/sempra-buys-into-bps-fowler-ridge-ii-wind-farm/1-1-861208) — rechargenews.com · tier other
- [Source](https://lspower.com/news/ls-power-to-acquire-bps-us-onshore-wind-business) — lspower.com · tier other
- [5150-34:](https://www.psc.state.wv.us/scripts/WebDocket/ViewDocument.cfm?CaseActivityID=323462&NotType=%27WebDocket%27) — psc.state.wv.us · tier other

## Data quality

- The 588.3-MW EIA plant record is kept separate from broader Fowler Ridge complex descriptions totaling 750 MW that include Phase IV; Phase IV is not added to this plant's capacity or history. Plant-operator naming is not uniform across available records: one plant directory identifies Clearlight Energy as operator, while another plant record identifies AE Power Services LLC. Clearlight is treated as the current platform-level owner/operator following the 2025 transaction, with AE Power Services retained as an associated registered operating entity. The original construction cost and any separate construction-financing amount were not disclosed in the cited project account. The approximately $100 million disclosed by BP relates to the 2023 turbine upgrade, not sale consideration or original project financing. No retirement or decommissioning milestone is identified in the cited records; the latest plant record describes the facility as operational.

---