# Ironwood LLC

PJM Natural Gas Fired Combined Cycle · https://askthegrid.com/assets/facilities/ironwood-llc

Ironwood LLC is a natural gas-fired power facility with 777.6 MW of EIA-reported nameplate capacity in Lebanon County, Pennsylvania, registered as EIA Plant ID 55337. The facility interconnects at South Lebanon at 230 kV.

## Key facts

- Technology: Natural Gas Fired Combined Cycle
- Power capacity: 777.5999999999999 MW
- Operating status: operating

## Grid and market context

- ISO/RTO: PJM
- Balancing authority: PJM Interconnection, LLC (PJM)
- Substation: South Lebanon
- Point of interconnection: South Lebanon
- Transmission owner: Metropolitan Edison Co
- Interconnection voltage: 230 kV

## Source-backed facts

- Owner logo domain: nrg.com — Power Plant Locations & Asset Map · confidence: medium
- Identifiers.10: {"value":"IRONWOOD 3","system":"PJM RPM resource"} — Sheet1 · confidence: medium
- Identifiers.11: {"value":"572 - IRONWOOD CT-1","system":"PJM RPM resource"} — Sheet1 · confidence: medium
- Identifiers.12: {"value":"573 - IRONWOOD CT-2","system":"PJM RPM resource"} — Sheet1 · confidence: medium
- Parties.0: {"relationship":"Current parent owner; NRG asset map reports 100% ownership","name":"NRG Energy, Inc.","official_url":"https://www.nrg.com/"} — Power Plant Locations & Asset Map · confidence: high
- Parties.9: {"relationship":"Current turbine service and warranty contractor","name":"Siemens Energy, Inc.","official_url":"https://www.siemens-energy.com/"} — NRG ENERGY, INC. (Form: 8-K, Received: 03/02/2026 16:34:25) · confidence: high
- Parties.11: {"relationship":"Historical owner and seller of the plant","name":"Talen Energy","official_url":"https://www.talenenergy.com/"} — Talen Energy announces sale of three power plants for $1.5B · confidence: medium
- Parties.13: {"relationship":"Project financing arranger","name":"Lehman Brothers","official_url":null} — AES Ironwood CCGT Power Plant, Lebanon, PA - Power Technology · confidence: medium
- Parties.14: {"relationship":"Project financing co-manager","name":"Morgan Stanley Dean Witter","official_url":"https://www.morganstanley.com/"} — AES Ironwood CCGT Power Plant, Lebanon, PA - Power Technology · confidence: medium
- Parties.15: {"relationship":"Project financing co-manager","name":"Dresdner Kleinwort Benson","official_url":null} — AES Ironwood CCGT Power Plant, Lebanon, PA - Power Technology · confidence: medium
- Construction scope: Fixed-price turnkey Siemens Westinghouse design, engineering, procurement, and construction of the Ironwood combined-cycle plant. Installed scope comprises two Westinghouse 501G combustion turbines, two heat-recovery steam generators, and one steam turbine; Siemens Westinghouse also procured the balance-of-plant equipment. Site construction included two pre-engineered buildings, piers and foundations, duct banks, a fuel unloading depot, and foundations for transmission equipment, water-treatment tanks, and conveying systems. — Source · confidence: medium
- Construction scope: Fixed-price turnkey Siemens Westinghouse design, engineering, procurement, and construction of the Ironwood combined-cycle plant. Installed scope comprises two Westinghouse 501G combustion turbines, two heat-recovery steam generators, and one steam turbine; Siemens Westinghouse also procured the balance-of-plant equipment. Site construction included two pre-engineered buildings, piers and foundations, duct banks, a fuel unloading depot, and foundations for transmission equipment, water-treatment tanks, and conveying systems. — Source · confidence: medium
- Product url: https://www.siemens-energy.com/global/en/home/products-services/product/sgt6-5000f.html — SGT6-5000F Heavy-duty gas turbine (60 Hz) · confidence: medium
- Manufacturer domain: siemens-energy.com — SGT6-5000F Heavy-duty gas turbine (60 Hz) · confidence: medium
- Description: Ironwood LLC is an operating natural-gas-fired combined-cycle plant in Lebanon County, Pennsylvania, with three operating generators totaling 777.6 MW. The facility began commercial operation on December 28, 2001, after construction began in 1999; its original developer and owner was AES Ironwood. Ownership subsequently passed to PPL, Talen Energy, TransCanada, and Helix Generation, an LS Power affiliate, before NRG completed its acquisition of the LS Power portfolio in January 2026. The plant connects to PJM at the South Lebanon 230-kV point of interconnection and is held through Helix Ironwood LLC. — Siemens Westinghouse Will Construct a New Power Plant for AES Ironwood · confidence: medium
- Description: Ironwood LLC is an operating natural-gas-fired combined-cycle plant in Lebanon County, Pennsylvania, with three operating generators totaling 777.6 MW. The facility began commercial operation on December 28, 2001, after construction began in 1999; its original developer and owner was AES Ironwood. Ownership subsequently passed to PPL, Talen Energy, TransCanada, and Helix Generation, an LS Power affiliate, before NRG completed its acquisition of the LS Power portfolio in January 2026. The plant connects to PJM at the South Lebanon 230-kV point of interconnection and is held through Helix Ironwood LLC. — Source · confidence: medium
- Description: Ironwood LLC is an operating natural-gas-fired combined-cycle plant in Lebanon County, Pennsylvania, with three operating generators totaling 777.6 MW. The facility began commercial operation on December 28, 2001, after construction began in 1999; its original developer and owner was AES Ironwood. Ownership subsequently passed to PPL, Talen Energy, TransCanada, and Helix Generation, an LS Power affiliate, before NRG completed its acquisition of the LS Power portfolio in January 2026. The plant connects to PJM at the South Lebanon 230-kV point of interconnection and is held through Helix Ironwood LLC. — Form 8-K/A for NRG Energy INC filed 02/02/2026 · confidence: medium
- Quality notes: ["Capacity figures vary by reporting basis: EIA generator records total 777.6 MW, while owner and transaction materials variously round Ironwood to approximately 760, 768.2, 778, or 705 MW net.","The original SEC project filing describes a 705-MW net facility, whereas later generator records report 259.2 MW for each of CT1, CT2, and ST4; these are different capacity definitions and reporting vintages.","EIA generator records show CT1, CT2, and ST4 operating with no completed uprate or derate. No separately documented expansion, retirement, or repowering milestone was identified in the cited plant history.","Portfolio transaction values for TransCanada-to-Helix/LS Power and LS Power-to-NRG are portfolio-level figures. — Power Plant Locations & Asset Map · confidence: medium
- Quality notes: ["Capacity figures vary by reporting basis: EIA generator records total 777.6 MW, while owner and transaction materials variously round Ironwood to approximately 760, 768.2, 778, or 705 MW net.","The original SEC project filing describes a 705-MW net facility, whereas later generator records report 259.2 MW for each of CT1, CT2, and ST4; these are different capacity definitions and reporting vintages.","EIA generator records show CT1, CT2, and ST4 operating with no completed uprate or derate. No separately documented expansion, retirement, or repowering milestone was identified in the cited plant history.","Portfolio transaction values for TransCanada-to-Helix/LS Power and LS Power-to-NRG are portfolio-level figures. — Form 8-K/A for NRG Energy INC filed 02/02/2026 · confidence: medium
- Financing summary: Original project financing consisted of $308.5 million of senior secured, non-recourse bonds sold on June 25, 1999. The original SEC filing estimated total construction cost at approximately $339.1 million. Lehman Brothers primarily managed the bond sale, with Morgan Stanley Dean Witter and Dresdner Kleinwort Benson as co-managers. Separately, PPL's April 2012 acquisition of AES Ironwood and AES Prescott had approximately $304 million of total consideration; TransCanada agreed in October 2015 to acquire Ironwood from Talen for $654 million, including assumption and repayment of $42 million of debt, and Talen later reported the completed transaction at $657 million. TransCanada's June 2017 sale of four Northeast assets, including Ironwood, to Helix Generation was approximately $2.1 billion. NRG's January 2026 acquisition of the LS Power portfolio was announced at approximately $12.0 billion of enterprise value, comprising $6.4 billion of cash consideration, approximately $2.8 billion of NRG stock, approximately $3.2 billion of assumed net debt, and an approximately $0.4 billion tax-benefit adjustment; these portfolio values are not standalone Ironwood project financing or valuation figures. — Source · confidence: high
- Financing summary: Original project financing consisted of $308.5 million of senior secured, non-recourse bonds sold on June 25, 1999. The original SEC filing estimated total construction cost at approximately $339.1 million. Lehman Brothers primarily managed the bond sale, with Morgan Stanley Dean Witter and Dresdner Kleinwort Benson as co-managers. Separately, PPL's April 2012 acquisition of AES Ironwood and AES Prescott had approximately $304 million of total consideration; TransCanada agreed in October 2015 to acquire Ironwood from Talen for $654 million, including assumption and repayment of $42 million of debt, and Talen later reported the completed transaction at $657 million. TransCanada's June 2017 sale of four Northeast assets, including Ironwood, to Helix Generation was approximately $2.1 billion. NRG's January 2026 acquisition of the LS Power portfolio was announced at approximately $12.0 billion of enterprise value, comprising $6.4 billion of cash consideration, approximately $2.8 billion of NRG stock, approximately $3.2 billion of assumed net debt, and an approximately $0.4 billion tax-benefit adjustment; these portfolio values are not standalone Ironwood project financing or valuation figures. — TransCanada Enters Agreement to Acquire Ironwood Power Plant · confidence: high
- Financing summary: Original project financing consisted of $308.5 million of senior secured, non-recourse bonds sold on June 25, 1999. The original SEC filing estimated total construction cost at approximately $339.1 million. Lehman Brothers primarily managed the bond sale, with Morgan Stanley Dean Witter and Dresdner Kleinwort Benson as co-managers. Separately, PPL's April 2012 acquisition of AES Ironwood and AES Prescott had approximately $304 million of total consideration; TransCanada agreed in October 2015 to acquire Ironwood from Talen for $654 million, including assumption and repayment of $42 million of debt, and Talen later reported the completed transaction at $657 million. TransCanada's June 2017 sale of four Northeast assets, including Ironwood, to Helix Generation was approximately $2.1 billion. NRG's January 2026 acquisition of the LS Power portfolio was announced at approximately $12.0 billion of enterprise value, comprising $6.4 billion of cash consideration, approximately $2.8 billion of NRG stock, approximately $3.2 billion of assumed net debt, and an approximately $0.4 billion tax-benefit adjustment; these portfolio values are not standalone Ironwood project financing or valuation figures. — NRG Energy Inc. to Acquire Premier Power Portfolio from LS Power; Transforming Generation Fleet for Growing Demand - LS Power · confidence: high
- Timeline: [{"event":"Project company formed","date":"1998-10-30","detail":"AES Ironwood, L.L.C. was formed to develop, construct, own, operate, and maintain the Lebanon County generating facility."},{"event":"Plant equipment contract","date":"1999-02","detail":"Siemens Westinghouse announced a turnkey contract for the approximately 700-MW project, comprising two 235-MW W501G combustion turbines and a 230-MW steam turbine-generator; the plant was to be owned and operated by AES Ironwood Inc."},{"event":"Construction began","date":"1999-06","detail":"Construction began in June 1999."},{"event":"Original project financing","date":"1999-06-25","detail":"AES Ironwood completed project financing through the sale of $308.5 million of senior secured bonds. The SEC filing estimated total construction cost at approximately $339.1 million."},{"event":"Provisional acceptance","date":"2001-12-27","detail":"The project received provisional acceptance under the construction and equipment arrangements."},{"event":"Commercial operation","date":"2001-12-28","detail":"AES Ironwood commenced commercial operations and the facility became commercially available under its power purchase agreement with Williams Energy."},{"event":"Final acceptance","date":"2003-03-12","detail":"Final acceptance under the project agreement was granted."},{"event":"Acquisition by PPL","date":"2012-04-13","detail":"PPL Generation completed its acquisition of AES Ironwood, L.L.C. and AES Prescott, L.L.C. from a subsidiary of The AES Corporation. Total transaction consideration was approximately $304 million."},{"event":"Acquisition by TransCanada","date":"2016-02","detail":"TransCanada acquired the 778-MW Ironwood plant from Talen Energy; TransCanada's reporting states that the acquisition commenced February 1, 2016. Talen later reported completed sale consideration of $657 million."},{"event":"Acquisition by Helix Generation and LS Power","date":"2017-06-05","detail":"TransCanada completed the sale of its Northeast merchant generation assets to Helix Generation, an LS Power affiliate. The portfolio included Ironwood, and the transaction was approximately $2.1 billion for four facilities."},{"event":"Ownership restructuring","date":"2024-08-09","detail":"Gridiron, Helix, and Granite contributed 100% ownership interests in their respective generation facilities to the portfolio company that subsequently sold the LS Power portfolio to NRG."},{"event":"Acquisition by NRG","date":"2026-01-30","detail":"NRG completed its acquisition of the LS Power portfolio, including all ownership interests in Helix Ironwood LLC. NRG's asset map reports 100% ownership of Ironwood."}] — Siemens Westinghouse Will Construct a New Power Plant for AES Ironwood · confidence: high
- Timeline: [{"event":"Project company formed","date":"1998-10-30","detail":"AES Ironwood, L.L.C. was formed to develop, construct, own, operate, and maintain the Lebanon County generating facility."},{"event":"Plant equipment contract","date":"1999-02","detail":"Siemens Westinghouse announced a turnkey contract for the approximately 700-MW project, comprising two 235-MW W501G combustion turbines and a 230-MW steam turbine-generator; the plant was to be owned and operated by AES Ironwood Inc."},{"event":"Construction began","date":"1999-06","detail":"Construction began in June 1999."},{"event":"Original project financing","date":"1999-06-25","detail":"AES Ironwood completed project financing through the sale of $308.5 million of senior secured bonds. The SEC filing estimated total construction cost at approximately $339.1 million."},{"event":"Provisional acceptance","date":"2001-12-27","detail":"The project received provisional acceptance under the construction and equipment arrangements."},{"event":"Commercial operation","date":"2001-12-28","detail":"AES Ironwood commenced commercial operations and the facility became commercially available under its power purchase agreement with Williams Energy."},{"event":"Final acceptance","date":"2003-03-12","detail":"Final acceptance under the project agreement was granted."},{"event":"Acquisition by PPL","date":"2012-04-13","detail":"PPL Generation completed its acquisition of AES Ironwood, L.L.C. and AES Prescott, L.L.C. from a subsidiary of The AES Corporation. Total transaction consideration was approximately $304 million."},{"event":"Acquisition by TransCanada","date":"2016-02","detail":"TransCanada acquired the 778-MW Ironwood plant from Talen Energy; TransCanada's reporting states that the acquisition commenced February 1, 2016. Talen later reported completed sale consideration of $657 million."},{"event":"Acquisition by Helix Generation and LS Power","date":"2017-06-05","detail":"TransCanada completed the sale of its Northeast merchant generation assets to Helix Generation, an LS Power affiliate. The portfolio included Ironwood, and the transaction was approximately $2.1 billion for four facilities."},{"event":"Ownership restructuring","date":"2024-08-09","detail":"Gridiron, Helix, and Granite contributed 100% ownership interests in their respective generation facilities to the portfolio company that subsequently sold the LS Power portfolio to NRG."},{"event":"Acquisition by NRG","date":"2026-01-30","detail":"NRG completed its acquisition of the LS Power portfolio, including all ownership interests in Helix Ironwood LLC. NRG's asset map reports 100% ownership of Ironwood."}] — TransCanada Reports Strong Third Quarter 2016 Financial... · confidence: high
- Timeline: [{"event":"Project company formed","date":"1998-10-30","detail":"AES Ironwood, L.L.C. was formed to develop, construct, own, operate, and maintain the Lebanon County generating facility."},{"event":"Plant equipment contract","date":"1999-02","detail":"Siemens Westinghouse announced a turnkey contract for the approximately 700-MW project, comprising two 235-MW W501G combustion turbines and a 230-MW steam turbine-generator; the plant was to be owned and operated by AES Ironwood Inc."},{"event":"Construction began","date":"1999-06","detail":"Construction began in June 1999."},{"event":"Original project financing","date":"1999-06-25","detail":"AES Ironwood completed project financing through the sale of $308.5 million of senior secured bonds. The SEC filing estimated total construction cost at approximately $339.1 million."},{"event":"Provisional acceptance","date":"2001-12-27","detail":"The project received provisional acceptance under the construction and equipment arrangements."},{"event":"Commercial operation","date":"2001-12-28","detail":"AES Ironwood commenced commercial operations and the facility became commercially available under its power purchase agreement with Williams Energy."},{"event":"Final acceptance","date":"2003-03-12","detail":"Final acceptance under the project agreement was granted."},{"event":"Acquisition by PPL","date":"2012-04-13","detail":"PPL Generation completed its acquisition of AES Ironwood, L.L.C. and AES Prescott, L.L.C. from a subsidiary of The AES Corporation. Total transaction consideration was approximately $304 million."},{"event":"Acquisition by TransCanada","date":"2016-02","detail":"TransCanada acquired the 778-MW Ironwood plant from Talen Energy; TransCanada's reporting states that the acquisition commenced February 1, 2016. Talen later reported completed sale consideration of $657 million."},{"event":"Acquisition by Helix Generation and LS Power","date":"2017-06-05","detail":"TransCanada completed the sale of its Northeast merchant generation assets to Helix Generation, an LS Power affiliate. The portfolio included Ironwood, and the transaction was approximately $2.1 billion for four facilities."},{"event":"Ownership restructuring","date":"2024-08-09","detail":"Gridiron, Helix, and Granite contributed 100% ownership interests in their respective generation facilities to the portfolio company that subsequently sold the LS Power portfolio to NRG."},{"event":"Acquisition by NRG","date":"2026-01-30","detail":"NRG completed its acquisition of the LS Power portfolio, including all ownership interests in Helix Ironwood LLC. NRG's asset map reports 100% ownership of Ironwood."}] — Form 8-K/A for NRG Energy INC filed 02/02/2026 · confidence: high
- Commercial parties.0: {"relationship":"Current parent owner","name":"NRG Energy, Inc.","detail":"Completed the acquisition of the LS Power portfolio, including Helix Ironwood LLC, on January 30, 2026. NRG's asset map reports 100% ownership of Ironwood.","official_url":"https://www.nrg.com/"} — Form 8-K/A for NRG Energy INC filed 02/02/2026 · confidence: high
- Commercial parties.2: {"relationship":"Original owner and developer","name":"AES Ironwood, L.L.C.","detail":"Project company formed in 1998 to develop, construct, own, operate, and maintain the plant; its parent was The AES Corporation.","official_url":"https://www.aes.com/"} — Source · confidence: high
- Commercial parties.2: {"relationship":"Original owner and developer","name":"AES Ironwood, L.L.C.","detail":"Project company formed in 1998 to develop, construct, own, operate, and maintain the plant; its parent was The AES Corporation.","official_url":"https://www.aes.com/"} — Siemens Westinghouse Will Construct a New Power Plant for AES Ironwood · confidence: high
- Commercial parties.4: {"relationship":"Historical owner and seller","name":"Talen Energy Corporation","detail":"Owned Ironwood before selling it to TransCanada in a transaction announced in October 2015 and completed in February 2016.","official_url":"https://www.talenenergy.com/"} — Document · confidence: high
- Commercial parties.4: {"relationship":"Historical owner and seller","name":"Talen Energy Corporation","detail":"Owned Ironwood before selling it to TransCanada in a transaction announced in October 2015 and completed in February 2016.","official_url":"https://www.talenenergy.com/"} — TransCanada Enters Agreement to Acquire Ironwood Power Plant · confidence: high
- Commercial parties.5: {"relationship":"Historical buyer and seller","name":"TransCanada Corporation, now TC Energy","detail":"Acquired Ironwood from Talen in February 2016 and sold it, with other Northeast merchant assets, to Helix Generation in June 2017.","official_url":"https://www.tcenergy.com/"} — TransCanada Enters Agreement to Acquire Ironwood Power Plant · confidence: high
- Commercial parties.5: {"relationship":"Historical buyer and seller","name":"TransCanada Corporation, now TC Energy","detail":"Acquired Ironwood from Talen in February 2016 and sold it, with other Northeast merchant assets, to Helix Generation in June 2017.","official_url":"https://www.tcenergy.com/"} — TransCanada Reports Strong Third Quarter 2016 Financial... · confidence: high
- Commercial parties.10: {"relationship":"Historical EPC contractor and turbine-generator supplier","name":"Siemens Westinghouse Power Corporation","detail":"Announced a turnkey plant contract for AES Ironwood and supplied the combustion turbine and steam turbine-generator equipment.","official_url":null} — Siemens Westinghouse Will Construct a New Power Plant for AES Ironwood · confidence: high
- Commercial parties.11: {"relationship":"Current turbine service and warranty contractor","name":"Siemens Energy, Inc.","detail":"Provides turbine and generator outage-procedure services under Ironwood warranty and long-term service arrangements.","official_url":"https://www.siemens-energy.com/"} — Source · confidence: high
- Commercial parties.12: {"relationship":"Heat-recovery steam-generator supplier","name":"Hanjung","detail":"Identified as the South Korean supplier of the plant's heat-recovery steam generators.","official_url":null} — AES Ironwood CCGT Power Plant, Lebanon, PA · confidence: medium
- Operating status: operating — Ironwood power station - Global Energy Monitor · confidence: medium

## Timeline

- 1998-10-30 — Project company formed
  AES Ironwood, L. L. C. was formed to develop, construct, own, operate, and maintain the Lebanon County generating facility.
  Source: Source (https://www.sec.gov/Archives/edgar/data/1099291/000095010303001081/mar2803_10k-ironwood.htm)
- 2001-12-28 — Commercial operation
  AES Ironwood commenced commercial operations and the facility became commercially available under its power purchase agreement with Williams Energy.
  Source: Source (https://www.sec.gov/Archives/edgar/data/1099291/000095010303001081/mar2803_10k-ironwood.htm)
- 2003-03-12 — Final acceptance
  Final acceptance under the project agreement was granted.
  Source: Source (https://www.sec.gov/Archives/edgar/data/1099291/000095010303001081/mar2803_10k-ironwood.htm)
- 2016-02 — Acquisition closed
  TransCanada completed acquisition of Ironwood natural-gas CCGT plant in Lebanon, Pennsylvania for $653 million cash after post-acquisition adjustments. 778 MW capacity, delivers energy into PJM.
  Source: TransCanada Reports Strong Third Quarter 2016 Financial Results (https://www.tcenergy.com/announcements/2016/2016-11-01transcanada-reports-strong-third-quarter-2016-financial-results/)
- 2017-06-05 — Acquisition by Helix Generation and LS Power
  TransCanada completed the sale of its Northeast merchant generation assets to Helix Generation, an LS Power affiliate. The portfolio included Ironwood, and the transaction was approximately $2.1 billion for four facilities.
  Source: TransCanada Completes Sale of U.S. Northeast Power Assets (https://www.tcenergy.com/announcements/2017/2017-06-05transcanada-completes-sale-of-u.s.-northeast-power-assets)

## Sources

- [Power Plant Locations & Asset Map](https://www.nrg.com/generation/asset-map.html) — nrg.com · tier other
- [Sheet1](https://www.pjm.com/-/media/DotCom/markets-ops/rpm/rpm-auction-info/2025-2026/2025-2026-rpm-existing-resource-list-post.xlsx) — pjm.com · tier other
- [TITLE V/STATE OPERATING PERMIT](https://files.dep.state.pa.us/air/AirQuality/AQPortalFiles/Permits/PermitDocuments/1417921[38-05019]_Issued_v1.pdf) — files.dep.state.pa.us · tier other
- [NRG ENERGY, INC. (Form: 8-K, Received: 03/02/2026 16:34:25)](https://www.otcmarkets.com/filing/html?id=19206623&guid=mty-kehzy1j1dth) — otcmarkets.com · tier other
- [1417921[38-05019]_Issued_v1.pdf](https://files.dep.state.pa.us/air/AirQuality/AQPortalFiles/Permits/PermitDocuments/1417921%5B38-05019%5D_Issued_v1.pdf) — files.dep.state.pa.us · tier other
- [Siemens Westinghouse Will Construct a New Power Plant for AES Ironwood](https://www.poweronline.com/doc/siemens-westinghouse-will-construct-a-new-pow-0001) — poweronline.com · tier other
- [AES Ironwood CCGT Power Plant, Lebanon, PA - Power Technology](https://www.power-technology.com/projects/aes/) — power-technology.com · tier other
- [Talen Energy announces sale of three power plants for $1.5B](https://www.utilitydive.com/news/talen-energy-announces-sale-of-three-power-plants-for-15b/407076/) — utilitydive.com · tier other
- [Source](https://www.sec.gov/Archives/edgar/data/1099291/000091205702020876/a2080339z10-q.htm) — sec.gov · tier regulatory
- [Source](https://burkeyconstruction.com/wp-content/uploads/Ironwood-Plant-Project-Sheet-1.pdf) — burkeyconstruction.com · tier other
- [SGT6-5000F Heavy-duty gas turbine (60 Hz)](https://www.siemens-energy.com/global/en/home/products-services/product/sgt6-5000f.html) — siemens-energy.com · tier other
- [Source](https://www.sec.gov/Archives/edgar/data/1099291/000095010303001081/mar2803_10k-ironwood.htm) — sec.gov · tier regulatory
- [Form 8-K/A for NRG Energy INC filed 02/02/2026](https://investors.nrg.com/static-files/4335d901-1657-4223-9f7e-b6be97b7bb71) — investors.nrg.com · tier other
- [TransCanada Enters Agreement to Acquire Ironwood Power Plant](https://www.tcenergy.com/announcements/2015/2015-10-08transcanada-enters-agreement-to-acquire-ironwood-power-plant/) — tcenergy.com · tier other
- [NRG Energy Inc. to Acquire Premier Power Portfolio from LS Power; Transforming Generation Fleet for Growing Demand - LS Power](https://www.lspower.com/news/nrg-energy-inc-to-acquire-premier-power-portfolio-from-ls-power-transforming-generation-fleet-for-growing-demand/) — lspower.com · tier other
- [TransCanada Reports Strong Third Quarter 2016 Financial ...](https://www.tcenergy.com/announcements/2016/2016-11-01transcanada-reports-strong-third-quarter-2016-financial-results/) — tcenergy.com · tier other
- [TransCanada Completes Sale of U.S. Northeast Power Assets](https://www.tcenergy.com/announcements/2017/2017-06-05transcanada-completes-sale-of-u.s.-northeast-power-assets) — tcenergy.com · tier other
- [Document](https://www.sec.gov/Archives/edgar/data/1161976/000162253616000148/tln-2016630x10q.htm) — sec.gov · tier regulatory
- [Source](https://otcmarkets.com/filing/html?guid=mty-kehzy1j1dth&id=19206623) — otcmarkets.com · tier other
- [Ironwood power station - Global Energy Monitor](https://www.gem.wiki/Ironwood_power_station) — gem.wiki · tier other

## Data quality

- Capacity figures vary by reporting basis: EIA generator records total 777.6 MW, while owner and transaction materials variously round Ironwood to approximately 760, 768.2, 778, or 705 MW net. The original SEC project filing describes a 705-MW net facility, whereas later generator records report 259.2 MW for each of CT1, CT2, and ST4; these are different capacity definitions and reporting vintages. EIA generator records show CT1, CT2, and ST4 operating with no completed uprate or derate. No separately documented expansion, retirement, or repowering milestone was identified in the cited plant history. Portfolio transaction values for TransCanada-to-Helix/LS Power and LS Power-to-NRG are portfolio-level figures.

---

Canonical page: https://askthegrid.com/assets/facilities/ironwood-llc