EIA plant 2951 · Inventory reporting month: 2026-08.

- natural gas: 564 MW operating nameplate
- Capacity basis: operating_generator_nameplate_mw
- Source inventory: [EIA-860M workbook (preliminary)](https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx)
- Inventory retrieved: 2026-10-10T02:12:40.665346+00:00
- Filed coordinate (longitude, latitude): -97.17969, 35.50866
- OSM extract: 2026-10-08T20:21:06Z
- OSM mapped edit: 2023-01-25 04:37:37+00:00
- Map prepared: 2026-10-10T02:28:20.879919+00:00

Battery power (MW) and stored energy (MWh) are separate measures. Shared physical-site membership does not establish electrical connectivity, settlement or a common export limit.

## Reviewed overview

Horseshoe Lake Power Plant in Harrah, Oklahoma, is owned and operated by Oklahoma Gas & Electric and has been in operation for more than 100 years. OG&E is replacing two aging units that served more than 60 years with Units 11 and 12, simple-cycle GE Vernova 7FA.05 combustion turbines providing about 448 MW and designed to burn hydrogen if available. Unit 11 passed its performance tests in 2026.

## Reviewed metrics

- **Nameplate capacity:** 564 MW — Canonical EIA plant baseline.
- **Registry anchor:** Plant 2951 — plant-2951

## Facts

- **Technology:** Natural Gas Fired Combustion Turbine, Natural Gas Steam Turbine
- **Operator:** Oklahoma Gas & Electric Company (OG&E)
- **Operating status:** Operating

## Related parties

- **Owner / operator:** Oklahoma Gas & Electric Company (OG&E) — owner ([source](https://www.oge.com))
- **Equipment supplier:** GE Vernova — turbine supplier ([source](https://www.gevernova.com))

## Sources

- [oge.com](https://www.oge.com/web/portal/-/142-press-release) — oge.com · public_source — Source retained for exact-record publication review.
- [power-eng.com](https://www.power-eng.com/gas/turbines/oges-new-gas-unit-at-horseshoe-lake-plant-is-ready-for-operation-six-months-ahead-of-schedule/) — power-eng.com · public_source — Source retained for exact-record publication review.

---

Canonical page: https://askthegrid.com/assets/facilities/horseshoe-lake
Website: [Oklahoma Gas & Electric Company (OG&E)](https://www.oge.com)

Source: Ask the Grid — https://askthegrid.com/