Google’s Red Oak data-center campus is in Ellis County, Texas, separate from its Midlothian location. Google announced the Red Oak investment in 2023 and now reports campus-specific operating efficiency: quarterly power usage effectiveness was 1.14 in the second quarter of 2026. A Texas accessibility filing identifies the RED1A data-center project at 330 North Austin Boulevard, with Corgan as its designer. RED1A’s filed area and estimated cost describe that construction project, not the entire campus. Google has not provided a whole-campus electrical-demand figure in these sources.

## Identity and location

- Operating status: operating
- Asset scope: campus
- Location: 330 North Austin Boulevard, Red Oak, Ellis County, TX
- Operator: Google (exact asset) — https://www.datacenters.google/locations/texas/

## Development

- Site status: Google lists Red Oak as a Texas data-center location and publishes its quarterly operating-efficiency results.
- Construction: Google dates the Red Oak announcement to 2023. The RED1A accessibility registration describes a 170,594-square-foot ground-up data-center project with an estimated cost of US$176 million and Corgan as design firm. Those values apply to RED1A, not the whole campus.

## Compute and operations

- Facility classes: hyperscale, cloud
- Operating context: Red Oak and Midlothian are separate Google data-center locations in Ellis County. The Red Oak campus appears in Google's 2026 operating-efficiency tables; those ratios do not disclose total electrical demand or installed compute hardware.

## Sources

- [https://www.datacenters.google/efficiency/](https://www.datacenters.google/efficiency/)
- [https://www.datacenters.google/locations/texas/](https://www.datacenters.google/locations/texas/)
- [https://www.tdlr.texas.gov/TABS/Search/Print/TABS2025019071](https://www.tdlr.texas.gov/TABS/Search/Print/TABS2025019071)

## Data quality

- Power values retain their reported, requested, contracted, energized, gross-campus, or critical-IT basis.

---