# Hardscrabble Wind Power LLC

NYISO asset profile · https://askthegrid.com/assets/facilities/hardscrabble-wind-power-llc

Avangrid Power LLC - Herkimer County - NYISO

A 74 MW onshore wind facility located on approximately 6,550 acres across the towns of Fairfield, Norway, and Little Falls in Herkimer County, New York. It is connected to the NYISO system at 115 kV through the Hardscrabble Substation and Fairfield Station, interconnecting with the Valley–Inghams transmission line. The facility is owned and operated by Avangrid Power LLC and classified as an independent power producer (IPP) non-combined-heat-and-power generator serving the wholesale market.

## Metrics

- **Nameplate capacity:** 74 MW — Canonical EIA plant baseline.
- **Registry anchor:** Plant 57287 — plant-57287

## Facts

- **Technology:** Onshore Wind Turbine
- **Operator:** Avangrid Power LLC

## Related parties

- **Former owner / developer:** Iberdrola Renewables — Historical developer and predecessor operator ([source](https://www.iberdrola.com/))
- **Construction contractor:** Mortenson — Historical construction contractor ([source](https://www.mortenson.com/))
- **Parent company:** Iberdrola, S.A. — Parent company and majority shareholder ([source](https://www.iberdrola.com/))
- **Parent company:** Avangrid, Inc. — Parent company of Avangrid Power LLC ([source](https://www.avangrid.com/))

## Sources

- [rochester.edu](http://www.rochester.edu/college/gradstudies/assets/pdf/iberdola/AVANGRID-PressRelease2015-16.pdf) — rochester.edu · public_source — Source retained for exact-record publication review.
- [avangrid.com](https://www.avangrid.com/w/new-yorks-newest-wind-farm-now-under-construction) — avangrid.com · public_source — Source retained for exact-record publication review.

---

Canonical page: https://askthegrid.com/assets/facilities/hardscrabble-wind-power-llc
Website: [Avangrid Power LLC](https://www.avangrid.com/)

Source: Ask the Grid — https://askthegrid.com/
