# Greenidge Generation (Vulcan Infrastructure and Power) Dresden Facility

NYISO data center · https://askthegrid.com/assets/facilities/greenidge-generation-vulcan-infrastructure-and-power-dresden-facility

Vulcan Infrastructure and Power, formerly Greenidge Generation, runs a 104 MW natural gas power plant on Seneca Lake at 590 Plant Road in Dresden, New York, that sells capacity and energy into NYISO and powers 64 MW of behind-the-meter bitcoin mining data center capacity. The former coal plant returned to service on gas in 2017. A 60 MW load interconnection is approved, and NYSEG has proposed an interconnection agreement for an AI/HPC data center. A five-year state air permit signed in November 2025 requires a 44% emissions cut by 2030.

## Identity and location

- Operating status: operating
- Asset scope: facility
- Location: 590 Plant Rd, Dresden, NY
- Operator: Vulcan Infrastructure and Power (exact asset) — https://vulcanip.com

## Power and grid context

- Reported unspecified: 104 MW · reported · exact asset — Natural gas power plant selling capacity and energy into NYISO; basis unspecified.
- Reported unspecified: 64 MW · reported · exact asset — Existing behind-the-meter data center capacity used for bitcoin mining, planned to transition to AI/HPC; basis unspecified.
- Interconnection request: 60 MW · approved · exact asset · AI/HPC data center — Approved load interconnection for non-curtailable grid power; NYSEG sent a proposed interconnection agreement in 2026.
- Balancing authority: NYISO

## Compute and operations

- Facility classes: crypto_mining

## Sources

- [FRS Facility Detail Report | Envirofacts | US EPA](https://frs-public.epa.gov/ords/frs_public2/fii_query_dtl.disp_program_facility?p_registry_id=110000327619)
- [U.S. EPA Facility Registry Service location](https://frs-public.epa.gov/ords/frs_public2/frs_rest_services.get_facilities?registry_id=110000327619&output=JSON) — U.S. Environmental Protection Agency
- [Locations - VULCAN INFRASTRUCTURE AND POWER INC.](https://vulcanip.com/locations/)
- [https://vulcanip.com/wp-content/uploads/2026/05/GREE_Q1_2026_Earnings_Release_FINAL.pdf](https://vulcanip.com/wp-content/uploads/2026/05/GREE_Q1_2026_Earnings_Release_FINAL.pdf)
- [https://vulcanip.com/wp-content/uploads/2026/07/Introducing-Vulcan-Infrastructure-and-Power_7.20.26.pdf](https://vulcanip.com/wp-content/uploads/2026/07/Introducing-Vulcan-Infrastructure-and-Power_7.20.26.pdf)
- [https://vulcanip.com/wp-content/uploads/2026/08/VIP_Investor_Presentation_8_17_2026.pdf](https://vulcanip.com/wp-content/uploads/2026/08/VIP_Investor_Presentation_8_17_2026.pdf)

## Data quality

- Power values retain their reported, requested, contracted, energized, gross-campus, or critical-IT basis.
- Map point: EPA Facility Registry Service location for the permitted facility.

---