# Hamilton Liberty

PJM Natural Gas Fired Combined Cycle · https://askthegrid.com/assets/facilities/hamilton-liberty

Hamilton Liberty is a natural gas-fired power facility with 870 MW of EIA-reported nameplate capacity in Bradford County, Pennsylvania, registered as EIA Plant ID 58420. BCPG Public Company Limited / BCPG USA Inc. is the current owner; Hamilton Liberty O&M LLC is the registered plant entity or operator. WSP describes Liberty as the first power plant developed in the Marcellus Shale gas field and says its Siemens single-shaft H-class technology was the first of its kind in the United States.
ASYLUM 23 KV LIBRTY10 (GEN1) and ASYLUM 23 KV LIBRTY20 (GEN2) · 230 kV · Pennsylvania Electric Co (Penelec).

## Key facts

- Technology: Natural Gas Fired Combined Cycle
- Power capacity: 870 MW
- Operating status: operating
- Retirement: 2026

## Grid and market context

- ISO/RTO: PJM
- Balancing authority: PJM Interconnection, LLC (PJM)

## Source-backed facts

- Official project url: https://www.gemmapower.com/our-work/combined-cycle/panda-liberty-power-project — Our Work - Panda Liberty Power Project · confidence: medium
- Parties.4: {"relationship":"Developer / project customer","name":"Panda Power Funds","official_url":null} — Our Work - Panda Liberty Power Project · confidence: medium
- Parties.4: {"relationship":"Developer / project customer","name":"Panda Power Funds","official_url":null} — Liberty Power Project, Pennsylvania, US · confidence: medium
- Parties.5: {"relationship":"Original project sponsor","name":"Moxie Energy, LLC","official_url":null} — Liberty Power Project, Pennsylvania, US · confidence: medium
- Parties.7: {"relationship":"EPC contractor","name":"Gemma Power Systems, LLC","official_url":"https://www.gemmapower.com"} — Our Work - Panda Liberty Power Project · confidence: medium
- Parties.8: {"relationship":"Design engineer","name":"POWER Engineers","official_url":"https://www.powereng.com"} — Our Work - Panda Liberty Power Project · confidence: high
- Parties.10: {"relationship":"Gas-turbine, steam-turbine, generator, and control-system OEM; long-term service provider","name":"Siemens Energy","official_url":"https://www.siemens-energy.com"} — Siemens Celebrates Commissioning of Panda Liberty Power Project in Pennsylvania | Mass Transit · confidence: high
- Parties.10: {"relationship":"Gas-turbine, steam-turbine, generator, and control-system OEM; long-term service provider","name":"Siemens Energy","official_url":"https://www.siemens-energy.com"} — Our Work - Panda Liberty Power Project · confidence: high
- Parties.11: {"relationship":"Heat-recovery steam-generator supplier","name":"Vogt Power International","official_url":null} — Our Work - Panda Liberty Power Project · confidence: medium
- Parties.16: {"relationship":"Debt financing provider","name":"Goldman Sachs","official_url":null} — Liberty Power Project, Pennsylvania, US · confidence: medium
- Parties.17: {"relationship":"Debt financing provider","name":"Credit Suisse","official_url":null} — Liberty Power Project, Pennsylvania, US · confidence: medium
- Parties.18: {"relationship":"Debt financing provider","name":"Ares Capital","official_url":null} — Liberty Power Project, Pennsylvania, US · confidence: medium
- Parties.19: {"relationship":"Financing documentation agent","name":"Union Bank","official_url":null} — Liberty Power Project, Pennsylvania, US · confidence: medium
- Parties.20: {"relationship":"Term-loan financing provider","name":"Siemens Financial Services","official_url":null} — Liberty Power Project, Pennsylvania, US · confidence: medium
- Construction scope: Natural-gas-fired combined-cycle facility comprising two single-shaft power trains. Installed equipment includes 2 Siemens SGT6-8000H gas turbines, 2 Siemens SST6-5000 steam turbines, 2 Siemens SGen6-2000H hydrogen-cooled generators, 2 Vogt Smart-Box heat-recovery steam generators, and air-cooled condensers. The physical build also included ancillary systems and buildings, electrical interconnection facilities, and natural-gas, water, and wastewater tie-ins. — Our Work - Panda Liberty Power Project · confidence: medium
- Construction scope: Natural-gas-fired combined-cycle facility comprising two single-shaft power trains. Installed equipment includes 2 Siemens SGT6-8000H gas turbines, 2 Siemens SST6-5000 steam turbines, 2 Siemens SGen6-2000H hydrogen-cooled generators, 2 Vogt Smart-Box heat-recovery steam generators, and air-cooled condensers. The physical build also included ancillary systems and buildings, electrical interconnection facilities, and natural-gas, water, and wastewater tie-ins. — SGT6-8000H Heavy-duty gas turbine (60 Hz) · confidence: medium
- Product url: https://www.siemens-energy.com/global/en/home/products-services/product/sgt6-8000h.html — SGT6-8000H Heavy-duty gas turbine (60 Hz) · confidence: high
- Kind: thermal — Our Work - Panda Liberty Power Project · confidence: high
- Manufacturer domain: https://www.siemens-energy.com — Our Work - Panda Liberty Power Project · confidence: medium
- Equipment models: [{"manufacturer_domain":"https://www.siemens-energy.com","product_url":"https://www.siemens-energy.com/global/en/home/products-services/product/sgt6-8000h.html","count":2,"unit_mw":null,"name":"SGT6-8000H gas turbine"},{"manufacturer_domain":"https://www.siemens-energy.com","product_url":"https://www.siemens-energy.com/global/en/home/products-services/product/utility-steam-turbines.html","count":2,"unit_mw":null,"name":"SST6-5000 steam turbine"},{"manufacturer_domain":"https://www.siemens-energy.com","product_url":"https://www.siemens-energy.com/global/en/home/products-services/product-offerings/generators.html","count":2,"unit_mw":null,"name":"SGen6-2000H hydrogen-cooled generator"},{"manufacturer_domain":"https://www.vogtpower.com","product_url":"https://www.vogtpower.com/hrsgs/","count":2,"unit_mw":null,"name":"Vogt Smart-Box heat-recovery steam generator"},{"manufacturer_domain":"https://www.siemens-energy.com","product_url":null,"count":1,"unit_mw":null,"name":"SPPA-T3000 instrumentation and control system"}] — SGT6-8000H Heavy-duty gas turbine (60 Hz) · confidence: medium
- Equipment models: [{"manufacturer_domain":"https://www.siemens-energy.com","product_url":"https://www.siemens-energy.com/global/en/home/products-services/product/sgt6-8000h.html","count":2,"unit_mw":null,"name":"SGT6-8000H gas turbine"},{"manufacturer_domain":"https://www.siemens-energy.com","product_url":"https://www.siemens-energy.com/global/en/home/products-services/product/utility-steam-turbines.html","count":2,"unit_mw":null,"name":"SST6-5000 steam turbine"},{"manufacturer_domain":"https://www.siemens-energy.com","product_url":"https://www.siemens-energy.com/global/en/home/products-services/product-offerings/generators.html","count":2,"unit_mw":null,"name":"SGen6-2000H hydrogen-cooled generator"},{"manufacturer_domain":"https://www.vogtpower.com","product_url":"https://www.vogtpower.com/hrsgs/","count":2,"unit_mw":null,"name":"Vogt Smart-Box heat-recovery steam generator"},{"manufacturer_domain":"https://www.siemens-energy.com","product_url":null,"count":1,"unit_mw":null,"name":"SPPA-T3000 instrumentation and control system"}] — Our Work - Panda Liberty Power Project · confidence: medium
- Product family: SCC6-8000H combined-cycle power plant package — SGT6-8000H Heavy-duty gas turbine (60 Hz) · confidence: high
- Manufacturer name: Siemens Energy — Our Work - Panda Liberty Power Project · confidence: medium
- Equipment models.0: {"manufacturer_domain":"https://www.siemens-energy.com","product_url":"https://www.siemens-energy.com/global/en/home/products-services/product/sgt6-8000h.html","count":2,"unit_mw":null,"name":"SGT6-8000H gas turbine"} — SGT6-8000H Heavy-duty gas turbine (60 Hz) · confidence: high
- Equipment models.1: {"manufacturer_domain":"https://www.siemens-energy.com","product_url":"https://www.siemens-energy.com/global/en/home/products-services/product/utility-steam-turbines.html","count":2,"unit_mw":null,"name":"SST6-5000 steam turbine"} — SGT6-8000H Heavy-duty gas turbine (60 Hz) · confidence: high
- Equipment models.2: {"manufacturer_domain":"https://www.siemens-energy.com","product_url":"https://www.siemens-energy.com/global/en/home/products-services/product-offerings/generators.html","count":2,"unit_mw":null,"name":"SGen6-2000H hydrogen-cooled generator"} — SGT6-8000H Heavy-duty gas turbine (60 Hz) · confidence: medium
- Equipment models.3: {"manufacturer_domain":"https://www.vogtpower.com","product_url":"https://www.vogtpower.com/hrsgs/","count":2,"unit_mw":null,"name":"Vogt Smart-Box heat-recovery steam generator"} — Our Work - Panda Liberty Power Project · confidence: medium
- Equipment models.3: {"manufacturer_domain":"https://www.vogtpower.com","product_url":"https://www.vogtpower.com/hrsgs/","count":2,"unit_mw":null,"name":"Vogt Smart-Box heat-recovery steam generator"} — SGT6-8000H Heavy-duty gas turbine (60 Hz) · confidence: medium
- Equipment models.4: {"manufacturer_domain":"https://www.siemens-energy.com","product_url":null,"count":1,"unit_mw":null,"name":"SPPA-T3000 instrumentation and control system"} — SGT6-8000H Heavy-duty gas turbine (60 Hz) · confidence: medium
- Financing summary: The original project financing included senior debt arranged by Goldman Sachs, Credit Suisse, and Ares Capital, with Union Bank as documentation agent. Siemens Financial Services provided a separate $50 million construction term loan for Liberty. S&P Global later reported an initial $585 million term-loan-B debt quantum for Panda Liberty. Separately, Carlyle and EIG used a $1.015 billion acquisition and recapitalization facility in June 2020 for the Liberty and Patriot portfolio; this was portfolio acquisition financing, not a Liberty-only sale price. BCPG's July 2023 purchase of a 25% interest in Hamilton Holdings II from Franklin Power Holdings was approximately $260 million, or more than THB 9,000 million, and represented equity acquisition consideration rather than project debt. Vistra's announced 2026 Cogentrix transaction has an approximately $4.0 billion net portfolio purchase price, including cash, stock, assumed debt, and expected tax benefits. — Siemens wins $400 million power plant order in U.S. · confidence: medium
- Financing summary: The original project financing included senior debt arranged by Goldman Sachs, Credit Suisse, and Ares Capital, with Union Bank as documentation agent. Siemens Financial Services provided a separate $50 million construction term loan for Liberty. S&P Global later reported an initial $585 million term-loan-B debt quantum for Panda Liberty. Separately, Carlyle and EIG used a $1.015 billion acquisition and recapitalization facility in June 2020 for the Liberty and Patriot portfolio; this was portfolio acquisition financing, not a Liberty-only sale price. BCPG's July 2023 purchase of a 25% interest in Hamilton Holdings II from Franklin Power Holdings was approximately $260 million, or more than THB 9,000 million, and represented equity acquisition consideration rather than project debt. Vistra's announced 2026 Cogentrix transaction has an approximately $4.0 billion net portfolio purchase price, including cash, stock, assumed debt, and expected tax benefits. — Siemens Celebrates Commissioning of Panda Liberty... · confidence: medium
- Financing summary: The original project financing included senior debt arranged by Goldman Sachs, Credit Suisse, and Ares Capital, with Union Bank as documentation agent. Siemens Financial Services provided a separate $50 million construction term loan for Liberty. S&P Global later reported an initial $585 million term-loan-B debt quantum for Panda Liberty. Separately, Carlyle and EIG used a $1.015 billion acquisition and recapitalization facility in June 2020 for the Liberty and Patriot portfolio; this was portfolio acquisition financing, not a Liberty-only sale price. BCPG's July 2023 purchase of a 25% interest in Hamilton Holdings II from Franklin Power Holdings was approximately $260 million, or more than THB 9,000 million, and represented equity acquisition consideration rather than project debt. Vistra's announced 2026 Cogentrix transaction has an approximately $4.0 billion net portfolio purchase price, including cash, stock, assumed debt, and expected tax benefits. — Research Update: Panda Liberty LLC Senior Secured · confidence: medium
- Financing summary: The original project financing included senior debt arranged by Goldman Sachs, Credit Suisse, and Ares Capital, with Union Bank as documentation agent. Siemens Financial Services provided a separate $50 million construction term loan for Liberty. S&P Global later reported an initial $585 million term-loan-B debt quantum for Panda Liberty. Separately, Carlyle and EIG used a $1.015 billion acquisition and recapitalization facility in June 2020 for the Liberty and Patriot portfolio; this was portfolio acquisition financing, not a Liberty-only sale price. BCPG's July 2023 purchase of a 25% interest in Hamilton Holdings II from Franklin Power Holdings was approximately $260 million, or more than THB 9,000 million, and represented equity acquisition consideration rather than project debt. Vistra's announced 2026 Cogentrix transaction has an approximately $4.0 billion net portfolio purchase price, including cash, stock, assumed debt, and expected tax benefits. — Milbank Named “Law Firm of the Year” by Power Finance Risk Awards · confidence: medium
- Financing summary: The original project financing included senior debt arranged by Goldman Sachs, Credit Suisse, and Ares Capital, with Union Bank as documentation agent. Siemens Financial Services provided a separate $50 million construction term loan for Liberty. S&P Global later reported an initial $585 million term-loan-B debt quantum for Panda Liberty. Separately, Carlyle and EIG used a $1.015 billion acquisition and recapitalization facility in June 2020 for the Liberty and Patriot portfolio; this was portfolio acquisition financing, not a Liberty-only sale price. BCPG's July 2023 purchase of a 25% interest in Hamilton Holdings II from Franklin Power Holdings was approximately $260 million, or more than THB 9,000 million, and represented equity acquisition consideration rather than project debt. Vistra's announced 2026 Cogentrix transaction has an approximately $4.0 billion net portfolio purchase price, including cash, stock, assumed debt, and expected tax benefits. — Vistra Adds to its Industry-Leading Generation Portfolio with Acquisition of Cogentrix - Jan 5, 2026 · confidence: medium
- Timeline.0: {"event":"Construction limited notice to proceed","date":"2013-04-01","detail":"Gemma Power Systems received limited notice to proceed for the Panda Liberty project."} — Source · confidence: high
- Timeline.1: {"event":"Construction full notice to proceed","date":"2013-08-21","detail":"Gemma received full notice to proceed for construction of the combined-cycle facility."} — Source · confidence: high
- Timeline.2: {"event":"Project acquisition by Panda Power Funds","date":"2013-08","detail":"Panda Power Funds acquired the Liberty project, which had originally been under development by Moxie Energy/Moxie Liberty."} — Panda Power’s Liberty Gas Plant Enters Production · confidence: medium
- Timeline.3: {"event":"Substantial construction completion","date":"2016-04","detail":"Gemma reported substantial completion of the Panda Liberty project."} — Source · confidence: high
- Timeline.6: {"event":"Official commissioning","date":"2016-10","detail":"Siemens and Panda Power Funds celebrated commissioning of the Panda Liberty Power Project."} — Siemens Celebrates Commissioning of Panda Liberty Power Project in Pennsylvania | Mass Transit · confidence: medium
- Timeline.7: {"event":"Hamilton acquisition from Panda","date":"2020-06","detail":"Hamilton Projects Acquiror, backed by Carlyle and EIG, acquired the Liberty and Patriot projects from Panda Power Funds; the related $1.015 billion acquisition facility closed in June 2020."} — Carlyle Power closes on Hamilton acquisition facility - Proximo · confidence: medium
- Timeline.7: {"event":"Hamilton acquisition from Panda","date":"2020-06","detail":"Hamilton Projects Acquiror, backed by Carlyle and EIG, acquired the Liberty and Patriot projects from Panda Power Funds; the related $1.015 billion acquisition facility closed in June 2020."} — Milbank Named “Law Firm of the Year” by Power Finance Risk Awards · confidence: medium
- Timeline.9: {"event":"EIG interest sold to Carlyle","date":"2021-06-09","detail":"EIG sold its 50% indirect interest in Hamilton Holdings II to The Carlyle Group, making Carlyle the 100% equity owner of the joint venture."} — EIG Global Energy Partners · confidence: high
- Quality notes.0: Capacity figures vary by reporting basis: historical project sources cite approximately 800-829 MW, while the current EIA-derived plant record for EIA plant 58420 lists 870 MW of nameplate capacity; this directory uses the plant-specific 870-MW figure. — Panda Liberty Power Project · confidence: medium
- Commercial parties.4: {"relationship":"Developer / project customer and 2020 seller","name":"Panda Power Funds","detail":"Customer for the Gemma EPC project and acquirer of the Liberty project in August 2013; sold the Liberty and Patriot portfolio to Hamilton Projects Acquiror in June 2020.","official_url":null} — Panda Power’s Liberty Gas Plant Enters Production · confidence: high
- Commercial parties.4: {"relationship":"Developer / project customer and 2020 seller","name":"Panda Power Funds","detail":"Customer for the Gemma EPC project and acquirer of the Liberty project in August 2013; sold the Liberty and Patriot portfolio to Hamilton Projects Acquiror in June 2020.","official_url":null} — Our Work - Panda Liberty Power Project · confidence: high
- Commercial parties.5: {"relationship":"Original project sponsor","name":"Moxie Energy, LLC","detail":"Original sponsor associated with development of the Liberty project before Panda Power Funds acquired it.","official_url":null} — Panda Power’s Liberty Gas Plant Enters Production · confidence: medium
- Commercial parties.7: {"relationship":"EPC contractor","name":"Gemma Power Systems, LLC","detail":"Constructed the plant, ancillary systems, buildings, electrical interconnection facilities, and utility tie-ins.","official_url":"https://www.gemmapower.com"} — Source · confidence: high
- Commercial parties.8: {"relationship":"Design engineer","name":"POWER Engineers","detail":"Provided design engineering for the Panda Liberty project.","official_url":"https://www.powereng.com"} — Our Work - Panda Liberty Power Project · confidence: high
- Commercial parties.9: {"relationship":"Engineering partner","name":"WSP","detail":"Provided balance-of-plant, field, and performance-testing engineering support and worked with Panda, Siemens, and Gemma.","official_url":"https://www.wsp.com"} — Panda Liberty Power Project · confidence: high
- Commercial parties.10: {"relationship":"Technology OEM and long-term service provider","name":"Siemens Energy","detail":"Supplied the Siemens H-class gas-turbine, steam-turbine, generator, and related power-generation technology and participated in long-term service; Siemens Financial Services also provided the construction term loan.","official_url":"https://www.siemens-energy.com"} — Our Work - Panda Liberty Power Project · confidence: high
- Commercial parties.10: {"relationship":"Technology OEM and long-term service provider","name":"Siemens Energy","detail":"Supplied the Siemens H-class gas-turbine, steam-turbine, generator, and related power-generation technology and participated in long-term service; Siemens Financial Services also provided the construction term loan.","official_url":"https://www.siemens-energy.com"} — Siemens Celebrates Commissioning of Panda Liberty Power Project in Pennsylvania | Mass Transit · confidence: high
- Commercial parties.13: {"relationship":"Initial Hamilton portfolio acquirer and later sole owner","name":"The Carlyle Group","detail":"Acquired the Hamilton portfolio from Panda with EIG in June 2020 and acquired EIG's 50% indirect interest on June 9, 2021, becoming sole equity owner of the Hamilton joint venture.","official_url":"https://www.carlyle.com"} — EIG Global Energy Partners · confidence: high
- Commercial parties.13: {"relationship":"Initial Hamilton portfolio acquirer and later sole owner","name":"The Carlyle Group","detail":"Acquired the Hamilton portfolio from Panda with EIG in June 2020 and acquired EIG's 50% indirect interest on June 9, 2021, becoming sole equity owner of the Hamilton joint venture.","official_url":"https://www.carlyle.com"} — Carlyle Power closes on Hamilton acquisition facility - Proximo · confidence: high
- Commercial parties.14: {"relationship":"Original 50% joint-venture investor","name":"EIG Global Energy Partners","detail":"Formed Hamilton Holdings II with Carlyle as a 50/50 joint venture and sold its 50% indirect interest to Carlyle in June 2021.","official_url":null} — EIG Global Energy Partners · confidence: high
- Commercial parties.17: {"relationship":"Senior debt arrangers","name":"Goldman Sachs, Credit Suisse, and Ares Capital","detail":"Arranged the senior debt financing for the Liberty project.","official_url":null} — Siemens wins $400 million power plant order in U.S. · confidence: medium
- Commercial parties.18: {"relationship":"Financing documentation agent","name":"Union Bank","detail":"Served as documentation agent for the original senior debt financing.","official_url":null} — Siemens wins $400 million power plant order in U.S. · confidence: medium

## Timeline

- 2013-04-01 — Construction limited notice to proceed
  Gemma Power Systems received limited notice to proceed for the Panda Liberty project.
  Source: Source (https://gemmapower.com/our-work/combined-cycle/panda-liberty-power-project)
- 2013-08-21 — Construction full notice to proceed
  Gemma received full notice to proceed for construction of the combined-cycle facility.
  Source: Source (https://gemmapower.com/our-work/combined-cycle/panda-liberty-power-project)
- 2016-04 — Substantial construction completion
  Gemma reported substantial completion of the Panda Liberty project.
  Source: Source (https://gemmapower.com/our-work/combined-cycle/panda-liberty-power-project)
- 2016-10 — Official commissioning
  Siemens and Panda Power Funds celebrated commissioning of the Panda Liberty Power Project.
  Source: Panda Power’s Liberty Gas Plant Enters Production (https://www.power-eng.com/gas/turbines/panda-power-s-liberty-gas-plant-enters-production/)
- 2020-06-16 — Legal name change
  Panda Liberty LLC changed its name to Hamilton Liberty LLC effective June 16, 2020.
  Source: Source (https://www.srbc.gov/waav/Search/getabr?projectnumber=ABR-201301007&documenttype=Approval&isabre=True)
- 2023-03-31 — BCPG purchase agreement
  BCPG USA entered into a purchase and sale agreement with Franklin Power Holdings for a 25% interest in Hamilton Holdings II for approximately $260 million.
  Source: BCPG closes a THB 9,000-million acquisition deal for 426 MW of net capacity in two natural gas power plants in the US | BCPG (https://www.bcpggroup.com/en/newsroom/news/129/bcpg-closes-a-thb-9000-million-acquisition-deal-for-426-mw-of-net-capacity-in-two-natural-gas-power-plants-in-the-us)
- 2026-01-05 — Prospective Vistra acquisition
  Vistra announced definitive agreements to acquire Cogentrix, including Hamilton-Liberty; closing was expected in mid-to-late 2026 and remained subject to approvals.
  Source: Vistra Adds to its Industry-Leading Generation Portfolio with Acquisition of Cogentrix - Jan 5, 2026 (https://investor.vistracorp.com/2026-01-05-Vistra-Adds-to-its-Industry-Leading-Generation-Portfolio-with-Acquisition-of-Cogentrix)

## Sources

- [Source](https://www.monitoringanalytics.com/filings/2026/IMM_Comments_Docket_No_EC26-63_20260407-PUBLIC.pdf) — monitoringanalytics.com · tier other
- [Source](https://www.srbc.gov/waav/Search/getabr?projectnumber=ABR-201301007&documenttype=Approval&isabre=True) — srbc.gov · tier regulatory
- [Our Work - Panda Liberty Power Project](https://www.gemmapower.com/our-work/combined-cycle/panda-liberty-power-project) — gemmapower.com · tier other
- [Panda Liberty Power Project](https://www.wsp.com/en-us/projects/panda-liberty-power-project) — wsp.com · tier other
- [Vistra Adds to its Industry-Leading Generation Portfolio with Acquisition of Cogentrix - Jan 5, 2026](https://investor.vistracorp.com/2026-01-05-Vistra-Adds-to-its-Industry-Leading-Generation-Portfolio-with-Acquisition-of-Cogentrix) — investor.vistracorp.com · tier other
- [Liberty Power Project, Pennsylvania, US](https://www.power-technology.com/projects/liberty-power-project-pennsylvania/) — power-technology.com · tier other
- [Siemens Celebrates Commissioning of Panda Liberty Power Project in Pennsylvania | Mass Transit](https://www.masstransitmag.com/home/press-release/12274856/siemens-industry-inc-siemens-celebrates-commissioning-of-panda-liberty-power-project-in-pennsylvania) — masstransitmag.com · tier other
- [765-MW Panda Liberty plant due to produce test energy around August 1](https://www.power-eng.com/renewables/765-mw-panda-liberty-plant-due-to-produce-test-energy-around-august-1/) — power-eng.com · tier other
- [SGT6-8000H Heavy-duty gas turbine (60 Hz)](https://www.siemens-energy.com/global/en/home/products-services/product/sgt6-8000h.html) — siemens-energy.com · tier other
- [EIG Global Energy Partners](https://hl.com/about-us/transactions/houlihan-lokey-advises-eig-global-energy-partners/) — hl.com · tier other
- [BCPG closes a THB 9,000-million acquisition deal for 426 MW of net capacity in two natural gas power plants in the US | BCPG](https://www.bcpggroup.com/en/newsroom/news/129/bcpg-closes-a-thb-9000-million-acquisition-deal-for-426-mw-of-net-capacity-in-two-natural-gas-power-plants-in-the-us) — bcpggroup.com · tier other
- [Siemens wins $400 million power plant order in U.S.](https://www.renewableenergyworld.com/power-grid/siemens-wins-400-million-power-plant-order-in-u-s/) — renewableenergyworld.com · tier other
- [Research Update: Panda Liberty LLC Senior Secured](https://www.spglobal.com/ratings/en/regulatory/article/-/view/sourceId/10701739) — spglobal.com · tier other
- [Milbank Named “Law Firm of the Year” by Power Finance Risk Awards](https://www.milbank.com/en/news/milbank-named-law-firm-of-the-year-by-power-finance-risk-awards.html) — milbank.com · tier other
- [Source](https://gemmapower.com/our-work/combined-cycle/panda-liberty-power-project) — gemmapower.com · tier other
- [Panda Power’s Liberty Gas Plant Enters Production](https://www.power-eng.com/gas/turbines/panda-power-s-liberty-gas-plant-enters-production/) — power-eng.com · tier other
- [Carlyle Power closes on Hamilton acquisition facility - Proximo](https://www.proximoinfra.com/news/35508/carlyle-power-closes-on-hamilton-acquisition-facility) — proximoinfra.com · tier other
- [Sheet1](https://www.pjm.com/-/media/DotCom/markets-ops/energy/day-ahead/valid-bidding-locations-for-virtual-bids.xls) — pjm.com · tier other

## Data quality

- Capacity figures vary by reporting basis: historical project sources cite approximately 800-829 MW, while the current EIA-derived plant record for EIA plant 58420 lists 870 MW of nameplate capacity; this directory uses the plant-specific 870-MW figure. GEN1 is listed with a 30-MW uprate completed in May 2025, while GEN2 is listed with a 30-MW planned uprate for May 2026. Both units remain listed as operating, and no retirement or repowering is documented.

---

Canonical page: https://askthegrid.com/assets/facilities/hamilton-liberty

Source: Ask the Grid — https://askthegrid.com/