# Galaxy Helios Campus

ERCOT data center · https://askthegrid.com/assets/facilities/galaxy-helios-campus

Galaxy Digital owns and operates the Galaxy Helios Campus, a 2,200-acre hyperscale AI/HPC and crypto-mining complex in Afton, Texas, served by AEP Texas. Phase I (126,000 sq ft, energized May 2022, AI/HPC retrofit complete) delivers 200 MW gross power and 133 MW critical IT load to CoreWeave; Phase II (899,124 sq ft, under construction) will add 260 MW critical IT load with data-hall deliveries expected mid-2027; Phase III (133 MW committed) and full campus capacity of 1.63 GW are approved and contracted.

## Identity and location

- Operating status: expanding
- Asset scope: campus
- Location: 984 County Road 112, Afton, Dickens County, TX
- Owner: Galaxy Digital (campus) — https://www.galaxy.com/data-centers
- Operator: Galaxy Digital (campus) — https://www.galaxy.com/data-centers
- Developer: Argo Blockchain (campus)

## Power and grid context

- Campus gross power: 200 MW · energized · phase · Phase I · as of 2026-07-06 — Phase I gross power delivered to the campus and CoreWeave.
- Critical it load: 133 MW · operating · phase · Phase I · as of 2026-07-06 — Phase I critical IT load delivered to CoreWeave and generating revenue.
- Critical it load: 260 MW · under_construction · phase · Phase II · as of 2026-07-06 — Critical IT capacity under greenfield construction for Phase II; data-hall deliveries were expected to begin in the first half of 2027.
- Contracted power: 526 MW · contracted · campus · Phases I-III · as of 2026-07-06 — CoreWeave committed critical IT load across Phases I through III under long-term leases.
- Campus gross power: 800 MW · contracted · campus · Phases I-III · as of 2026-07-06 — Full gross power currently approved and contracted at Helios across Phases I through III.
- Interconnection request: 830 MW · approved · campus · as of 2026-01-15 — Additional computing demand approved by ERCOT after completion of the Large Load Interconnection Study; Galaxy executed an AEP Texas service agreement for this additional capacity.
- Utility service: 1,630 MW · approved · campus · as of 2026-07-06 — Total campus power capacity reported as approximately 1.63 GW, representing total approved capacity after the additional 830 MW approval.
- ISO/RTO: ERCOT
- Balancing authority: ERCOT
- Electric utility: AEP Texas Inc.

## Development

- Site status: Operating and expanding: Phase I is complete and generating revenue from 133 MW of critical IT load; Phase II is under construction; additional approved and contracted capacity spans Phases I–III.
- Site area: 2,200 acres
- Gross floor area: 1,225,124 square feet
- Buildings: 4
- Construction: Galaxy Helios is a multi-phase conversion and expansion of Argo Blockchain’s former Bitcoin-mining facility into an AI/HPC data-center campus. The original facility began construction in July 2021, energized Phase 1 and commenced mining operations on May 5, 2022. Galaxy acquired the facility in December 2022. Galaxy’s AI retrofit delivered approximately 200 MW of gross power, including 133 MW of critical IT load, in 2026; Phase II greenfield construction is underway, with data-hall deliveries expected in the first half of 2027. Three additional Phase II buildings—Helios 2, 3, and 4—were reported as permitted in March 2026.

## Compute and operations

- Facility classes: hyperscale, ai_hpc, crypto_mining
- Workloads: AI training, AI inference, high-performance computing
- Announced tenants: CoreWeave
- Critical IT load: 133 MW
- Operating context: Galaxy is operating Helios as a revenue-generating, hyperscale AI/HPC campus. Phase I was delivered in 2026, providing approximately 200 MW of gross power and 133 MW of critical IT load to CoreWeave under a 15-year lease; additional phases are under construction. The site is being transitioned from its original bitcoin-mining use to AI/HPC hosting.

## Sources

- [http://ercot.com/about](http://ercot.com/about)
- [Galaxy Digital prices $3.507 billion in secured notes for Texas AI data center - Blockspace](https://blockspace.media/insight/galaxy-digital-prices-ai-data-center-notes/)
- [Fetched web page](https://cdn.prod.website-files.com/6192808c25837d3716982433/630699a6bbb316589c24b4f9_Argo%202022%20Interim%20Report.pdf)
- [Fetched web page](https://interchange.puc.texas.gov/Documents/59029_60_1572333.PDF)
- [Galaxy Completes ERCOT Interconnection Studies and Secures Approval for Additional 830 Megawatts at Helios Data Center Campus, Doubling Total Approved Power Capacity to over 1.6 Gigawatts | Thu, 01/15/2026 - 09:15](https://investor.galaxy.com/news-releases/news-release-details/galaxy-completes-ercot-interconnection-studies-and-secures)
- [Fetched web page](https://investor.galaxy.com/node/10936/pdf)
- [Fetched web page](https://investor.galaxy.com/node/6566/pdf)
- [Argo Data Center - Dickens, TX](https://morethanjustparks.com/data-center-tracker/argo-data-center-tx--0e23476a-b41d-4426-bb1a-695b86f2b613)
- [Fetched web page](https://records.tceq.texas.gov/cs/idcplg?IdcService=TCEQ_EXTERNAL_SEARCH_GET_FILE&dID=8718222&Rendition=Web)
- [Concrete Batch Plant Standard Permit Source Analysis & ...](https://records.tceq.texas.gov/cs/idcplg?IdcService=TCEQ_EXTERNAL_SEARCH_GET_FILE&dID=8918504&Rendition=Web&searchType=External)
- [Saber Power Helps Build Helios, Argo Blockchain’s Texas Bitcoin Mine - Saber Power](https://saberpower.com/saber-power-helps-build-helios-argo-blockchains-texas-bitcoin-mine%EF%BF%BC/)
- [Bitcoin mining firm Argo Blockchain sells Texas facility to ...](https://siliconangle.com/2022/12/28/bitcoin-mining-firm-argo-blockchain-sells-texas-facility-galaxy-digital-65m/)
- [The Helios Story: From Bitcoin Mine to Data Center | Texas Real Estate Research Center](https://trerc.tamu.edu/blog/the-helios-story-from-bitcoin-mine-to-data-center/)
- [Fetched web page](https://us-east-1.storage.xata.sh/m70jvtnq079a6arl1pl64h96b8143jbs)
- [Galaxy Helios Campus - Dickens, Texas - US Data Center Map 2026](https://usdatamap.com/facility/galaxy-helios-campus-tx-galaxy-1)
- [Blockchain Data Center | Prefabricated Steel Buildings](https://www.alliedbuildings.com/projects/blockchain-data-center/)
- [Agenda - Dickens County, Texas](https://www.co.dickens.tx.us/upload/page/1662/Agenda%20April%202025%20-%20file%20marked.pdf)
- [Galaxy Helios Data Center Campus · Compute Atlas](https://www.compute-atlas.com/facilities/galaxy-helios-dickens-county-tx)
- [Coreweave Helios - TX](https://www.datacenter.fyi/public-record/coreweave-helios-581fb155)
- [CoreWeave leases another 260MW capacity from Galaxy in Texas - DCD](https://www.datacenterdynamics.com/en/news/coreweave-leases-another-260mw-capacity-from-galaxy-in-texas/)
- [Galaxy Digital eyes second Texas data center site, buys land outside Waco - DCD](https://www.datacenterdynamics.com/en/news/galaxy-digital-eyes-second-texas-data-center-site-buys-land-outside-waco/)
- [Galaxy Digital pivots from crypto to AI - signs 200MW deal with CoreWeave - DCD](https://www.datacenterdynamics.com/en/news/galaxy-digital-pivots-from-crypto-to-ai-signs-200mw-deal-with-coreweave/)
- [Galaxy secures approval for more than 800MW at Helios campus in Texas - DCD](https://www.datacenterdynamics.com/en/news/galaxy-secures-approval-for-more-than-800mw-at-helios-campus-in-texas/)
- [Helios Data Center in Dickens | Galaxy Digital (800 MW)](https://www.datacentermap.com/usa/texas/dickens/helios-data-center/)
- [$3.5B Permits Filed for Galaxy Helios Data Center Phase 2](https://www.everythinglubbock.com/news/local-news/massive-3-5-billion-expansion-planned-at-ai-data-center-in-dickens-county/) — EverythingLubbock.com · 2026-03-18
- [Galaxy Data Center Infrastructure - AI and HPC Data Center | Galaxy](https://www.galaxy.com/data-centers)
- [The Surging U.S. Demand for Compute & Power | Galaxy | Galaxy](https://www.galaxy.com/insights/case-studies/surging-demand-for-compute-and-power)
- [AI Bitcoin Mining Powers AI Data Centers & Infrastructure Investment | Galaxy](https://www.galaxy.com/insights/research/bitcoin-mining-ai-revolution)
- [AI & HPC Data Center Infrastructure in West Texas | Galaxy](https://www.galaxy.com/newsroom/building-the-infrastructure-for-an-ai-powered-future)
- [Galaxy Announces Commitment with CoreWeave to Host Additional AI and HPC Infrastructure | Galaxy](https://www.galaxy.com/newsroom/galaxy-announces-commitment-with-coreweave)
- [Galaxy Closes $1.4B Project Financing to Accelerate Helios AI Datacenter Development | Galaxy](https://www.galaxy.com/newsroom/galaxy-closes-helios-project-financing)
- [Galaxy Completes Phase I of Its Helios Data Center Campus, Delivering 133 Megawatts of Critical IT Load to CoreWeave | Galaxy](https://www.galaxy.com/newsroom/galaxy-completes-phase-i-of-its-helios-data-center-campus)
- [Galaxy To Acquire Helios Bitcoin Mining Facility From Argo Blockchain | Galaxy](https://www.galaxy.com/newsroom/galaxy-to-acquire-helios-bitcoin-mining-facility-from-argo-blockchain)
- [Helios facility - Global Energy Monitor](https://www.gem.wiki/Helios_facility)
- [Galaxy Helios I LLC to spend $800 Million to occupy 147,457 ...](https://www.intelligence360.news/galaxy-helios-i-llc-to-spend-800-million-to-occupy-147457-square-feet-of-space-in-afton-texas/)
- [$3.5B Permits Filed for Galaxy Helios Data Center Phase 2](https://www.ktsm.com/news/state-news/massive-3-5-billion-expansion-planned-at-ai-data-center-in-dickens-county/)
- [West Texas Helios facility leased to Nvidia-backed CrowdWeave](https://www.lubbockonline.com/story/business/2025/04/04/west-texas-helios-facility-dickens-county-leased-to-nvidia-crowdweave-ai-data-center/82709947007/) — Lubbock Avalanche-Journal · 2025-04-04
- [Cryptocurrency miners line up to come to Texas, and rural ...](https://www.newsfromthestates.com/article/cryptocurrency-miners-line-come-texas-and-rural-counties-are-welcoming-them) — The Texas Tribune via News From The States · 2022-10-03
- [Galaxy Completes ERCOT Interconnection Studies and Secures Approval for Additional 830 Megawatts at Helios Data Center Campus, Doubling Total Approved Power Capacity to over 1.6 Gigawatts](https://www.prnewswire.com/news-releases/galaxy-completes-ercot-interconnection-studies-and-secures-approval-for-additional-830-megawatts-at-helios-data-center-campus-doubling-total-approved-power-capacity-to-over-1-6-gigawatts-302662509.html)
- [Fetched web page](https://www.sec.gov/Archives/edgar/data/1841675/000165495422016976/a9772k.htm)

## Data quality

- The exact site is supported by the Helios name, Dickens County location, and reporting that places later phases near the initial facility off County Road 112.
- Galaxy’s statements about jobs, community commitments, and quality-of-life benefits are operator or county-official claims rather than independently audited outcomes.
- The Texas Spur tax-abatement article has inconsistent date metadata concerning the July 28 commissioners session.
- The May 2026 tax-abatement article is paywalled in the retrieved copy, although its visible headline identifies Galaxy Helios II and Galaxy Helios III.
- No unsupported water-use, cooling, PUE, WUE, building-count, or equipment claims are included.
- Power values retain their reported, requested, contracted, energized, gross-campus, or critical-IT basis.

---