Fremont Energy Center is a natural gas-fired power facility with 739.5 MW of EIA-reported nameplate capacity in Sandusky County, Ohio, registered as EIA Plant ID 55701. American Municipal Power, Inc. is the current owner; American Mun Power-Ohio, Inc is the registered plant entity or operator. American Municipal Power, Inc. acquired the project from FirstEnergy Generation Corp. on July 28, 2011.

## Key facts

- Technology: Natural Gas Fired Combined Cycle
- Power capacity: 739.5 MW
- Operating status: operating

## Grid and market context

- ISO/RTO: PJM
- Balancing authority: PJM
- Substation: West Fremont 138 kV and AEP Fremont 138 kV
- Point of interconnection: West Fremont 138 kV and AEP Fremont 138 kV
- Transmission owner: American Transmission Systems, Inc. (ATSI), a FirstEnergy company, for West Fremont; AEP for Fremont
- Interconnection voltage: 138 kV

## Source-backed facts

- Identifiers: [{"value":"55701","system":"EIA plant code"},{"value":"40577","system":"EIA utility ID"},{"value":"CA01","system":"EIA generator ID"},{"value":"CT01","system":"EIA generator ID"},{"value":"CT02","system":"EIA generator ID"},{"value":"17469","system":"FERC MBR EIA cross-reference ID"},{"value":"17470","system":"FERC MBR EIA cross-reference ID"},{"value":"17471","system":"FERC MBR EIA cross-reference ID"},{"value":"PJM","system":"RTO/transmission area"}] — MBR | Index · confidence: medium
- Identifiers: [{"value":"55701","system":"EIA plant code"},{"value":"40577","system":"EIA utility ID"},{"value":"CA01","system":"EIA generator ID"},{"value":"CT01","system":"EIA generator ID"},{"value":"CT02","system":"EIA generator ID"},{"value":"17469","system":"FERC MBR EIA cross-reference ID"},{"value":"17470","system":"FERC MBR EIA cross-reference ID"},{"value":"17471","system":"FERC MBR EIA cross-reference ID"},{"value":"PJM","system":"RTO/transmission area"}] — https://www.amppartners.org/docs/default-source/bonds/downloads/afec/amp-fremont-energy-center-project-refunding-series-2021a.pdf?sfvrsn=2 · confidence: medium
- Official project url: https://www.amppartners.org/generation/fossil-fuels/fremont-energy-center/ — AMP Fremont Energy Center | American Municipal Power · confidence: high
- Description: Fremont Energy Center is a 739.5 MW natural-gas combined-cycle generating plant in Fremont, Sandusky County, Ohio. EIA records identify three generators—CA01, CT01, and CT02—and list American Mun Power-Ohio, Inc. as the utility. The facility reached full commercial operation in January 2012 and is located in the PJM transmission area. AMP materials describe the AFEC project as having 512 MW of unfired capacity plus 163 MW of duct-firing capability. — MBR | Index · confidence: medium
- Description: Fremont Energy Center is a 739.5 MW natural-gas combined-cycle generating plant in Fremont, Sandusky County, Ohio. EIA records identify three generators—CA01, CT01, and CT02—and list American Mun Power-Ohio, Inc. as the utility. The facility reached full commercial operation in January 2012 and is located in the PJM transmission area. AMP materials describe the AFEC project as having 512 MW of unfired capacity plus 163 MW of duct-firing capability. — https://www.amppartners.org/docs/default-source/bonds/downloads/afec/amp-fremont-energy-center-project-refunding-series-2021a.pdf?sfvrsn=2 · confidence: medium
- Parties: [{"relationship":"Majority owner and project sponsor","name":"American Municipal Power, Inc.","official_url":"https://www.amppartners.org/"},{"relationship":"5.16% undivided co-owner","name":"Michigan Public Power Agency","official_url":"https://www.mpower.org/"},{"relationship":"4.15% ownership held through AMP","name":"Central Virginia Electric Cooperative","official_url":null},{"relationship":"Plant operations and startup/O&M service provider","name":"NAES Corporation","official_url":"https://www.naes.com/"},{"relationship":"Developer","name":"CME Energy","official_url":"https://cme-energy.com/"},{"relationship":"Development partner","name":"Calpine Energy","official_url":"https://www.calpine.com/"},{"relationship":"Combustion-turbine and steam-turbine OEM","name":"Siemens Westinghouse","official_url":"https://www.siemens-energy.com/"},{"relationship":"Heat-recovery steam-generator supplier","name":"Nooter-Eriksen","official_url":null},{"relationship":"Former owner and seller to AMP","name":"FirstEnergy Generation Corporation","official_url":"https://www.firstenergycorp.com/"}] — AMP Fremont Energy Center Project (AFEC) – Michigan Public Power Agency · confidence: medium
- Parties: [{"relationship":"Majority owner and project sponsor","name":"American Municipal Power, Inc.","official_url":"https://www.amppartners.org/"},{"relationship":"5.16% undivided co-owner","name":"Michigan Public Power Agency","official_url":"https://www.mpower.org/"},{"relationship":"4.15% ownership held through AMP","name":"Central Virginia Electric Cooperative","official_url":null},{"relationship":"Plant operations and startup/O&M service provider","name":"NAES Corporation","official_url":"https://www.naes.com/"},{"relationship":"Developer","name":"CME Energy","official_url":"https://cme-energy.com/"},{"relationship":"Development partner","name":"Calpine Energy","official_url":"https://www.calpine.com/"},{"relationship":"Combustion-turbine and steam-turbine OEM","name":"Siemens Westinghouse","official_url":"https://www.siemens-energy.com/"},{"relationship":"Heat-recovery steam-generator supplier","name":"Nooter-Eriksen","official_url":null},{"relationship":"Former owner and seller to AMP","name":"FirstEnergy Generation Corporation","official_url":"https://www.firstenergycorp.com/"}] — AMP – Fremont Energy Center - NAES · confidence: medium
- Parties: [{"relationship":"Majority owner and project sponsor","name":"American Municipal Power, Inc.","official_url":"https://www.amppartners.org/"},{"relationship":"5.16% undivided co-owner","name":"Michigan Public Power Agency","official_url":"https://www.mpower.org/"},{"relationship":"4.15% ownership held through AMP","name":"Central Virginia Electric Cooperative","official_url":null},{"relationship":"Plant operations and startup/O&M service provider","name":"NAES Corporation","official_url":"https://www.naes.com/"},{"relationship":"Developer","name":"CME Energy","official_url":"https://cme-energy.com/"},{"relationship":"Development partner","name":"Calpine Energy","official_url":"https://www.calpine.com/"},{"relationship":"Combustion-turbine and steam-turbine OEM","name":"Siemens Westinghouse","official_url":"https://www.siemens-energy.com/"},{"relationship":"Heat-recovery steam-generator supplier","name":"Nooter-Eriksen","official_url":null},{"relationship":"Former owner and seller to AMP","name":"FirstEnergy Generation Corporation","official_url":"https://www.firstenergycorp.com/"}] — Fremont Energy Center, Ohio – CME Energy · confidence: medium
- Canonical name: Fremont Energy Center — AMP Fremont Energy Center | American Municipal Power · confidence: high
- Identifiers.0: {"value":"55701","system":"EIA plant code"} — MBR | Index · confidence: high
- Identifiers.2: {"value":"CA01","system":"EIA generator ID"} — MBR | Index · confidence: high
- Identifiers.3: {"value":"CT01","system":"EIA generator ID"} — MBR | Index · confidence: high
- Identifiers.4: {"value":"CT02","system":"EIA generator ID"} — Source · confidence: high
- Identifiers.5: {"value":"17469","system":"FERC MBR EIA cross-reference ID"} — MBR | Index · confidence: high
- Identifiers.6: {"value":"17470","system":"FERC MBR EIA cross-reference ID"} — MBR | Index · confidence: high
- Identifiers.8: {"value":"PJM","system":"RTO/transmission area"} — https://www.amppartners.org/docs/default-source/bonds/downloads/afec/amp-fremont-energy-center-project-refunding-series-2021a.pdf?sfvrsn=2 · confidence: medium
- Parties.1: {"relationship":"5.16% undivided co-owner","name":"Michigan Public Power Agency","official_url":"https://www.mpower.org/"} — AMP Fremont Energy Center Project (AFEC) – Michigan Public Power Agency · confidence: high
- Parties.3: {"relationship":"Plant operations and startup/O&M service provider","name":"NAES Corporation","official_url":"https://www.naes.com/"} — AMP – Fremont Energy Center - NAES · confidence: medium
- Parties.4: {"relationship":"Developer","name":"CME Energy","official_url":"https://cme-energy.com/"} — Fremont Energy Center, Ohio – CME Energy · confidence: high
- Parties.5: {"relationship":"Development partner","name":"Calpine Energy","official_url":"https://www.calpine.com/"} — Fremont Energy Center, Ohio – CME Energy · confidence: medium
- Parties.6: {"relationship":"Combustion-turbine and steam-turbine OEM","name":"Siemens Westinghouse","official_url":"https://www.siemens-energy.com/"} — AMP Fremont Energy Center Project (AFEC) – Michigan Public Power Agency · confidence: medium
- Parties.7: {"relationship":"Heat-recovery steam-generator supplier","name":"Nooter-Eriksen","official_url":null} — AMP Fremont Energy Center Project (AFEC) – Michigan Public Power Agency · confidence: medium
- Parties.8: {"relationship":"Former owner and seller to AMP","name":"FirstEnergy Generation Corporation","official_url":"https://www.firstenergycorp.com/"} — Fremont Energy Center, Ohio – CME Energy · confidence: high
- Product url: https://www.siemens-energy.com/global/en/home/products-services/product-offerings/gas-turbines.html — Aeroderivative, Industrial and Heavy-Duty Gas Turbines · confidence: medium
- Manufacturer domain: siemens-energy.com — Aeroderivative, Industrial and Heavy-Duty Gas Turbines · confidence: medium
- Significance: Fremont Energy Center is a 2×1 natural-gas combined-cycle facility with 512 MW of unfired capacity and 163 MW of duct-firing capability for peak-demand periods. It reached full commercial operation on 2026-01-20. — AMP Fremont Energy Center | American Municipal Power · confidence: medium
- Description: Fremont Energy Center is a natural-gas-fired combined-cycle plant comprising two combustion turbines, two heat-recovery steam generators, and one steam turbine and condenser. American Municipal Power, Inc. owns 90.69% on behalf of participating AMP members and 4.15% on behalf of Central Virginia Electric Cooperative; Michigan Public Power Agency owns the remaining 5.16%. Calpine originally developed the project and broke ground in 2001, while FirstEnergy acquired the partially completed facility in January 2008 and completed construction in June 2011. AMP acquired the facility from FirstEnergy Generation Corporation on 2011-07-28, and the plant entered full commercial operation on 2026-01-20. — AMP Fremont Energy Center Project (AFEC) – Michigan Public Power Agency · confidence: medium
- Financing summary: FirstEnergy's sale to AMP closed on 2011-07-28 for $510 million based on 685 MW of output; contemporaneous announcements described the consideration as more than $500 million. This was sale consideration, not project financing. To provide permanent financing for AMP's 90.69% interest, AMP issued two series of 2012 Fremont Energy Center Project Revenue Bonds totaling $546.085 million, consisting of taxable and tax-exempt obligations and secured by the project power-sales structure; Series 2012B had an aggregate par amount of $124.385 million and was issued on 2012-06-29. AMP later issued $269.52 million of Series 2021A refunding bonds, while MPPA separately used revenue bonds secured by take-or-pay contracts to finance its 5.16% interest; the MPPA amount is not disclosed in the cited material. — FE-12.31.2011-10K · confidence: medium
- Financing summary: FirstEnergy's sale to AMP closed on 2011-07-28 for $510 million based on 685 MW of output; contemporaneous announcements described the consideration as more than $500 million. This was sale consideration, not project financing. To provide permanent financing for AMP's 90.69% interest, AMP issued two series of 2012 Fremont Energy Center Project Revenue Bonds totaling $546.085 million, consisting of taxable and tax-exempt obligations and secured by the project power-sales structure; Series 2012B had an aggregate par amount of $124.385 million and was issued on 2012-06-29. AMP later issued $269.52 million of Series 2021A refunding bonds, while MPPA separately used revenue bonds secured by take-or-pay contracts to finance its 5.16% interest; the MPPA amount is not disclosed in the cited material. — Source · confidence: medium
- Financing summary: FirstEnergy's sale to AMP closed on 2011-07-28 for $510 million based on 685 MW of output; contemporaneous announcements described the consideration as more than $500 million. This was sale consideration, not project financing. To provide permanent financing for AMP's 90.69% interest, AMP issued two series of 2012 Fremont Energy Center Project Revenue Bonds totaling $546.085 million, consisting of taxable and tax-exempt obligations and secured by the project power-sales structure; Series 2012B had an aggregate par amount of $124.385 million and was issued on 2012-06-29. AMP later issued $269.52 million of Series 2021A refunding bonds, while MPPA separately used revenue bonds secured by take-or-pay contracts to finance its 5.16% interest; the MPPA amount is not disclosed in the cited material. — AMP-2024-Financial-Statements-with-... · confidence: medium
- Financing summary: FirstEnergy's sale to AMP closed on 2011-07-28 for $510 million based on 685 MW of output; contemporaneous announcements described the consideration as more than $500 million. This was sale consideration, not project financing. To provide permanent financing for AMP's 90.69% interest, AMP issued two series of 2012 Fremont Energy Center Project Revenue Bonds totaling $546.085 million, consisting of taxable and tax-exempt obligations and secured by the project power-sales structure; Series 2012B had an aggregate par amount of $124.385 million and was issued on 2012-06-29. AMP later issued $269.52 million of Series 2021A refunding bonds, while MPPA separately used revenue bonds secured by take-or-pay contracts to finance its 5.16% interest; the MPPA amount is not disclosed in the cited material. — https://www.amppartners.org/docs/default-source/bonds/downloads/afec/amp-fremont-energy-center-project-refunding-series-2021a.pdf?sfvrsn=2 · confidence: medium
- Timeline: [{"event":"Project development and groundbreaking","date":"2001","detail":"CME Energy and Calpine developed the project, which broke ground in 2001."},{"event":"Calpine bankruptcy and auction","date":"2005-2007","detail":"Calpine filed for bankruptcy in 2005, suspended construction, and the partially completed facility was auctioned in 2007; FirstEnergy won the auction after outbidding AMP."},{"event":"FirstEnergy acquisition","date":"2008-01","detail":"FirstEnergy acquired the partially completed plant from Calpine in its bankruptcy proceeding for approximately $253.6 million and resumed construction."},{"event":"Commissioning preparation","date":"2010","detail":"FirstEnergy contracted PIC for commissioning activities; gas blows and steam blows were performed in October 2010."},{"event":"AMP negotiations and definitive agreement","date":"2011-02-09","detail":"AMP and FirstEnergy announced a non-binding memorandum of understanding in February 2011, followed by a definitive asset-purchase agreement dated 2011-03-11."},{"event":"Construction completion","date":"2011-06","detail":"FirstEnergy completed construction in June 2011, with the facility mechanically complete and proceeding through commissioning."},{"event":"Acquisition and sale closing","date":"2011-07-28","detail":"AMP acquired Fremont Energy Center from FirstEnergy Generation Corporation; the transaction closed for $510 million, or more than $500 million in contemporaneous public announcements."},{"event":"Full commercial operation","date":"2012-01-20","detail":"AMP declared the facility to be in full commercial operation after commissioning and testing."},{"event":"Permanent project financing","date":"2012","detail":"AMP issued two series of Fremont Energy Center Project Revenue Bonds totaling $546.085 million to provide permanent financing for its 90.69% interest; the bonds included taxable and tax-exempt obligations."},{"event":"Tax-exempt bond refunding","date":"2018-12-20","detail":"AMP issued bonds to refund all callable tax-exempt Fremont Energy Center bonds issued in 2012."},{"event":"Series 2021A refunding","date":"2021","detail":"AMP issued $269.52 million of Series 2021A Fremont Energy Center Project Revenue Bonds to partially refund Series 2012B bonds."}] — AMP Signs MOU with FirstEnergy on Fremont Energy Center | American Municipal Power · confidence: medium
- Timeline: [{"event":"Project development and groundbreaking","date":"2001","detail":"CME Energy and Calpine developed the project, which broke ground in 2001."},{"event":"Calpine bankruptcy and auction","date":"2005-2007","detail":"Calpine filed for bankruptcy in 2005, suspended construction, and the partially completed facility was auctioned in 2007; FirstEnergy won the auction after outbidding AMP."},{"event":"FirstEnergy acquisition","date":"2008-01","detail":"FirstEnergy acquired the partially completed plant from Calpine in its bankruptcy proceeding for approximately $253.6 million and resumed construction."},{"event":"Commissioning preparation","date":"2010","detail":"FirstEnergy contracted PIC for commissioning activities; gas blows and steam blows were performed in October 2010."},{"event":"AMP negotiations and definitive agreement","date":"2011-02-09","detail":"AMP and FirstEnergy announced a non-binding memorandum of understanding in February 2011, followed by a definitive asset-purchase agreement dated 2011-03-11."},{"event":"Construction completion","date":"2011-06","detail":"FirstEnergy completed construction in June 2011, with the facility mechanically complete and proceeding through commissioning."},{"event":"Acquisition and sale closing","date":"2011-07-28","detail":"AMP acquired Fremont Energy Center from FirstEnergy Generation Corporation; the transaction closed for $510 million, or more than $500 million in contemporaneous public announcements."},{"event":"Full commercial operation","date":"2012-01-20","detail":"AMP declared the facility to be in full commercial operation after commissioning and testing."},{"event":"Permanent project financing","date":"2012","detail":"AMP issued two series of Fremont Energy Center Project Revenue Bonds totaling $546.085 million to provide permanent financing for its 90.69% interest; the bonds included taxable and tax-exempt obligations."},{"event":"Tax-exempt bond refunding","date":"2018-12-20","detail":"AMP issued bonds to refund all callable tax-exempt Fremont Energy Center bonds issued in 2012."},{"event":"Series 2021A refunding","date":"2021","detail":"AMP issued $269.52 million of Series 2021A Fremont Energy Center Project Revenue Bonds to partially refund Series 2012B bonds."}] — FirstEnergy Completes Sale of Fremont Energy Center to AMP · confidence: medium
- Timeline: [{"event":"Project development and groundbreaking","date":"2001","detail":"CME Energy and Calpine developed the project, which broke ground in 2001."},{"event":"Calpine bankruptcy and auction","date":"2005-2007","detail":"Calpine filed for bankruptcy in 2005, suspended construction, and the partially completed facility was auctioned in 2007; FirstEnergy won the auction after outbidding AMP."},{"event":"FirstEnergy acquisition","date":"2008-01","detail":"FirstEnergy acquired the partially completed plant from Calpine in its bankruptcy proceeding for approximately $253.6 million and resumed construction."},{"event":"Commissioning preparation","date":"2010","detail":"FirstEnergy contracted PIC for commissioning activities; gas blows and steam blows were performed in October 2010."},{"event":"AMP negotiations and definitive agreement","date":"2011-02-09","detail":"AMP and FirstEnergy announced a non-binding memorandum of understanding in February 2011, followed by a definitive asset-purchase agreement dated 2011-03-11."},{"event":"Construction completion","date":"2011-06","detail":"FirstEnergy completed construction in June 2011, with the facility mechanically complete and proceeding through commissioning."},{"event":"Acquisition and sale closing","date":"2011-07-28","detail":"AMP acquired Fremont Energy Center from FirstEnergy Generation Corporation; the transaction closed for $510 million, or more than $500 million in contemporaneous public announcements."},{"event":"Full commercial operation","date":"2012-01-20","detail":"AMP declared the facility to be in full commercial operation after commissioning and testing."},{"event":"Permanent project financing","date":"2012","detail":"AMP issued two series of Fremont Energy Center Project Revenue Bonds totaling $546.085 million to provide permanent financing for its 90.69% interest; the bonds included taxable and tax-exempt obligations."},{"event":"Tax-exempt bond refunding","date":"2018-12-20","detail":"AMP issued bonds to refund all callable tax-exempt Fremont Energy Center bonds issued in 2012."},{"event":"Series 2021A refunding","date":"2021","detail":"AMP issued $269.52 million of Series 2021A Fremont Energy Center Project Revenue Bonds to partially refund Series 2012B bonds."}] — AMP-2024-Financial-Statements-with-... · confidence: medium
- Timeline: [{"event":"Project development and groundbreaking","date":"2001","detail":"CME Energy and Calpine developed the project, which broke ground in 2001."},{"event":"Calpine bankruptcy and auction","date":"2005-2007","detail":"Calpine filed for bankruptcy in 2005, suspended construction, and the partially completed facility was auctioned in 2007; FirstEnergy won the auction after outbidding AMP."},{"event":"FirstEnergy acquisition","date":"2008-01","detail":"FirstEnergy acquired the partially completed plant from Calpine in its bankruptcy proceeding for approximately $253.6 million and resumed construction."},{"event":"Commissioning preparation","date":"2010","detail":"FirstEnergy contracted PIC for commissioning activities; gas blows and steam blows were performed in October 2010."},{"event":"AMP negotiations and definitive agreement","date":"2011-02-09","detail":"AMP and FirstEnergy announced a non-binding memorandum of understanding in February 2011, followed by a definitive asset-purchase agreement dated 2011-03-11."},{"event":"Construction completion","date":"2011-06","detail":"FirstEnergy completed construction in June 2011, with the facility mechanically complete and proceeding through commissioning."},{"event":"Acquisition and sale closing","date":"2011-07-28","detail":"AMP acquired Fremont Energy Center from FirstEnergy Generation Corporation; the transaction closed for $510 million, or more than $500 million in contemporaneous public announcements."},{"event":"Full commercial operation","date":"2012-01-20","detail":"AMP declared the facility to be in full commercial operation after commissioning and testing."},{"event":"Permanent project financing","date":"2012","detail":"AMP issued two series of Fremont Energy Center Project Revenue Bonds totaling $546.085 million to provide permanent financing for its 90.69% interest; the bonds included taxable and tax-exempt obligations."},{"event":"Tax-exempt bond refunding","date":"2018-12-20","detail":"AMP issued bonds to refund all callable tax-exempt Fremont Energy Center bonds issued in 2012."},{"event":"Series 2021A refunding","date":"2021","detail":"AMP issued $269.52 million of Series 2021A Fremont Energy Center Project Revenue Bonds to partially refund Series 2012B bonds."}] — Source · confidence: medium
- Commercial parties: [{"relationship":"Majority owner and project sponsor","name":"American Municipal Power, Inc.","detail":"Owns 90.69% of the project on behalf of participating AMP members and operates the generating plant.","official_url":"https://www.amppartners.org/"},{"relationship":"Co-owner","name":"Michigan Public Power Agency","detail":"Owns a 5.16% undivided interest in the project and sells its share of output through power-sales contracts with participating municipalities.","official_url":"https://www.mpower.org/"},{"relationship":"Ownership interest held through AMP","name":"Central Virginia Electric Cooperative","detail":"AMP owns 4.15% on behalf of Central Virginia Electric Cooperative.","official_url":null},{"relationship":"Former owner and seller","name":"FirstEnergy Generation Corporation","detail":"FirstEnergy's generating subsidiary acquired the partially completed facility from Calpine in January 2008 and sold it to AMP on 2011-07-28.","official_url":"https://www.firstenergycorp.com/"},{"relationship":"Original developer and predecessor owner","name":"Calpine Corporation","detail":"Originally developed the Fremont project with CME Energy; the project was later auctioned during Calpine's bankruptcy proceedings.","official_url":"https://www.calpine.com/"},{"relationship":"Developer","name":"CME Energy","detail":"Developed the Fremont Energy Center with Calpine beginning in 2001.","official_url":"https://cme-energy.com/"},{"relationship":"Plant operations and maintenance provider","name":"NAES Corporation","detail":"Provided commissioning, startup, operations, maintenance, and plant-administration services for AMP Fremont.","official_url":"https://www.naes.com/"},{"relationship":"Combustion-turbine and steam-turbine OEM","name":"Siemens Westinghouse","detail":"Supplied the two 501RD combustion turbines and the steam-turbine equipment identified in the project description.","official_url":"https://www.siemens-energy.com/"},{"relationship":"Heat-recovery steam-generator supplier","name":"Nooter-Eriksen","detail":"Supplied the two heat-recovery steam generators identified in the project description.","official_url":null}] — AMP Fremont Energy Center | American Municipal Power · confidence: medium
- Commercial parties: [{"relationship":"Majority owner and project sponsor","name":"American Municipal Power, Inc.","detail":"Owns 90.69% of the project on behalf of participating AMP members and operates the generating plant.","official_url":"https://www.amppartners.org/"},{"relationship":"Co-owner","name":"Michigan Public Power Agency","detail":"Owns a 5.16% undivided interest in the project and sells its share of output through power-sales contracts with participating municipalities.","official_url":"https://www.mpower.org/"},{"relationship":"Ownership interest held through AMP","name":"Central Virginia Electric Cooperative","detail":"AMP owns 4.15% on behalf of Central Virginia Electric Cooperative.","official_url":null},{"relationship":"Former owner and seller","name":"FirstEnergy Generation Corporation","detail":"FirstEnergy's generating subsidiary acquired the partially completed facility from Calpine in January 2008 and sold it to AMP on 2011-07-28.","official_url":"https://www.firstenergycorp.com/"},{"relationship":"Original developer and predecessor owner","name":"Calpine Corporation","detail":"Originally developed the Fremont project with CME Energy; the project was later auctioned during Calpine's bankruptcy proceedings.","official_url":"https://www.calpine.com/"},{"relationship":"Developer","name":"CME Energy","detail":"Developed the Fremont Energy Center with Calpine beginning in 2001.","official_url":"https://cme-energy.com/"},{"relationship":"Plant operations and maintenance provider","name":"NAES Corporation","detail":"Provided commissioning, startup, operations, maintenance, and plant-administration services for AMP Fremont.","official_url":"https://www.naes.com/"},{"relationship":"Combustion-turbine and steam-turbine OEM","name":"Siemens Westinghouse","detail":"Supplied the two 501RD combustion turbines and the steam-turbine equipment identified in the project description.","official_url":"https://www.siemens-energy.com/"},{"relationship":"Heat-recovery steam-generator supplier","name":"Nooter-Eriksen","detail":"Supplied the two heat-recovery steam generators identified in the project description.","official_url":null}] — AMP Fremont Energy Center Project (AFEC) – Michigan Public Power Agency · confidence: medium
- Commercial parties: [{"relationship":"Majority owner and project sponsor","name":"American Municipal Power, Inc.","detail":"Owns 90.69% of the project on behalf of participating AMP members and operates the generating plant.","official_url":"https://www.amppartners.org/"},{"relationship":"Co-owner","name":"Michigan Public Power Agency","detail":"Owns a 5.16% undivided interest in the project and sells its share of output through power-sales contracts with participating municipalities.","official_url":"https://www.mpower.org/"},{"relationship":"Ownership interest held through AMP","name":"Central Virginia Electric Cooperative","detail":"AMP owns 4.15% on behalf of Central Virginia Electric Cooperative.","official_url":null},{"relationship":"Former owner and seller","name":"FirstEnergy Generation Corporation","detail":"FirstEnergy's generating subsidiary acquired the partially completed facility from Calpine in January 2008 and sold it to AMP on 2011-07-28.","official_url":"https://www.firstenergycorp.com/"},{"relationship":"Original developer and predecessor owner","name":"Calpine Corporation","detail":"Originally developed the Fremont project with CME Energy; the project was later auctioned during Calpine's bankruptcy proceedings.","official_url":"https://www.calpine.com/"},{"relationship":"Developer","name":"CME Energy","detail":"Developed the Fremont Energy Center with Calpine beginning in 2001.","official_url":"https://cme-energy.com/"},{"relationship":"Plant operations and maintenance provider","name":"NAES Corporation","detail":"Provided commissioning, startup, operations, maintenance, and plant-administration services for AMP Fremont.","official_url":"https://www.naes.com/"},{"relationship":"Combustion-turbine and steam-turbine OEM","name":"Siemens Westinghouse","detail":"Supplied the two 501RD combustion turbines and the steam-turbine equipment identified in the project description.","official_url":"https://www.siemens-energy.com/"},{"relationship":"Heat-recovery steam-generator supplier","name":"Nooter-Eriksen","detail":"Supplied the two heat-recovery steam generators identified in the project description.","official_url":null}] — FirstEnergy Completes Sale of Fremont Energy Center to AMP · confidence: medium
- Commercial parties: [{"relationship":"Majority owner and project sponsor","name":"American Municipal Power, Inc.","detail":"Owns 90.69% of the project on behalf of participating AMP members and operates the generating plant.","official_url":"https://www.amppartners.org/"},{"relationship":"Co-owner","name":"Michigan Public Power Agency","detail":"Owns a 5.16% undivided interest in the project and sells its share of output through power-sales contracts with participating municipalities.","official_url":"https://www.mpower.org/"},{"relationship":"Ownership interest held through AMP","name":"Central Virginia Electric Cooperative","detail":"AMP owns 4.15% on behalf of Central Virginia Electric Cooperative.","official_url":null},{"relationship":"Former owner and seller","name":"FirstEnergy Generation Corporation","detail":"FirstEnergy's generating subsidiary acquired the partially completed facility from Calpine in January 2008 and sold it to AMP on 2011-07-28.","official_url":"https://www.firstenergycorp.com/"},{"relationship":"Original developer and predecessor owner","name":"Calpine Corporation","detail":"Originally developed the Fremont project with CME Energy; the project was later auctioned during Calpine's bankruptcy proceedings.","official_url":"https://www.calpine.com/"},{"relationship":"Developer","name":"CME Energy","detail":"Developed the Fremont Energy Center with Calpine beginning in 2001.","official_url":"https://cme-energy.com/"},{"relationship":"Plant operations and maintenance provider","name":"NAES Corporation","detail":"Provided commissioning, startup, operations, maintenance, and plant-administration services for AMP Fremont.","official_url":"https://www.naes.com/"},{"relationship":"Combustion-turbine and steam-turbine OEM","name":"Siemens Westinghouse","detail":"Supplied the two 501RD combustion turbines and the steam-turbine equipment identified in the project description.","official_url":"https://www.siemens-energy.com/"},{"relationship":"Heat-recovery steam-generator supplier","name":"Nooter-Eriksen","detail":"Supplied the two heat-recovery steam generators identified in the project description.","official_url":null}] — Operational Projects · confidence: medium
- Commercial parties: [{"relationship":"Majority owner and project sponsor","name":"American Municipal Power, Inc.","detail":"Owns 90.69% of the project on behalf of participating AMP members and operates the generating plant.","official_url":"https://www.amppartners.org/"},{"relationship":"Co-owner","name":"Michigan Public Power Agency","detail":"Owns a 5.16% undivided interest in the project and sells its share of output through power-sales contracts with participating municipalities.","official_url":"https://www.mpower.org/"},{"relationship":"Ownership interest held through AMP","name":"Central Virginia Electric Cooperative","detail":"AMP owns 4.15% on behalf of Central Virginia Electric Cooperative.","official_url":null},{"relationship":"Former owner and seller","name":"FirstEnergy Generation Corporation","detail":"FirstEnergy's generating subsidiary acquired the partially completed facility from Calpine in January 2008 and sold it to AMP on 2011-07-28.","official_url":"https://www.firstenergycorp.com/"},{"relationship":"Original developer and predecessor owner","name":"Calpine Corporation","detail":"Originally developed the Fremont project with CME Energy; the project was later auctioned during Calpine's bankruptcy proceedings.","official_url":"https://www.calpine.com/"},{"relationship":"Developer","name":"CME Energy","detail":"Developed the Fremont Energy Center with Calpine beginning in 2001.","official_url":"https://cme-energy.com/"},{"relationship":"Plant operations and maintenance provider","name":"NAES Corporation","detail":"Provided commissioning, startup, operations, maintenance, and plant-administration services for AMP Fremont.","official_url":"https://www.naes.com/"},{"relationship":"Combustion-turbine and steam-turbine OEM","name":"Siemens Westinghouse","detail":"Supplied the two 501RD combustion turbines and the steam-turbine equipment identified in the project description.","official_url":"https://www.siemens-energy.com/"},{"relationship":"Heat-recovery steam-generator supplier","name":"Nooter-Eriksen","detail":"Supplied the two heat-recovery steam generators identified in the project description.","official_url":null}] — AMP – Fremont Energy Center - NAES · confidence: medium
- Timeline.1: {"event":"Calpine bankruptcy and auction","date":"2005-2007","detail":"Calpine filed for bankruptcy in 2005, suspended construction, and the partially completed facility was auctioned in 2007; FirstEnergy won the auction after outbidding AMP."} — AMP Signs MOU with FirstEnergy on Fremont Energy Center | American Municipal Power · confidence: medium
- Timeline.3: {"event":"Commissioning preparation","date":"2010","detail":"FirstEnergy contracted PIC for commissioning activities; gas blows and steam blows were performed in October 2010."} — Source · confidence: medium
- Timeline.4: {"event":"AMP negotiations and definitive agreement","date":"2011-02-09","detail":"AMP and FirstEnergy announced a non-binding memorandum of understanding in February 2011, followed by a definitive asset-purchase agreement dated 2011-03-11."} — AMP Signs MOU with FirstEnergy on Fremont Energy Center | American Municipal Power · confidence: medium
- Timeline.4: {"event":"AMP negotiations and definitive agreement","date":"2011-02-09","detail":"AMP and FirstEnergy announced a non-binding memorandum of understanding in February 2011, followed by a definitive asset-purchase agreement dated 2011-03-11."} — https://www.amppartners.org/docs/default-source/bonds/downloads/afec/amp-fremont-energy-center-project-refunding-series-2021a.pdf?sfvrsn=2 · confidence: medium
- Timeline.5: {"event":"Construction completion","date":"2011-06","detail":"FirstEnergy completed construction in June 2011, with the facility mechanically complete and proceeding through commissioning."} — Source · confidence: high
- Timeline.6: {"event":"Acquisition and sale closing","date":"2011-07-28","detail":"AMP acquired Fremont Energy Center from FirstEnergy Generation Corporation; the transaction closed for $510 million, or more than $500 million in contemporaneous public announcements."} — FirstEnergy Completes Sale of Fremont Energy Center to AMP · confidence: high
- Timeline.6: {"event":"Acquisition and sale closing","date":"2011-07-28","detail":"AMP acquired Fremont Energy Center from FirstEnergy Generation Corporation; the transaction closed for $510 million, or more than $500 million in contemporaneous public announcements."} — FE-12.31.2011-10K · confidence: high
- Timeline.7: {"event":"Full commercial operation","date":"2012-01-20","detail":"AMP declared the facility to be in full commercial operation after commissioning and testing."} — AMP Fremont Energy Center Project (AFEC) – Michigan Public Power Agency · confidence: high
- Timeline.8: {"event":"Permanent project financing","date":"2012","detail":"AMP issued two series of Fremont Energy Center Project Revenue Bonds totaling $546.085 million to provide permanent financing for its 90.69% interest; the bonds included taxable and tax-exempt obligations."} — Source · confidence: medium
- Timeline.8: {"event":"Permanent project financing","date":"2012","detail":"AMP issued two series of Fremont Energy Center Project Revenue Bonds totaling $546.085 million to provide permanent financing for its 90.69% interest; the bonds included taxable and tax-exempt obligations."} — AMP-2024-Financial-Statements-with-... · confidence: medium
- Timeline.9: {"event":"Tax-exempt bond refunding","date":"2018-12-20","detail":"AMP issued bonds to refund all callable tax-exempt Fremont Energy Center bonds issued in 2012."} — Source · confidence: medium
- Timeline.10: {"event":"Series 2021A refunding","date":"2021","detail":"AMP issued $269.52 million of Series 2021A Fremont Energy Center Project Revenue Bonds to partially refund Series 2012B bonds."} — https://www.amppartners.org/docs/default-source/bonds/downloads/afec/amp-fremont-energy-center-project-refunding-series-2021a.pdf?sfvrsn=2 · confidence: medium
- Commercial parties.0: {"relationship":"Majority owner and project sponsor","name":"American Municipal Power, Inc.","detail":"Owns 90.69% of the project on behalf of participating AMP members and operates the generating plant.","official_url":"https://www.amppartners.org/"} — AMP Fremont Energy Center | American Municipal Power · confidence: high
- Commercial parties.1: {"relationship":"Co-owner","name":"Michigan Public Power Agency","detail":"Owns a 5.16% undivided interest in the project and sells its share of output through power-sales contracts with participating municipalities.","official_url":"https://www.mpower.org/"} — AMP Fremont Energy Center Project (AFEC) – Michigan Public Power Agency · confidence: high
- Commercial parties.3: {"relationship":"Former owner and seller","name":"FirstEnergy Generation Corporation","detail":"FirstEnergy's generating subsidiary acquired the partially completed facility from Calpine in January 2008 and sold it to AMP on 2011-07-28.","official_url":"https://www.firstenergycorp.com/"} — FirstEnergy Completes Sale of Fremont Energy Center to AMP · confidence: high
- Commercial parties.4: {"relationship":"Original developer and predecessor owner","name":"Calpine Corporation","detail":"Originally developed the Fremont project with CME Energy; the project was later auctioned during Calpine's bankruptcy proceedings.","official_url":"https://www.calpine.com/"} — Operational Projects · confidence: high

## Timeline

- 2005-2007 — Calpine bankruptcy and auction
  Calpine filed for bankruptcy in 2005, suspended construction, and the partially completed facility was auctioned in 2007; FirstEnergy won the auction after outbidding AMP.
  Source: Source (https://www.ohiogasassoc.org/wp/wp-content/uploads/2012/10/Mike-Perry_AMP.pdf)
- 2008-01 — Acquisition closed
  FirstEnergy acquired the partially complete Fremont Energy Center from Calpine Corporation in January 2008 through Calpine's bankruptcy proceeding.
  Source: http://prnewswire.com/news-releases/firstenergy-completes-sale-of-fremont-energy-center-to-amp-126336573.html (https://www.prnewswire.com/news-releases/firstenergy-completes-sale-of-fremont-energy-center-to-amp-126336573.html)
- 2010 — Commissioning preparation
  FirstEnergy contracted PIC for commissioning activities; gas blows and steam blows were performed in October 2010.
  Source: Source (https://www.ohiogasassoc.org/wp/wp-content/uploads/2012/10/Mike-Perry_AMP.pdf)
- 2011-06 — Construction completion
  FirstEnergy completed construction in June 2011, with the facility mechanically complete and proceeding through commissioning.
  Source: Source (https://www.ohiogasassoc.org/wp/wp-content/uploads/2012/10/Mike-Perry_AMP.pdf)
- 2011-07-28 — Ownership transaction
  On July 28, 2011, FirstEnergy Generation Corp., a FirstEnergy subsidiary, completed the exact-asset sale of the Fremont Energy Center in Fremont, Ohio, to American Municipal Power, Inc. for more than $500 million.
  Source: FirstEnergy Completes Sale of Fremont Energy Center to AMP (https://www.prnewswire.com/news-releases/firstenergy-completes-sale-of-fremont-energy-center-to-amp-126336573.html)
- 2012-01-20 — Full commercial operation
  AMP declared the facility to be in full commercial operation after commissioning and testing.
  Source: Source (https://www.ohiogasassoc.org/wp/wp-content/uploads/2012/10/Mike-Perry_AMP.pdf)
- 2021 — Series 2021A refunding
  AMP issued $269.52 million of Series 2021A Fremont Energy Center Project Revenue Bonds to partially refund Series 2012B bonds.
  Source: https://www.amppartners.org/docs/default-source/bonds/downloads/afec/amp-fremont-energy-center-project-refunding-series-2021a.pdf?sfvrsn=2 (https://www.amppartners.org/wp-content/uploads/2025/04/AMP-Fremont-Energy-Center-Project-Refunding-Series-2021A.pdf)

## Sources

- [AMP Fremont Energy Center | American Municipal Power](https://www.amppartners.org/generation/fossil-fuels/fremont-energy-center/) — amppartners.org · tier other
- [MBR | Index](https://mbrweb.ferc.gov/SearchlkpEIA/Index?page=350) — mbrweb.ferc.gov · tier regulatory
- [https://www.amppartners.org/docs/default-source/bonds/downloads/afec/amp-fremont-energy-center-project-refunding-series-2021a.pdf?sfvrsn=2](https://www.amppartners.org/wp-content/uploads/2025/04/AMP-Fremont-Energy-Center-Project-Refunding-Series-2021A.pdf) — amppartners.org · tier other
- [AMP Fremont Energy Center Project (AFEC) – Michigan Public Power Agency](https://www.mpower.org/project/afec/) — mpower.org · tier other
- [AMP – Fremont Energy Center - NAES](https://www.naes.com/amp-fremont-energy-center/) — naes.com · tier other
- [Fremont Energy Center, Ohio – CME Energy](https://cme-energy.com/projects/fremont-energy-center-ohio/) — cme-energy.com · tier other
- [Source](https://downloads.regulations.gov/EPA-HQ-OAR-2011-0660-10798/attachment_45.pdf) — downloads.regulations.gov · tier regulatory
- [Aeroderivative, Industrial and Heavy-Duty Gas Turbines](https://www.siemens-energy.com/global/en/home/products-services/product-offerings/gas-turbines.html) — siemens-energy.com · tier other
- [Source](https://www.ohiogasassoc.org/wp/wp-content/uploads/2012/10/Mike-Perry_AMP.pdf) — ohiogasassoc.org · tier other
- [FE-12.31.2011-10K](https://www.sec.gov/Archives/edgar/data/73960/000103129612000012/fe-12312011x10k.htm) — sec.gov · tier regulatory
- [Source](https://www.auditor.state.oh.us/AuditSearch/Reports/2023/Village_of_Haskins_2022_2021_Wood_FINAL.pdf) — auditor.state.oh.us · tier other
- [American Municipal Power, Inc.](https://www.amppartners.org/wp-content/uploads/2025/05/AMP-2024-Financial-Statements-with-opinion.pdf) — amppartners.org · tier other
- [AMP Signs MOU with FirstEnergy on Fremont Energy Center | American Municipal Power](https://www.amppartners.org/news/newsroom/amp-signs-mou-with-firstenergy-on-fremont-energy-center/) — amppartners.org · tier other
- [FirstEnergy Completes Sale of Fremont Energy Center to AMP](https://www.prnewswire.com/news-releases/firstenergy-completes-sale-of-fremont-energy-center-to-amp-126336573.html) — prnewswire.com · tier other
- [Operational Projects](https://cme-energy.com/operational-projects/) — cme-energy.com · tier other
- [amp | 2024 annual report](https://www.amppartners.org/wp-content/uploads/2025/06/AMP-Annual-Report-2024_Digital_FINAL.pdf) — amppartners.org · tier other
- [Source](https://amppartners.org/generation/fossil-fuels/fremont-energy-center) — amppartners.org · tier other

## Data quality

- Capacity nomenclature varies by source: EIA plant records report 739.5 MW, while AMP describes the facility as nominally 700 MW with 512 MW unfired plus 163 MW of duct-firing; another project record describes the fired capacity as 675 MW. The cited project and financing materials document operation but do not disclose a retirement or repowering milestone.

---

Canonical page: https://askthegrid.com/assets/facilities/fremont-energy-center

Source: Ask the Grid — https://askthegrid.com/