# Google Midlothian Data Center Building

ERCOT data center · https://askthegrid.com/assets/facilities/google-midlothian-data-center-building

Google operates the Midlothian Data Center Building in Texas as part of a 540-acre, five-building campus; Google invested in its first Texas data center at this location in 2019. Buildings 1–4 are completed or inspection-complete, while Building 5 is under construction as of January 2026. The facility reports 85.15 MW utility-service capacity and 51.09 MW critical IT load.

## Identity and location

- Operating status: operating
- Asset scope: building
- Location: TX
- Operator: Google (exact asset) — https://datacenters.google/locations/texas

## Power and grid context

- Utility service: 85.15 MW · operating · exact asset — Reported power capacity for the Google Midlothian facility at 3441 Railport Parkway; the source labels the facility operational, while a related public-record entry labels the project proposed.
- Critical it load: 51.09 MW · reported · exact asset — Reported IT load associated with the Google Midlothian facility; this is separate from the reported 85.15 MW power-capacity figure.
- ISO/RTO: ERCOT
- Balancing authority: ERCOT
- Electric utility: HILCO Electric Cooperative, Inc.

## Development

- Site status: Operating Google Midlothian campus with five identified buildings/phases; Buildings 1–4 are documented as completed, closed, or inspection-complete, while Building 5 is registered and under construction as of July 27, 2026.
- Site area: 540 acres
- Gross floor area: 1,288,600 square feet
- Buildings: 5
- Construction: Google's Midlothian campus comprises five identified buildings. Building 1 began construction in June 2019; Building 2 was fitted out in 2020; Building 3 was permitted for construction beginning July 2019 and has an inspection-complete record; Building 4 was scheduled for construction from April 2024 through December 2025; and Building 5 began construction on January 28, 2026, with a permit completion date of February 24, 2027. The campus therefore combines operating/completed facilities with Building 5 under construction. No commercial-operation dates were found for individual phases.

## Compute and operations

- Facility classes: hyperscale, cloud
- Operating context: Operating Google data-center building at the Google Midlothian campus. Public evidence identifies the facility and its operating company, but does not disclose building-specific compute configuration or operating details.

## Sources

- [http://bldup.com/projects/google-data-center-midlothian-campus](http://bldup.com/projects/google-data-center-midlothian-campus)
- [http://datacenterdynamics.com/en/news/google-files-for-fifth-data-center-at-midlothian-campus-in-texas](http://datacenterdynamics.com/en/news/google-files-for-fifth-data-center-at-midlothian-campus-in-texas)
- [http://datacenterdynamics.com/en/news/google-files-to-build-fourth-data-center-at-midlothian-campus-in-texas](http://datacenterdynamics.com/en/news/google-files-to-build-fourth-data-center-at-midlothian-campus-in-texas)
- [http://datacentermap.com/usa/texas/dallas/google-midlothian-bldg-2](http://datacentermap.com/usa/texas/dallas/google-midlothian-bldg-2)
- [http://quiddity.com/projects/google-data-center-quiddity](http://quiddity.com/projects/google-data-center-quiddity)
- [http://tdlr.texas.gov/TABS/Search/Print/TABS2024013301](http://tdlr.texas.gov/TABS/Search/Print/TABS2024013301)
- [Google: Midlothian 4 Data Center](https://baxtel.com/data-center/google-midlothian-4)
- [Sharka Data Center - Building 4 - Midlothian, TX | datacenter.fyi](https://datacenter.fyi/public-record/sharka-data-center-b329c5cf?ref=interconnection.fyi&utm_source=interconnection.fyi&utm_medium=referral)
- [Power usage effectiveness – Google Data Centers](https://datacenters.google/efficiency)
- [Texas – Google Data Center Location](https://datacenters.google/locations/texas)
- [Advancing responsible water use at our data centers](https://datacenters.google/water/)
- [Fetched web page](https://midlothian.tx.us/Archive.aspx?ADID=4776)
- [Jan 13, 2026 City Council - Midlothian, TX](https://midlothiantx.new.swagit.com/videos/372022)
- [Google Data Center - Quiddity | Midlothian, TX](https://quiddity.com/projects/google-data-center-quiddity/)
- [-](https://quiddity.com/wp-content/uploads/2020/05/39_Google-Data-Center.pdf)
- [Fetched web page](https://records.tceq.texas.gov/cs/idcplg?IdcService=TCEQ_EXTERNAL_SEARCH_GET_FILE&dID=9721223&Rendition=Web&searchType=External)
- [942 MW Google PPA for Data Center Solar - SB Energy](https://sbenergy.com/sb-energy-inks-942mw-ppa-with-google/)
- [Granbury Residents Take Action Against Seven City Officials ...](https://thetexan.news/texas-local-news/granbury-residents-take-action-against-seven-city-officials-over-data-center-concerns/article_88a74c53-d010-45fe-932a-5f697fc42529.html)
- [Google is behind the $500 million Midlothian data center ...](https://www.dallasnews.com/business/real-estate/2018/07/31/google-is-behind-the-500-million-midlothian-data-center-project-that-could-bring-40-jobs/)
- [Google Midlothian — Midlothian, TX | datacenter.fyi](https://www.datacenter.fyi/facility/google-midlothian-tx-3522f6b6)
- [Alamo Mission LLC (Google) - Midlothian, TX | datacenter.fyi](https://www.datacenter.fyi/public-record/alamo-mission-llc-google-c322c03d)
- [Google - Midlothian, TX | datacenter.fyi](https://www.datacenter.fyi/public-record/google-87bef61e)
- [Google files for fifth data center at Midlothian campus in Texas - DCD](https://www.datacenterdynamics.com/en/news/google-files-for-fifth-data-center-at-midlothian-campus-in-texas/) — Data Center Dynamics · 2026-03-03
- [Google files to build fourth data center at Midlothian campus in Texas - DCD](https://www.datacenterdynamics.com/en/news/google-files-to-build-fourth-data-center-at-midlothian-campus-in-texas/)
- [Google is behind $500m 'Sharka' data center in Midlothian, Texas - DCD](https://www.datacenterdynamics.com/en/news/google-is-behind-500m-sharka-data-center-in-midlothian-texas/) — Data Center Dynamics · 2018-08-01
- ['Sharka' plans $500m data center in Midlothian, Texas - DCD](https://www.datacenterdynamics.com/en/news/sharka-plans-500m-data-center-in-midlothian-texas/)
- [Google Midlothian - Bldg 2 Data Center in Dallas](https://www.datacentermap.com/usa/texas/dallas/google-midlothian-bldg-2/)
- [$64 billion of data center projects have been blocked or ...](https://www.datacenterwatch.org/report)
- [Google claims it's building data centers that barely use any ...](https://www.engadget.com/ai/google-claims-its-building-data-centers-that-barely-use-any-water-171411965.html)
- [Data centers in Texas: Google launches water fund, stewardship plan | FOX 7 Austin](https://www.fox7austin.com/news/texas-data-centers-google-water-fund-stewardship-plan)
- [Texas data center hot spots mapped by ERCOT data](https://www.houstonchronicle.com/business/energy/article/ercot-grid-data-centers-22286592.php)
- [Google reaped millions in tax breaks as it secretly expanded its real estate footprint across the U.S. - Los Angeles Times](https://www.latimes.com/business/la-fi-google-tax-breaks-20190219-story.html) — Los Angeles Times · 2019-02-19
- [Building Inspections Department | Midlothian, TX - Official Website](https://www.midlothian.tx.us/74/Building-Permits-Inspections)
- [Billion dollar Google datacenter project comes to North Texas – NBC 5 Dallas-Fort Worth](https://www.nbcdfw.com/news/politics/lone-star-politics/google-data-center-midlothian/3622572/) — NBC 5 Dallas-Fort Worth · 2024-08-15
- [ONCOR FAQS DETAILS](https://www.oncor.com/content/oncorwww/us/en/home/faqs/faqs-details.html)
- [Way: ‪Google‬ (‪844386861‬) | OpenStreetMap](https://www.openstreetmap.org/way/844386861)
- [TDLR TABS - Project Details](https://www.tdlr.texas.gov/TABS/Projects/TABS2019012848)
- [TDLR TABS - Project Details](https://www.tdlr.texas.gov/TABS/Projects/TABS2020008045)
- [Project Details](https://www.tdlr.texas.gov/TABS/Search/Print/TABS2019012848)
- [TDLR TABS - Project Details](https://www.tdlr.texas.gov/TABS/Search/Project/TABS2026007415)

## Data quality

- Most evidence concerns the Google Midlothian campus, the original Sharka project, or later campus phases; it does not unambiguously isolate OpenStreetMap way/844386861 from other buildings.
- The January 2026 hearing record identifies Sharka MDN Addition and the Railport Parkway/US 67 area, but the agenda item concerned signage and development regulations rather than a uniquely identified building.
- Statewide Google water-fund reporting and general Texas data-center opposition were not treated as exact-building evidence.
- The separate Google Red Oak project and unrelated Texas data-center petitions were excluded.
- No unsupported MW, water-use, PUE, WUE, tenant, equipment, or commercial-term claims are made.
- Power values retain their reported, requested, contracted, energized, gross-campus, or critical-IT basis.

---