# Gateway Generating Station

CAISO Natural Gas Fired Combined Cycle · https://askthegrid.com/assets/facilities/gateway-generating-station

Gateway Generating Station is a natural gas-fired power facility with 619.7 MW of EIA-reported nameplate capacity in Contra Costa County, California, registered as EIA Plant ID 56476. Pacific Gas & Electric Co. is the registered plant entity or operator. Gateway was PG&E’s first new power plant in more than 20 years when it entered service, marking a significant return to new generation construction for the utility.

## Key facts

- Technology: Natural Gas Fired Combined Cycle
- Power capacity: 619.7 MW
- Commercial operation: 2012
- Operating status: operating

## Grid and market context

- ISO/RTO: CAISO
- Balancing authority: CAISO
- Transmission owner: Pacific Gas and Electric Company (PG&E)

## Source-backed facts

- Identifiers: [{"value":"56476","system":"EIA plant ID"},{"value":"B","system":"EIA generator ID"},{"value":"CC1","system":"EIA unit code"},{"value":"422","system":"CAISO participating resource ID"},{"value":"00-AFC-01","system":"California Energy Commission docket"},{"value":"GATEWAY GENERATING FACILITY (FKA CONTRA COSTA POWER PLANT PROJECT) — withdrawn","system":"CAISO generation queue project"}] — PowerPlantsAllGE100MW · confidence: medium
- Identifiers: [{"value":"56476","system":"EIA plant ID"},{"value":"B","system":"EIA generator ID"},{"value":"CC1","system":"EIA unit code"},{"value":"422","system":"CAISO participating resource ID"},{"value":"00-AFC-01","system":"California Energy Commission docket"},{"value":"GATEWAY GENERATING FACILITY (FKA CONTRA COSTA POWER PLANT PROJECT) — withdrawn","system":"CAISO generation queue project"}] — Source · confidence: medium
- Identifiers: [{"value":"56476","system":"EIA plant ID"},{"value":"B","system":"EIA generator ID"},{"value":"CC1","system":"EIA unit code"},{"value":"422","system":"CAISO participating resource ID"},{"value":"00-AFC-01","system":"California Energy Commission docket"},{"value":"GATEWAY GENERATING FACILITY (FKA CONTRA COSTA POWER PLANT PROJECT) — withdrawn","system":"CAISO generation queue project"}] — Resource category and phase · confidence: medium
- Identifiers: [{"value":"56476","system":"EIA plant ID"},{"value":"B","system":"EIA generator ID"},{"value":"CC1","system":"EIA unit code"},{"value":"422","system":"CAISO participating resource ID"},{"value":"00-AFC-01","system":"California Energy Commission docket"},{"value":"GATEWAY GENERATING FACILITY (FKA CONTRA COSTA POWER PLANT PROJECT) — withdrawn","system":"CAISO generation queue project"}] — Gateway Generating Station | California Energy Commission · confidence: medium
- Identifiers: [{"value":"56476","system":"EIA plant ID"},{"value":"B","system":"EIA generator ID"},{"value":"CC1","system":"EIA unit code"},{"value":"422","system":"CAISO participating resource ID"},{"value":"00-AFC-01","system":"California Energy Commission docket"},{"value":"GATEWAY GENERATING FACILITY (FKA CONTRA COSTA POWER PLANT PROJECT) — withdrawn","system":"CAISO generation queue project"}] — Public Queue Report · confidence: medium
- Official project url: https://www.energy.ca.gov/powerplant/combined-cycle/gateway-generating-station — Gateway Generating Station | California Energy Commission · confidence: high
- Description: Gateway Generating Station is an operational natural-gas-fired combined-cycle facility north of Antioch in Contra Costa County, California. The EIA plant record lists 619.7 MW, while the California Energy Commission describes the facility as nominally 530 MW and consisting of two combustion turbine generators, two heat recovery steam generators, and a steam turbine generator. The station began commercial operation in January 2009, and PG&E reports it as one of its flexible combined-cycle natural-gas plants. — PowerPlantsAllGE100MW · confidence: medium
- Description: Gateway Generating Station is an operational natural-gas-fired combined-cycle facility north of Antioch in Contra Costa County, California. The EIA plant record lists 619.7 MW, while the California Energy Commission describes the facility as nominally 530 MW and consisting of two combustion turbine generators, two heat recovery steam generators, and a steam turbine generator. The station began commercial operation in January 2009, and PG&E reports it as one of its flexible combined-cycle natural-gas plants. — Gateway Generating Station | California Energy Commission · confidence: medium
- Description: Gateway Generating Station is an operational natural-gas-fired combined-cycle facility north of Antioch in Contra Costa County, California. The EIA plant record lists 619.7 MW, while the California Energy Commission describes the facility as nominally 530 MW and consisting of two combustion turbine generators, two heat recovery steam generators, and a steam turbine generator. The station began commercial operation in January 2009, and PG&E reports it as one of its flexible combined-cycle natural-gas plants. — Other Energy Sources | PG&E · confidence: medium
- Canonical name: Gateway Generating Station — Gateway Generating Station | California Energy Commission · confidence: high
- Identifiers.0: {"value":"56476","system":"EIA plant ID"} — PowerPlantsAllGE100MW · confidence: high
- Identifiers.1: {"value":"B","system":"EIA generator ID"} — Source · confidence: medium
- Identifiers.2: {"value":"CC1","system":"EIA unit code"} — Source · confidence: medium
- Identifiers.3: {"value":"422","system":"CAISO participating resource ID"} — Resource category and phase · confidence: medium
- Identifiers.4: {"value":"00-AFC-01","system":"California Energy Commission docket"} — Gateway Generating Station | California Energy Commission · confidence: high
- Identifiers.5: {"value":"GATEWAY GENERATING FACILITY (FKA CONTRA COSTA POWER PLANT PROJECT) — withdrawn","system":"CAISO generation queue project"} — Public Queue Report · confidence: medium
- Parties.2: {"relationship":"EPC contractor","name":"Black & Veatch","official_url":"https://www.bv.com/"} — Black & Veatch - Engineering, Procurement, Consulting... · confidence: medium
- Parties.3: {"relationship":"Turbine and electric-generator supplier","name":"GE Power","official_url":"https://www.gevernova.com/"} — GE Vernova | The Energy of Change · confidence: medium
- Commercial operation date: 2009-01-04 — Source · confidence: medium
- Construction scope: Operational natural-gas combined-cycle facility consisting of two combustion-turbine generators, two heat-recovery steam generators, and one steam-turbine generator. Additional installed scope includes two 195-foot HRSG exhaust stacks, a 10-cell water-cooling tower, storage tanks, a control building, electrical transformers and transmission interconnection facilities, backup diesel generators, and related utility and safety upgrades. Project sources identify Black & Veatch as EPC, GE Power as turbine and electric-generator supplier, two GE 7F.04 gas turbines rated at 203.2 MW each, one GE D11 steam turbine rated at 213.3 MW, Vogt-NEM steam boilers/HRSGs, and an SPX air-cooled condenser; the SPX condenser model and count are not stated. — Gateway Generating Station | California Energy Commission · confidence: medium
- Construction scope: Operational natural-gas combined-cycle facility consisting of two combustion-turbine generators, two heat-recovery steam generators, and one steam-turbine generator. Additional installed scope includes two 195-foot HRSG exhaust stacks, a 10-cell water-cooling tower, storage tanks, a control building, electrical transformers and transmission interconnection facilities, backup diesel generators, and related utility and safety upgrades. Project sources identify Black & Veatch as EPC, GE Power as turbine and electric-generator supplier, two GE 7F.04 gas turbines rated at 203.2 MW each, one GE D11 steam turbine rated at 213.3 MW, Vogt-NEM steam boilers/HRSGs, and an SPX air-cooled condenser; the SPX condenser model and count are not stated. — Power plant profile: Gateway Generating Station, US · confidence: medium
- Construction scope: Operational natural-gas combined-cycle facility consisting of two combustion-turbine generators, two heat-recovery steam generators, and one steam-turbine generator. Additional installed scope includes two 195-foot HRSG exhaust stacks, a 10-cell water-cooling tower, storage tanks, a control building, electrical transformers and transmission interconnection facilities, backup diesel generators, and related utility and safety upgrades. Project sources identify Black & Veatch as EPC, GE Power as turbine and electric-generator supplier, two GE 7F.04 gas turbines rated at 203.2 MW each, one GE D11 steam turbine rated at 213.3 MW, Vogt-NEM steam boilers/HRSGs, and an SPX air-cooled condenser; the SPX condenser model and count are not stated. — Gateway Generating Station – Overview and ACC... · confidence: medium
- Product url: https://www.gevernova.com/gas-power/products/gas-turbines/7f — 7F Heavy Duty Gas Turbine | 7F.04/7F.05 | GE Vernova · confidence: high
- Manufacturer domain: gevernova.com — 7F Heavy Duty Gas Turbine | 7F.04/7F.05 | GE Vernova · confidence: medium
- Description: Gateway Generating Station, formerly the Contra Costa Unit 8 Power Project, is an operational natural-gas-fired combined-cycle facility north of Antioch in Contra Costa County. The California Energy Commission describes a nominal 530-MW configuration with two combustion-turbine generators, two heat-recovery steam generators, and a steam turbine generator. Mirant Delta initiated the project, transferred the in-construction assets to PG&E under an Asset Transfer Agreement in June 2005, and PG&E became sole owner in November 2006. PG&E resumed construction in January 2007, and the station began commercial operation on January 4, 2009. — Gateway Generating Station | California Energy Commission · confidence: medium
- Quality notes: ["The EIA record reports 619.7 MW for plant ID 56476, while the California Energy Commission and project materials describe the facility as nominally 530 MW; these figures likely represent different capacity conventions.","The reported $386 million amount is identified as construction cost, not as acquisition consideration or project-financing proceeds.","The CEC and project materials support January 4, 2009 as the commercial-operation date; a contemporaneous local article refers to commercial operation on January 5, 2009.","CEC records show post-operation equipment and facility modifications, but the retrieved record does not identify a capacity expansion, retirement, or repowering decision through the latest 2025 compliance filing docketed in 2026."] — Source · confidence: medium
- Quality notes: ["The EIA record reports 619.7 MW for plant ID 56476, while the California Energy Commission and project materials describe the facility as nominally 530 MW; these figures likely represent different capacity conventions.","The reported $386 million amount is identified as construction cost, not as acquisition consideration or project-financing proceeds.","The CEC and project materials support January 4, 2009 as the commercial-operation date; a contemporaneous local article refers to commercial operation on January 5, 2009.","CEC records show post-operation equipment and facility modifications, but the retrieved record does not identify a capacity expansion, retirement, or repowering decision through the latest 2025 compliance filing docketed in 2026."] — Gateway Generating Station | California Energy Commission · confidence: medium
- Quality notes: ["The EIA record reports 619.7 MW for plant ID 56476, while the California Energy Commission and project materials describe the facility as nominally 530 MW; these figures likely represent different capacity conventions.","The reported $386 million amount is identified as construction cost, not as acquisition consideration or project-financing proceeds.","The CEC and project materials support January 4, 2009 as the commercial-operation date; a contemporaneous local article refers to commercial operation on January 5, 2009.","CEC records show post-operation equipment and facility modifications, but the retrieved record does not identify a capacity expansion, retirement, or repowering decision through the latest 2025 compliance filing docketed in 2026."] — New plant brings power to the people | Business Profiles | thepress.net · confidence: medium
- Quality notes: ["The EIA record reports 619.7 MW for plant ID 56476, while the California Energy Commission and project materials describe the facility as nominally 530 MW; these figures likely represent different capacity conventions.","The reported $386 million amount is identified as construction cost, not as acquisition consideration or project-financing proceeds.","The CEC and project materials support January 4, 2009 as the commercial-operation date; a contemporaneous local article refers to commercial operation on January 5, 2009.","CEC records show post-operation equipment and facility modifications, but the retrieved record does not identify a capacity expansion, retirement, or repowering decision through the latest 2025 compliance filing docketed in 2026."] — California Energy Commission : Docket Log · confidence: medium
- Financing summary: The Gateway plant’s reported construction cost was $386 million. Mirant Delta and PG&E executed an Asset Transfer Agreement on June 10, 2005, with PG&E’s acquisition closing on November 28, 2006; the cited regulatory records do not disclose separate sale consideration, a project-finance loan, bond financing, or other financing amount, so the $386 million figure should not be treated as transaction value or project financing. — New plant brings power to the people | Business Profiles | thepress.net · confidence: medium
- Financing summary: The Gateway plant’s reported construction cost was $386 million. Mirant Delta and PG&E executed an Asset Transfer Agreement on June 10, 2005, with PG&E’s acquisition closing on November 28, 2006; the cited regulatory records do not disclose separate sale consideration, a project-finance loan, bond financing, or other financing amount, so the $386 million figure should not be treated as transaction value or project financing. — Mirant California, LLC · confidence: medium
- Financing summary: The Gateway plant’s reported construction cost was $386 million. Mirant Delta and PG&E executed an Asset Transfer Agreement on June 10, 2005, with PG&E’s acquisition closing on November 28, 2006; the cited regulatory records do not disclose separate sale consideration, a project-finance loan, bond financing, or other financing amount, so the $386 million figure should not be treated as transaction value or project financing. — Suite 600 Sacramento, CA 95814 · confidence: medium
- Commercial parties.2: {"relationship":"EPC contractor","name":"Black & Veatch","detail":"The project overview identifies Black & Veatch as the engineering, procurement, and construction contractor.","official_url":"https://www.bv.com/"} — Source · confidence: high
- Commercial parties.2: {"relationship":"EPC contractor","name":"Black & Veatch","detail":"The project overview identifies Black & Veatch as the engineering, procurement, and construction contractor.","official_url":"https://www.bv.com/"} — Source · confidence: high
- Commercial parties.3: {"relationship":"Combustion-turbine and generator supplier","name":"GE Power","detail":"The project overview identifies GE 7FA.03 combustion turbines; GE Vernova is the current official corporate web presence for GE’s gas-power business.","official_url":"https://www.gevernova.com/"} — Source · confidence: medium
- Commercial parties.3: {"relationship":"Combustion-turbine and generator supplier","name":"GE Power","detail":"The project overview identifies GE 7FA.03 combustion turbines; GE Vernova is the current official corporate web presence for GE’s gas-power business.","official_url":"https://www.gevernova.com/"} — Power Plant Solutions · confidence: medium
- Commercial parties.4: {"relationship":"HRSG supplier","name":"Vogt Power International","detail":"The project overview identifies Vogt as one of the heat-recovery steam-generator suppliers.","official_url":"https://www.vogtpower.com/"} — Source · confidence: medium
- Commercial parties.4: {"relationship":"HRSG supplier","name":"Vogt Power International","detail":"The project overview identifies Vogt as one of the heat-recovery steam-generator suppliers.","official_url":"https://www.vogtpower.com/"} — Vogt Power International | Heat Recovery Steam Generators · confidence: medium
- Commercial parties.5: {"relationship":"HRSG supplier","name":"NEM","detail":"The project overview identifies NEM as one of the heat-recovery steam-generator suppliers. — Source · confidence: medium
- Commercial parties.6: {"relationship":"Air-cooled condenser supplier","name":"SPX Cooling Technologies","detail":"The project overview identifies SPX as the air-cooled-condenser supplier.","official_url":"https://spxcooling.com/"} — Source · confidence: high
- Commercial parties.6: {"relationship":"Air-cooled condenser supplier","name":"SPX Cooling Technologies","detail":"The project overview identifies SPX as the air-cooled-condenser supplier.","official_url":"https://spxcooling.com/"} — Cooling Towers and Cooling Tower Parts - SPX Cooling Tech · confidence: high
- Commercial parties.7: {"relationship":"Turbine-inlet-chilling supplier","name":"TAS","detail":"The project overview identifies TAS as the inlet-cooling or turbine-inlet-chilling system supplier and describes TAS equipment sale, modular construction, commissioning, start-up, training, and technical direction for the PG&E project.","official_url":"https://tas.com/"} — Source · confidence: medium
- Commercial parties.7: {"relationship":"Turbine-inlet-chilling supplier","name":"TAS","detail":"The project overview identifies TAS as the inlet-cooling or turbine-inlet-chilling system supplier and describes TAS equipment sale, modular construction, commissioning, start-up, training, and technical direction for the PG&E project.","official_url":"https://tas.com/"} — Source · confidence: medium
- Commercial parties.7: {"relationship":"Turbine-inlet-chilling supplier","name":"TAS","detail":"The project overview identifies TAS as the inlet-cooling or turbine-inlet-chilling system supplier and describes TAS equipment sale, modular construction, commissioning, start-up, training, and technical direction for the PG&E project.","official_url":"https://tas.com/"} — Turbine Inlet Chilling | TAS · confidence: medium
- Quality notes.0: The EIA record reports 619.7 MW for plant ID 56476, while the California Energy Commission and project materials describe the facility as nominally 530 MW; these figures likely represent different capacity conventions. — Source · confidence: high
- Quality notes.0: The EIA record reports 619.7 MW for plant ID 56476, while the California Energy Commission and project materials describe the facility as nominally 530 MW; these figures likely represent different capacity conventions. — Gateway Generating Station | California Energy Commission · confidence: high
- Quality notes.1: The reported $386 million amount is identified as construction cost, not as acquisition consideration or project-financing proceeds. — New plant brings power to the people | Business Profiles | thepress.net · confidence: medium
- Quality notes.1: The reported $386 million amount is identified as construction cost, not as acquisition consideration or project-financing proceeds. — Suite 600 Sacramento, CA 95814 · confidence: medium
- Quality notes.2: The CEC and project materials support January 4, 2009 as the commercial-operation date; a contemporaneous local article refers to commercial operation on January 5, 2009. — Gateway Generating Station | California Energy Commission · confidence: medium
- Quality notes.2: The CEC and project materials support January 4, 2009 as the commercial-operation date; a contemporaneous local article refers to commercial operation on January 5, 2009. — New plant brings power to the people | Business Profiles | thepress.net · confidence: medium
- Quality notes.3: CEC records show post-operation equipment and facility modifications, but the retrieved record does not identify a capacity expansion, retirement, or repowering decision through the latest 2025 compliance filing docketed in 2026. — Gateway Generating Station | California Energy Commission · confidence: medium
- Quality notes.3: CEC records show post-operation equipment and facility modifications, but the retrieved record does not identify a capacity expansion, retirement, or repowering decision through the latest 2025 compliance filing docketed in 2026. — California Energy Commission : Docket Log · confidence: medium
- Timeline.1: {"event":"Certification and initial construction","date":"2001","detail":"The CEC certified the project on May 30, 2001; Mirant began construction activities in late 2001."} — Gateway Generating Station | California Energy Commission · confidence: high
- Timeline.3: {"event":"Asset Transfer Agreement executed","date":"2005-06-10","detail":"Mirant and PG&E completed an Asset Transfer Agreement to transfer and assign the Contra Costa Unit 8 assets to PG&E."} — Mirant California, LLC · confidence: high
- Timeline.5: {"event":"Acquisition closed; PG&E became sole owner","date":"2006-11-28","detail":"Mirant and PG&E closed under the Asset Transfer Agreement, and PG&E became the sole owner of the project assets."} — Suite 600 Sacramento, CA 95814 · confidence: high

## Timeline

- 2000-01-31 — Application for certification filed
  Mirant Delta, LLC filed an Application for Certification with the California Energy Commission for the 530-MW Contra Costa Power Plant Unit 8 project.
  Source: Source (https://acc-usersgroup.org/wp-content/uploads/2011/11/BStanley-Gateway-Station.pdf)
- 2006-07-27 — PG&E added as co-owner and operator
  The CEC approved adding Pacific Gas and Electric Company as co-owner and operator with Mirant Delta, LLC.
  Source: Gateway Generating Station | California Energy Commission (https://www.energy.ca.gov/powerplant/combined-cycle/gateway-generating-station)
- 2006-11-28 — Acquisition closed; PG&E became sole owner
  Mirant and PG&E closed under the Asset Transfer Agreement, and PG&E became the sole owner of the project assets.
  Source: Source (https://acc-usersgroup.org/wp-content/uploads/2011/11/BStanley-Gateway-Station.pdf)
- 2007-01-23 — Project renamed Gateway Generating Station
  The CEC approved the order removing Mirant Delta as co-owner, confirming PG&E as sole owner, and changing the project name from Contra Costa Power Plant Unit 8 to Gateway Generating Station.
  Source: Gateway Generating Station | California Energy Commission (https://www.energy.ca.gov/powerplant/combined-cycle/gateway-generating-station)
- 2007-08-06 — Cooling-system design amended
  The CEC approved replacing the proposed San Joaquin River water cooling source and wet cooling tower with an air-cooled condenser and wet surface air cooler, along with related design changes.
  Source: Gateway Generating Station | California Energy Commission (https://www.energy.ca.gov/powerplant/combined-cycle/gateway-generating-station)
- 2008-01-09 — Additional water tanks approved
  The CEC approved two additional water tanks for the facility.
  Source: Gateway Generating Station | California Energy Commission (https://www.energy.ca.gov/powerplant/combined-cycle/gateway-generating-station)
- 2009 — Post-operation equipment and air-quality modifications
  The CEC approved equipment and air-quality condition modifications in 2009, with additional air-quality-condition changes approved in 2011.
  Source: Gateway Generating Station | California Energy Commission (https://www.energy.ca.gov/powerplant/combined-cycle/gateway-generating-station)
- 2009-01-04 — Commercial operation
  Gateway commenced commercial operation.
  Source: Source (https://acc-usersgroup.org/wp-content/uploads/2011/11/BStanley-Gateway-Station.pdf)
- 2012 — Facility modifications after commercial operation
  The CEC approved a 40,000-gallon water-storage tank in 2012, additional steam-turbine-deck decking in 2014, a fixed hydrogen tube bank in 2015, and a storm-water treatment system in 2016; these records do not identify a generation-capacity expansion.
  Source: Gateway Generating Station | California Energy Commission (https://www.energy.ca.gov/powerplant/combined-cycle/gateway-generating-station)
- 2026-03-24 — Latest cited operating/compliance record
  The CEC docket lists the Annual Compliance Report for RY 2025 for PG&E Gateway Generating Station; the retrieved CEC record continues to identify the facility as operational and contains no identified retirement or repowering decision.
  Source: California Energy Commission : Docket Log (https://efiling.energy.ca.gov/Lists/DocketLog.aspx?docketnumber=00-AFC-01C)

## Sources

- [Gateway Generating Station | California Energy Commission](https://www.energy.ca.gov/powerplant/combined-cycle/gateway-generating-station) — energy.ca.gov · tier regulatory
- [PowerPlantsAllGE100MW](https://www.eia.gov/trilateral/content/documents/PowerPlantsAllGE100MW_NorthAmerica_201708.xlsx) — eia.gov · tier regulatory
- [Source](https://mbrweb.ferc.gov/SearchlkpEIA/Index?page=664) — mbrweb.ferc.gov · tier regulatory
- [Resource category and phase](https://www.caiso.com/documents/resourcecategoryandphaseallparticipatingresourceids.xlsx) — caiso.com · tier other
- [Public Queue Report](https://www.caiso.com/documents/publicqueuereport.xlsx) — caiso.com · tier other
- [Power plant profile: Gateway Generating Station, US](https://www.power-technology.com/data-insights/power-plant-profile-gateway-generating-station-us/) — power-technology.com · tier other
- [Other Energy Sources | PG&E](https://www.pgecorp.com/sustainability/corporate-sustainability/corporate_sustainability_report_2025/planet/clean_energy/other_energy_sources.html) — pgecorp.com · tier other
- [Black & Veatch - Engineering, Procurement, Consulting ...](https://www.bv.com/) — bv.com · tier other
- [GE Vernova | The Energy of Change](https://www.gevernova.com/) — gevernova.com · tier other
- [Source](https://energy.ca.gov/powerplant/combined-cycle/gateway-generating-station) — energy.ca.gov · tier regulatory
- [Source](https://acc-usersgroup.org/wp-content/uploads/2011/11/BStanley-Gateway-Station.pdf) — acc-usersgroup.org · tier other
- [7F Heavy Duty Gas Turbine | 7F.04/7F.05 | GE Vernova](https://www.gevernova.com/gas-power/products/gas-turbines/7f) — gevernova.com · tier other
- [New plant brings power to the people | Business Profiles | thepress.net](https://www.thepress.net/features/business_profiles/new-plant-brings-power-to-the-people/article_459c7b66-63af-5315-b7da-2bd0512f5e9d.html) — thepress.net · tier other
- [California Energy Commission : Docket Log](https://efiling.energy.ca.gov/Lists/DocketLog.aspx?docketnumber=00-AFC-01C) — efiling.energy.ca.gov · tier regulatory
- [Mirant California, LLC](https://efiling.energy.ca.gov/GetDocument.aspx?tn=35142&DocumentContentId=49524) — efiling.energy.ca.gov · tier regulatory
- [Suite 600 Sacramento, CA 95814](https://efiling.energy.ca.gov/GetDocument.aspx?tn=38529&DocumentContentId=49527) — efiling.energy.ca.gov · tier regulatory
- [Source](https://bv.com/) — bv.com · tier other
- [Power Plant Solutions](https://www.gevernova.com/gas-power/products/power-plants) — gevernova.com · tier other
- [Vogt Power International | Heat Recovery Steam Generators](https://www.vogtpower.com/) — vogtpower.com · tier other
- [Cooling Towers and Cooling Tower Parts - SPX Cooling Tech](https://spxcooling.com/) — spxcooling.com · tier other
- [Source](https://www.turbineinletcooling.org/resources/papers/TAS_PG2008.pdf) — turbineinletcooling.org · tier other
- [Turbine Inlet Chilling | TAS](https://tas.com/turbine-inlet-chilling/) — tas.com · tier other
- [Announced Resource Retirement and Mothball List posted | California ISO](https://www.caiso.com/notices/announced-resource-retirement-and-mothball-list-posted-4) — caiso.com · tier other
- [Source](https://www.pge.com/content/dam/pge/docs/about/pge-systems/PGE-Climate-Strategy-Report.pdf) — pge.com · tier other

## Data quality

- The EIA record reports 619.7 MW for plant ID 56476, while the California Energy Commission and project materials describe the facility as nominally 530 MW; these figures likely represent different capacity conventions. The reported $386 million amount is identified as construction cost, not as acquisition consideration or project-financing proceeds. The CEC and project materials support January 4, 2009 as the commercial-operation date; a contemporaneous local article refers to commercial operation on January 5, 2009. CEC records show post-operation equipment and facility modifications, but the retrieved record does not identify a capacity expansion, retirement, or repowering decision through the latest 2025 compliance filing docketed in 2026.

---