# Glaciers Edge Wind Project

MISO asset profile · https://askthegrid.com/assets/facilities/glaciers-edge-wind-project

## Current generation inventory

EIA plant 62035 · Inventory reporting month: 2026-08.

- wind: 211.7 MW operating nameplate
- Capacity basis: operating_generator_nameplate_mw
- Source inventory: [EIA-860M workbook (preliminary)](https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx)
- Inventory retrieved: 2026-10-10T02:12:40.665346+00:00
- Filed coordinate (longitude, latitude): -95.772, 42.862
- OSM extract: 2026-10-08T20:21:06Z
- OSM mapped edit: 2024-03-25 04:13:53+00:00
- Map prepared: 2026-10-10T02:28:23.385301+00:00

Battery power (MW) and stored energy (MWh) are separate measures. Shared physical-site membership does not establish electrical connectivity, settlement or a common export limit.

## Reviewed overview

Glaciers Edge Wind Project is a 211.7 MW onshore wind turbine plant in Cherokee County. Glaciers Edge is a 200 MW wind farm in Cherokee County, northwest Iowa, near Marcus, developed by EDF Renewables. The project has 82 wind turbines and was expected online in December 2019. EDF Renewables agreed in November 2017 to supply Google with 200 MW of wind energy generated by the project.

## Reviewed metrics

- **Nameplate capacity:** 211.7 MW — Canonical EIA plant baseline.
- **Registry anchor:** Plant 62035 — plant-62035

## Facts

- **Technology:** Onshore Wind Turbine
- **Operator:** EDF Renewable Asset Holdings, Inc.

## Related parties

- **Offtaker:** Google — offtaker ([source](https://www.google.com))

## Sources

- [edf-re.com](https://www.edf-re.com/edf-renewable-energy-signs-agreement-google-supply-200-megawatts-wind-energy/) — edf-re.com · public_source — Source retained for exact-record publication review.

---

Canonical page: https://askthegrid.com/assets/facilities/glaciers-edge-wind-project

Source: Ask the Grid — https://askthegrid.com/