# Hamilton Innovation Center

PJM data center · https://askthegrid.com/assets/facilities/hamilton-innovation-center--grid-load-a074f552f726c7be

Hamilton Innovation Center is a proposed data center on about 29 acres at 1380 University Boulevard in Hamilton, Butler County, Ohio. The land is owned by the city and Logistix Property Group is the developer. The developer asked the city to pause a power feasibility study in January 2026 and the project was still reported paused in June 2026. Requests and targets have ranged from more than 100 MW to up to 240 MW. The city has said delivering 45 MW would take at least 24 months.

## Identity and location

- Operating status: paused
- Asset scope: facility
- Location: 1380 University Boulevard, Hamilton, Butler County, OH
- Developer: Logistix Property Group (exact asset)
- Owner: City of Hamilton (exact asset) — https://www.hamilton-oh.gov

## Power and grid context

- Interconnection request: 240 MW · requested · exact asset — Feasibility-study request for power supply to the site; not an approved service amount
- Campus gross power: Up to 240 MW · proposed · exact asset — Maximum instantaneous electricity requirement as proposed
- Reported unspecified: 200+ MW · target · exact asset — Developer target for facility power
- Reported unspecified: 100+ MW · proposed · exact asset — Architect-marketed design capacity
- Utility service: 45 MW · reported · exact asset — Preliminary utility finding: at least 24 months to deliver 45 MW
- ISO/RTO: PJM
- Electric utility: City of Hamilton electric system

## Development

- Site area: 29.196 acres

## Compute and operations

- Facility classes: hyperscale

## Sources

- [Butler County Commissioners approve short-term data center moratorium | WVXU, NPR Cincinnati](https://www.wvxu.org/environment/2026-06-17/butler-county-approves-data-center-moratorium)
- [Feasibility study for Hamilton data center paused as developer considers next steps | WVXU, NPR Cincinnati](https://www.wvxu.org/environment/2026-01-15/hamilton-data-center-paused-study)
- [$1B hyperscale data center could break ground in city of Hamilton in 2026](https://www.thebcfa.org/ignitebutler/featured-news-articles/p/item/64490/1b-hyperscale-data-center-could-break-ground-in-city-of-hamilton-in-2026)
- [Residents push back on data centers in Butler County | WVXU, NPR Cincinnati](https://www.wvxu.org/environment/2025-12-03/developers-data-center-butler-county)
- [Hamilton Innovation Center - Ware Malcomb](https://waremalcomb.com/projects/hamilton-innovation-center/)
- [www.hamilton-oh.gov](https://www.hamilton-oh.gov/s/Web-1380-University-Data-Center-Application-10022024.pdf)
- [https://gis.hamilton-oh.gov/arcgis/rest/services/Viewer/WebLayers_ParcelsAddresses/MapServer/1/query?where=PIN%3D%27P6461003000007%27&outFields=PIN&returnGeometry=true&outSR=4326&f=pjson](https://gis.hamilton-oh.gov/arcgis/rest/services/Viewer/WebLayers_ParcelsAddresses/MapServer/1/query?where=PIN%3D%27P6461003000007%27&outFields=PIN&returnGeometry=true&outSR=4326&f=pjson)
- [Hamilton residents voice concerns over proposed $100 million data center](https://www.wcpo.com/hamilton-ohio-data-center-city-council-meeting-october)

---

Canonical page: https://askthegrid.com/assets/facilities/hamilton-innovation-center--grid-load-a074f552f726c7be