# Indeck Oswego Energy Center

NYISO asset profile · https://askthegrid.com/assets/facilities/indeck-oswego-energy-center

Indeck-Oswego Limited Partnership - Oswego County - NYISO

A natural-gas-fired 1×1 combined-cycle cogeneration facility in Oswego, New York, owned and operated by Indeck-Oswego Limited Partnership. The facility comprises a GE Frame 6 combustion turbine, a dual-pressure heat-recovery steam generator with Coen duct burner, and a GE extraction/condensing steam turbine. Placed in service in 1990, the plant generates electricity for sale to National Grid and steam for an adjacent industrial facility. The facility is an Exempt Wholesale Generator under FERC regulations, interconnected to National Grid at 115 kV in NYISO Zone C (PTID 23783), and operates on natural gas with Number 2 distillate oil as backup fuel.

## Metrics

- **Nameplate capacity:** 57.400000000000006 MW — Canonical EIA plant baseline.
- **Registry anchor:** Plant 50450 — plant-50450

## Facts

- **Technology:** Natural Gas Fired Combined Cycle

## Related parties

- **Developer:** Indeck Energy Services of Oswego, Inc. — General partner of Indeck-Oswego Limited Partnership and development affiliate; identified as the wholly owned subsidiary of Indeck Energy Services, Inc. that planned and filed for facility development in 1989.
- **Fuel supplier:** Indeck Gas Supply Corporation — Planned natural-gas supplier affiliate identified in 1989 development filing; supplied Canadian natural gas under a gas purchase agreement.
- **Land lessor:** Hammermill Paper Company / International Paper Company — Adjacent industrial facility host; Hammermill originally owned the paper mill adjacent to the energy center; International Paper later acquired the mill.
- **Equipment supplier:** General Electric (GE) — OEM for gas turbine and steam turbine. ([source](https://www.gevernova.com/gas-power/products/gas-turbines/6b))
- **Equipment supplier:** John Cockerill Energy Solutions — HRSG manufacturer. ([source](http://energy.johncockerill.com/en/boilers-and-heat-recovery-steam-generators))

## Sources

- [extapps.dec.ny.gov](http://extapps.dec.ny.gov/data/dar/afs/permits/prr_735120000500006_r1_1.pdf) — extapps.dec.ny.gov · authoritative — Source retained for exact-record publication review.
- [hgeo.energy.gov](http://hgeo.energy.gov/ng_regulation/sites/default/files/programs/gasregulation/authorizations/1989/orders/ord327.pdf) — hgeo.energy.gov · authoritative — Source retained for exact-record publication review.
- [johncockerill.com](http://johncockerill.com/wp-content/uploads/2023/05/john-cockerill-energy-solutions-hrsgs-reference-list-2023_hd.pdf) — johncockerill.com · public_source — Source retained for exact-record publication review.
- [nyiso.com](http://nyiso.com/documents/20142/3026625/indeck_oswego.pdf/4d9e9efd-1d05-2fae-208d-dbcaeac476ee) — nyiso.com · public_source — Source retained for exact-record publication review.

---

Canonical page: https://askthegrid.com/assets/facilities/indeck-oswego-energy-center
Website: [Indeck-Oswego Limited Partnership](https://indeckenergy.com/)

Source: Ask the Grid — https://askthegrid.com/
