# H-E-B Data Center

ERCOT data center · https://askthegrid.com/assets/facilities/h-e-b-data-center

H-E-B operates a 35,845-square-foot on-premises data center at 15103 Huebner Road in San Antonio on an 11-acre site served by CPS Energy. Equipment upgrades with a $1.35 million valuation were permitted in May 2011; the facility remains in operation serving H-E-B corporate systems.

## Identity and location

- Operating status: operating
- Asset scope: facility
- Location: 15103 Huebner Road, San Antonio, Bexar County, TX
- Operator: H-E-B (exact asset) — https://www.heb.com

## Power and grid context

- ISO/RTO: ERCOT
- Balancing authority: ERCOT
- Electric utility: CPS Energy

## Development

- Site status: Operating on-premises H-E-B data center
- Site area: 11.01 acres
- Gross floor area: 35,845 square feet
- Construction: The exact H-E-B WH 200 site had a City of San Antonio permit granted in May 2011 for $1.35 million of equipment upgrades to the existing facility. H-E-B describes the facility as its on-premises data center, processing company databases, networks, and servers; no explicit ground-up construction start or completion date was found.

## Compute and operations

- Facility classes: enterprise
- Workloads: H-E-B corporate systems
- Operating context: H-E-B operates this as an on-premises data center supporting the company’s systems; H-E-B also uses cloud services, but no further site-specific operating details are publicly disclosed.

## Sources

- [http://loopnet.com/property/15103-huebner-rd-san-antonio-tx-78231/48029-178510040100](http://loopnet.com/property/15103-huebner-rd-san-antonio-tx-78231/48029-178510040100)
- [Fetched web page](http://www.tceq.texas.gov/assets/public/comm_exec/agendas/comm/backup/Agendas/2009/3-25-2009/1680eaq.pdf)
- [Inside H-E-B’s Data Center](https://careers.heb.com/blog/inside-h-e-b-s-data-center)
- [Weathering COVID traffic](https://careers.heb.com/blog/weathering-covid-traffic)
- [CPS approves H-E-B, Microsoft-backed green energy program](https://www.bizjournals.com/sanantonio/news/2020/07/28/heb-backed-solar-farms-could-soon-be-a-reality.html)
- [Southwest Design | San Antonio | Read Reviews + Get a Bid | BuildZoom](https://www.buildzoom.com/contractor/southwest-design-san-antonio-tx)
- [15103 Huebner Rd, San Antonio, TX 78231](https://www.compass.com/homedetails/15103-Huebner-Rd-San-Antonio-TX-78231/3YM5R_pid/)
- [Welcome to CPS Energy](https://www.cpsenergy.com/)
- [Energy Market Transformation](https://www.cpsenergy.com/content/dam/corporate/en/Documents/RAC/Energy%20Market%20Transformation%20-%20Final.pdf)
- [Building history in San Antonio](https://www.cpsenergy.com/en/about-us/who-we-are.html)
- [Large Load Customer Growth](https://www.cpsenergy.com/en/construction-and-renovation/large-load-customer-growth.html)
- [15103 HUEBNER RD, SAN ANTONIO, TX 78231](https://www.ebby.com/realestate/details/102962901/15103-huebner-road-san-antonio-tx-78231)
- [Electric Reliability Council of Texas](https://www.ercot.com/)
- [San Antonio data center boom could strain CPS Energy's ...](https://www.expressnews.com/business/article/san-antonio-data-center-boom-cps-energy-21943803.php)
- [15103 Huebner Rd, San Antonio, TX 78231 - APN/Parcel ID](https://www.loopnet.com/property/15103-huebner-rd-san-antonio-tx-78231/48029-178510040100/)
- [Fetched web page](https://www.sanantonio.gov/portals/0/files/dsd/pastgranted/2011/2011-05-28.pdf) — City of San Antonio Development Services Department · 2011-05-28
- [Fetched web page](https://www.tceq.texas.gov/assets/public/comm_exec/agendas/comm/backup/Agendas/2009/3-25-2009/1680eaq.pdf)
- [County OKs tax break for expansion of massive H-E-B San ...](https://www.tpr.org/economy-and-labor/2026-05-25/bexar-county-weighs-tax-breaks-for-h-e-bs-636-million-regional-hub)

## Data quality

- The exact site is identified as HEB WH200 at 15103 Huebner Road, San Antonio, with APN/Parcel ID 17851-004-0100.
- City of San Antonio permit 1704245 records equipment upgrades at 15103 Huebner Road with a listed valuation of $1,350,000; the permit record does not provide data-center technical specifications.
- The evidence does not support claims about MW capacity, water use, PUE, WUE, building count, tenants, equipment details, commercial terms, or dedicated power infrastructure.
- Downgraded provider news from exact-site scope because identity and location proof were incomplete: Inside H-E-B’s Data Center
- Power values retain their reported, requested, contracted, energized, gross-campus, or critical-IT basis.

---

Canonical page: https://askthegrid.com/assets/facilities/h-e-b-data-center
Profile generated: 2026-07-27T23:45:35.090107Z
Source: Ask the Grid — https://askthegrid.com/
