# J K Smith

PJM Natural Gas Fired Combustion Turbine · https://askthegrid.com/assets/facilities/j-k-smith

J K Smith is a natural gas-fired power facility with 938.4 MW of EIA-reported nameplate capacity in Clark County, Kentucky, registered as EIA Plant ID 54. East Kentucky Power Cooperative, Inc. is the public owner or developer; East Kentucky Power Coop, Inc is the registered plant entity or operator.
JKSMT_EK13.8 KV; PJM LMP nodes 1123180710–1123180718 · 138 kV.

## Key facts

- Technology: Natural Gas Fired Combustion Turbine
- Power capacity: 938.4 MW
- Operating status: operating
- Retirement: 2023

## Grid and market context

- ISO/RTO: PJM
- Balancing authority: PJM Interconnection, LLC (PJM)

## Source-backed facts

- Owner logo domain: ekpc.coop — East Kentucky Power Cooperative: Home · confidence: high
- Official project url: https://www.ekpc.coop/generation-making-power — Generation: Making Power | East Kentucky Power Cooperative · confidence: high
- Description: J K Smith is an operational 938.4-MW natural-gas power plant in Clark County, Kentucky, with nine generating units. East Kentucky Power Cooperative identifies J.K. Smith Station in Trapp near Winchester as a combustion-turbine facility fueled by natural gas or fuel oil. The plant's initial operation is listed as January 1999. — Generation: Making Power | East Kentucky Power Cooperative · confidence: medium
- Identifiers.0: {"value":"54","system":"EIA plant code"} — MBR | Index · confidence: high
- Identifiers.1: {"value":"5580","system":"EIA utility code"} — MBR | Index · confidence: medium
- Parties.0: {"relationship":"Owner and operator","name":"East Kentucky Power Cooperative, Inc.","official_url":"https://www.ekpc.coop/"} — Microsoft Word - EKPC Liberty Rice FINAL EA April 2025 · confidence: high
- Parties.1: {"relationship":"Engineering, procurement, and construction contractor","name":"KBR","official_url":"https://www.kbr.com/en"} — Power plant profile: JK Smith Gas Fired Power Station, US · confidence: medium
- Parties.2: {"relationship":"Turbine supplier / OEM, reported as GE Power","name":"GE Power","official_url":"https://www.gevernova.com/gas-power"} — Power plant profile: JK Smith Gas Fired Power Station, US · confidence: medium
- Parties.2: {"relationship":"Turbine supplier / OEM, reported as GE Power","name":"GE Power","official_url":"https://www.gevernova.com/gas-power"} — 7E Gas Turbine (7E.03) · confidence: medium
- Unit configuration: Nine natural-gas-fired combustion turbines: GT1/GT2/GT3 at 119 MW each; GT4/GT5 at 87.6 MW each; GT6/GT7 at 94.9 MW each; and GT9/GT10 at 108.2 MW each. GT1–GT7 are dual-fuel natural gas/distillate-fuel-oil units; GT9 and GT10 are natural-gas-only. — Generation: Making Power | East Kentucky Power Cooperative · confidence: medium
- Product url: https://www.gevernova.com/gas-power/products/gas-turbines — Aeroderivative and Heavy-Duty Gas Turbines · confidence: high
- Product url: https://www.gevernova.com/gas-power/products/gas-turbines — 7E Gas Turbine (7E.03) | GE Vernova · confidence: high
- Kind: thermal — Generation: Making Power | East Kentucky Power Cooperative · confidence: high
- Description: J K Smith Station is a 938.4-MW natural-gas-fired combustion-turbine plant in Clark County, Kentucky, with nine operating generators. East Kentucky Power Cooperative, Inc. owns and operates the station in Trapp near Winchester; the station can use fuel oil as a backup fuel. The plant entered service in January 1999 and was developed in phases, with generator records showing additional units entering service in 2001, 2005, and 2010. Its documented expansion history includes turbine-equipment purchases, construction-management agreements, and a later PSC-approved proposal for additional peaking units. — Generation: Making Power | East Kentucky Power Cooperative · confidence: medium
- Quality notes: ["The EIA-derived plant record identifies 938.4 MW and nine generators, while a third-party project profile reports 1,055 MW; this directory uses the EIA-derived plant value and unit-level record for the exact EIA plant 54.","The 2006 PSC proceeding covered both a proposed 278-MW coal unit and five proposed combustion turbines at the J.K. Smith site. The coal proposal is treated separately from the operating natural-gas plant, and the record does not establish that all five proposed CTs entered service.","No project acquisition or station-sale consideration was identified. The February 2004 Calpine transaction is documented as a sale of two GE turbines plus engineering and construction-management services, not a sale of the J K Smith Station. No full retirement or complete repowering of the operating station was disclosed; the 2023 supercore-engine purchase was a reliability and repair-time initiative for Units 9 and 10."] — Source · confidence: medium
- Financing summary: For the expansion proposed in PSC Case No. 2005-00053, EKPC reported estimated installed costs of $259.2 million for five 90-MW combustion turbines and $533 million for a separate 278-MW coal unit. EKPC stated that it intended to finance the facilities through long-term indebtedness subject to Rural Utilities Service supervision and control. These were proposed expansion costs and intended project financing, not disclosed acquisition consideration; no station purchase price or sale financing was identified. — 1400 East Kentucky Power Cooperative, Inc. 01/01/2025 - 12/31/2025 Principal Payment and Interest Information · confidence: medium
- Timeline: [{"event":"Initial commercial operation","date":"1999-01","detail":"The gas-fired project was commissioned in January 1999; the plant record identifies East Kentucky Power Cooperative as the owner."},{"event":"Additional gas-turbine units entered service","date":"2001","detail":"EIA-derived generator records list GT4 and GT5 as operating from November 2001."},{"event":"Expansion proposal awarded","date":"2003-04","detail":"East Kentucky awarded Calpine Power Services and BE&K a proposal for the J.K. Smith turbine expansion."},{"event":"PSC approval for two-turbine project","date":"2004-01","detail":"The Kentucky Public Service Commission approved the two-turbine expansion before the February 2004 Calpine agreement."},{"event":"Two-turbine equipment sale and construction-management agreement","date":"2004-02-27","detail":"Calpine Power Services finalized an agreement to sell and install two GE 7EA natural-gas combustion turbines from Calpine inventory and received contracts for engineering, design, construction management, and equipment procurement; Calpine planned to manage installation with BE&K."},{"event":"Two additional generator units entered service","date":"2005-01","detail":"EIA-derived records list GT6 and GT7 as operating from January 2005, following the 2004 turbine expansion agreements."},{"event":"Application for five CTs and separate coal unit","date":"2005-01-31","detail":"EKPC filed a PSC application for a 278-MW circulating-fluidized-bed coal unit and five nominal 90-MW combustion turbines identified as Smith CTs 8-12 at the J.K. Smith site."},{"event":"PSC certificate for proposed expansion","date":"2006-08-29","detail":"The PSC granted EKPC authority to construct the proposed 278-MW coal unit and five 90-MW combustion turbines; the gas turbines were intended to provide peaking capacity."},{"event":"First LMS100 commercial operation scheduled","date":"2007-04","detail":"GE's five-LMS100 contract announcement scheduled the first unit for commercial operation in April 2007."},{"event":"Two LMS100 commercial operations scheduled","date":"2007-11","detail":"The same GE announcement scheduled two additional units for commercial operation in November 2007."},{"event":"Final two LMS100 commercial operations scheduled","date":"2008-04","detail":"The GE announcement scheduled the final two units for commercial operation in April 2008."},{"event":"Later generator additions entered service","date":"2010-05","detail":"EIA-derived records list GT9 and GT10 as operating from May 2010."},{"event":"Unit 10 repair and reliability upgrade","date":"2023","detail":"Unit 10 returned to service in late 2023 after more than a year offline with turbine damage; EKPC's board approved a backup supercore engine for Units 9 and 10 to shorten future repair outages."},{"event":"Acquisition or station sale","date":null,"detail":"No acquisition, predecessor-owner transfer, station sale, or sale consideration was identified in the reviewed ownership and project records; the documented 2004 sale involved turbine equipment and services."},{"event":"Retirement or full repowering","date":null,"detail":"No retirement or complete repowering of the operating J K Smith Station was disclosed. The 2023 supercore-engine purchase is treated as maintenance and reliability equipment rather than a full repowering."}] — Source · confidence: medium
- Timeline: [{"event":"Initial commercial operation","date":"1999-01","detail":"The gas-fired project was commissioned in January 1999; the plant record identifies East Kentucky Power Cooperative as the owner."},{"event":"Additional gas-turbine units entered service","date":"2001","detail":"EIA-derived generator records list GT4 and GT5 as operating from November 2001."},{"event":"Expansion proposal awarded","date":"2003-04","detail":"East Kentucky awarded Calpine Power Services and BE&K a proposal for the J.K. Smith turbine expansion."},{"event":"PSC approval for two-turbine project","date":"2004-01","detail":"The Kentucky Public Service Commission approved the two-turbine expansion before the February 2004 Calpine agreement."},{"event":"Two-turbine equipment sale and construction-management agreement","date":"2004-02-27","detail":"Calpine Power Services finalized an agreement to sell and install two GE 7EA natural-gas combustion turbines from Calpine inventory and received contracts for engineering, design, construction management, and equipment procurement; Calpine planned to manage installation with BE&K."},{"event":"Two additional generator units entered service","date":"2005-01","detail":"EIA-derived records list GT6 and GT7 as operating from January 2005, following the 2004 turbine expansion agreements."},{"event":"Application for five CTs and separate coal unit","date":"2005-01-31","detail":"EKPC filed a PSC application for a 278-MW circulating-fluidized-bed coal unit and five nominal 90-MW combustion turbines identified as Smith CTs 8-12 at the J.K. Smith site."},{"event":"PSC certificate for proposed expansion","date":"2006-08-29","detail":"The PSC granted EKPC authority to construct the proposed 278-MW coal unit and five 90-MW combustion turbines; the gas turbines were intended to provide peaking capacity."},{"event":"First LMS100 commercial operation scheduled","date":"2007-04","detail":"GE's five-LMS100 contract announcement scheduled the first unit for commercial operation in April 2007."},{"event":"Two LMS100 commercial operations scheduled","date":"2007-11","detail":"The same GE announcement scheduled two additional units for commercial operation in November 2007."},{"event":"Final two LMS100 commercial operations scheduled","date":"2008-04","detail":"The GE announcement scheduled the final two units for commercial operation in April 2008."},{"event":"Later generator additions entered service","date":"2010-05","detail":"EIA-derived records list GT9 and GT10 as operating from May 2010."},{"event":"Unit 10 repair and reliability upgrade","date":"2023","detail":"Unit 10 returned to service in late 2023 after more than a year offline with turbine damage; EKPC's board approved a backup supercore engine for Units 9 and 10 to shorten future repair outages."},{"event":"Acquisition or station sale","date":null,"detail":"No acquisition, predecessor-owner transfer, station sale, or sale consideration was identified in the reviewed ownership and project records; the documented 2004 sale involved turbine equipment and services."},{"event":"Retirement or full repowering","date":null,"detail":"No retirement or complete repowering of the operating J K Smith Station was disclosed. The 2023 supercore-engine purchase is treated as maintenance and reliability equipment rather than a full repowering."}] — GE To Provide Five Lms100™ Gas Turbines · confidence: medium
- Timeline: [{"event":"Initial commercial operation","date":"1999-01","detail":"The gas-fired project was commissioned in January 1999; the plant record identifies East Kentucky Power Cooperative as the owner."},{"event":"Additional gas-turbine units entered service","date":"2001","detail":"EIA-derived generator records list GT4 and GT5 as operating from November 2001."},{"event":"Expansion proposal awarded","date":"2003-04","detail":"East Kentucky awarded Calpine Power Services and BE&K a proposal for the J.K. Smith turbine expansion."},{"event":"PSC approval for two-turbine project","date":"2004-01","detail":"The Kentucky Public Service Commission approved the two-turbine expansion before the February 2004 Calpine agreement."},{"event":"Two-turbine equipment sale and construction-management agreement","date":"2004-02-27","detail":"Calpine Power Services finalized an agreement to sell and install two GE 7EA natural-gas combustion turbines from Calpine inventory and received contracts for engineering, design, construction management, and equipment procurement; Calpine planned to manage installation with BE&K."},{"event":"Two additional generator units entered service","date":"2005-01","detail":"EIA-derived records list GT6 and GT7 as operating from January 2005, following the 2004 turbine expansion agreements."},{"event":"Application for five CTs and separate coal unit","date":"2005-01-31","detail":"EKPC filed a PSC application for a 278-MW circulating-fluidized-bed coal unit and five nominal 90-MW combustion turbines identified as Smith CTs 8-12 at the J.K. Smith site."},{"event":"PSC certificate for proposed expansion","date":"2006-08-29","detail":"The PSC granted EKPC authority to construct the proposed 278-MW coal unit and five 90-MW combustion turbines; the gas turbines were intended to provide peaking capacity."},{"event":"First LMS100 commercial operation scheduled","date":"2007-04","detail":"GE's five-LMS100 contract announcement scheduled the first unit for commercial operation in April 2007."},{"event":"Two LMS100 commercial operations scheduled","date":"2007-11","detail":"The same GE announcement scheduled two additional units for commercial operation in November 2007."},{"event":"Final two LMS100 commercial operations scheduled","date":"2008-04","detail":"The GE announcement scheduled the final two units for commercial operation in April 2008."},{"event":"Later generator additions entered service","date":"2010-05","detail":"EIA-derived records list GT9 and GT10 as operating from May 2010."},{"event":"Unit 10 repair and reliability upgrade","date":"2023","detail":"Unit 10 returned to service in late 2023 after more than a year offline with turbine damage; EKPC's board approved a backup supercore engine for Units 9 and 10 to shorten future repair outages."},{"event":"Acquisition or station sale","date":null,"detail":"No acquisition, predecessor-owner transfer, station sale, or sale consideration was identified in the reviewed ownership and project records; the documented 2004 sale involved turbine equipment and services."},{"event":"Retirement or full repowering","date":null,"detail":"No retirement or complete repowering of the operating J K Smith Station was disclosed. The 2023 supercore-engine purchase is treated as maintenance and reliability equipment rather than a full repowering."}] — Source · confidence: medium
- Timeline: [{"event":"Initial commercial operation","date":"1999-01","detail":"The gas-fired project was commissioned in January 1999; the plant record identifies East Kentucky Power Cooperative as the owner."},{"event":"Additional gas-turbine units entered service","date":"2001","detail":"EIA-derived generator records list GT4 and GT5 as operating from November 2001."},{"event":"Expansion proposal awarded","date":"2003-04","detail":"East Kentucky awarded Calpine Power Services and BE&K a proposal for the J.K. Smith turbine expansion."},{"event":"PSC approval for two-turbine project","date":"2004-01","detail":"The Kentucky Public Service Commission approved the two-turbine expansion before the February 2004 Calpine agreement."},{"event":"Two-turbine equipment sale and construction-management agreement","date":"2004-02-27","detail":"Calpine Power Services finalized an agreement to sell and install two GE 7EA natural-gas combustion turbines from Calpine inventory and received contracts for engineering, design, construction management, and equipment procurement; Calpine planned to manage installation with BE&K."},{"event":"Two additional generator units entered service","date":"2005-01","detail":"EIA-derived records list GT6 and GT7 as operating from January 2005, following the 2004 turbine expansion agreements."},{"event":"Application for five CTs and separate coal unit","date":"2005-01-31","detail":"EKPC filed a PSC application for a 278-MW circulating-fluidized-bed coal unit and five nominal 90-MW combustion turbines identified as Smith CTs 8-12 at the J.K. Smith site."},{"event":"PSC certificate for proposed expansion","date":"2006-08-29","detail":"The PSC granted EKPC authority to construct the proposed 278-MW coal unit and five 90-MW combustion turbines; the gas turbines were intended to provide peaking capacity."},{"event":"First LMS100 commercial operation scheduled","date":"2007-04","detail":"GE's five-LMS100 contract announcement scheduled the first unit for commercial operation in April 2007."},{"event":"Two LMS100 commercial operations scheduled","date":"2007-11","detail":"The same GE announcement scheduled two additional units for commercial operation in November 2007."},{"event":"Final two LMS100 commercial operations scheduled","date":"2008-04","detail":"The GE announcement scheduled the final two units for commercial operation in April 2008."},{"event":"Later generator additions entered service","date":"2010-05","detail":"EIA-derived records list GT9 and GT10 as operating from May 2010."},{"event":"Unit 10 repair and reliability upgrade","date":"2023","detail":"Unit 10 returned to service in late 2023 after more than a year offline with turbine damage; EKPC's board approved a backup supercore engine for Units 9 and 10 to shorten future repair outages."},{"event":"Acquisition or station sale","date":null,"detail":"No acquisition, predecessor-owner transfer, station sale, or sale consideration was identified in the reviewed ownership and project records; the documented 2004 sale involved turbine equipment and services."},{"event":"Retirement or full repowering","date":null,"detail":"No retirement or complete repowering of the operating J K Smith Station was disclosed. The 2023 supercore-engine purchase is treated as maintenance and reliability equipment rather than a full repowering."}] — JK Smith Gas Fired Power Station - Market Research Reports & Consulting | GlobalData UK Ltd. · confidence: medium
- Commercial parties.0: {"relationship":"Owner and operator","name":"East Kentucky Power Cooperative, Inc.","detail":"Owns and operates J.K. Smith Station in Trapp near Winchester, Kentucky, as a combustion-turbine facility fueled by natural gas or fuel oil.","official_url":"https://www.ekpc.coop/"} — Generation: Making Power | East Kentucky Power Cooperative · confidence: high
- Commercial parties.3: {"relationship":"Turbine supplier / OEM","name":"GE Power / GE Energy","detail":"GE was identified as the turbine supplier for the station's gas-turbine phases, including a contract to provide five LMS100 gas-turbine generators for peaking and mid-load service.","official_url":"https://www.gevernova.com/gas-power"} — GE To Provide Five Lms100™ Gas Turbines · confidence: medium
- Quality notes.2: No project acquisition or station-sale consideration was identified. The February 2004 Calpine transaction is documented as a sale of two GE turbines plus engineering and construction-management services, not a sale of the J K Smith Station. No full retirement or complete repowering of the operating station was disclosed; the 2023 supercore-engine purchase was a reliability and repair-time initiative for Units 9 and 10. — JK Smith Gas Fired Power Station - Market Research Reports & Consulting | GlobalData UK Ltd. · confidence: medium
- Quality notes.2: No project acquisition or station-sale consideration was identified. The February 2004 Calpine transaction is documented as a sale of two GE turbines plus engineering and construction-management services, not a sale of the J K Smith Station. No full retirement or complete repowering of the operating station was disclosed; the 2023 supercore-engine purchase was a reliability and repair-time initiative for Units 9 and 10. — Source · confidence: medium
- Timeline.2: {"event":"Expansion proposal awarded","date":"2003-04","detail":"East Kentucky awarded Calpine Power Services and BE&K a proposal for the J.K. Smith turbine expansion."} — Source · confidence: high
- Timeline.3: {"event":"PSC approval for two-turbine project","date":"2004-01","detail":"The Kentucky Public Service Commission approved the two-turbine expansion before the February 2004 Calpine agreement."} — Source · confidence: high
- Timeline.7: {"event":"PSC certificate for proposed expansion","date":"2006-08-29","detail":"The PSC granted EKPC authority to construct the proposed 278-MW coal unit and five 90-MW combustion turbines; the gas turbines were intended to provide peaking capacity."} — Source · confidence: high
- Timeline.8: {"event":"First LMS100 commercial operation scheduled","date":"2007-04","detail":"GE's five-LMS100 contract announcement scheduled the first unit for commercial operation in April 2007."} — GE To Provide Five Lms100™ Gas Turbines · confidence: high
- Timeline.9: {"event":"Two LMS100 commercial operations scheduled","date":"2007-11","detail":"The same GE announcement scheduled two additional units for commercial operation in November 2007."} — GE To Provide Five Lms100™ Gas Turbines · confidence: high
- Timeline.10: {"event":"Final two LMS100 commercial operations scheduled","date":"2008-04","detail":"The GE announcement scheduled the final two units for commercial operation in April 2008."} — GE To Provide Five Lms100™ Gas Turbines · confidence: high
- Timeline.12: {"event":"Unit 10 repair and reliability upgrade","date":"2023","detail":"Unit 10 returned to service in late 2023 after more than a year offline with turbine damage; EKPC's board approved a backup supercore engine for Units 9 and 10 to shorten future repair outages."} — Source · confidence: high
- Timeline.13: {"event":"Acquisition or station sale","date":null,"detail":"No acquisition, predecessor-owner transfer, station sale, or sale consideration was identified in the reviewed ownership and project records; the documented 2004 sale involved turbine equipment and services."} — JK Smith Gas Fired Power Station - Market Research Reports & Consulting | GlobalData UK Ltd. · confidence: medium
- Timeline.14: {"event":"Retirement or full repowering","date":null,"detail":"No retirement or complete repowering of the operating J K Smith Station was disclosed. The 2023 supercore-engine purchase is treated as maintenance and reliability equipment rather than a full repowering."} — Source · confidence: medium

## Timeline

- 2003-04 — Expansion proposal awarded
  East Kentucky awarded Calpine Power Services and BE&K a proposal for the J. K. Smith turbine expansion.
  Source: Source (https://media.corporate-ir.net/media_files/NYS/CPN/releases/EastKentuckyPC_2_27_04.pdf)
- 2004-01 — PSC approval for two-turbine project
  The Kentucky Public Service Commission approved the two-turbine expansion before the February 2004 Calpine agreement.
  Source: Source (https://media.corporate-ir.net/media_files/NYS/CPN/releases/EastKentuckyPC_2_27_04.pdf)
- 2004-02-27 — Two-turbine equipment sale and construction-management agreement
  Calpine Power Services finalized an agreement to sell and install two GE 7EA natural-gas combustion turbines from Calpine inventory and received contracts for engineering, design, construction management, and equipment procurement; Calpine planned to manage installation with BE&K.
  Source: Source (https://media.corporate-ir.net/media_files/NYS/CPN/releases/EastKentuckyPC_2_27_04.pdf)
- 2005-01-31 — Application for five CTs and separate coal unit
  EKPC filed a PSC application for a 278-MW circulating-fluidized-bed coal unit and five nominal 90-MW combustion turbines identified as Smith CTs 8-12 at the J. K. Smith site.
  Source: Source (https://psc.ky.gov/order_vault/Orders_2006/200500053_08292006.pdf)
- 2007-04 — First LMS100 commercial operation scheduled
  GE's five-LMS100 contract announcement scheduled the first unit for commercial operation in April 2007.
  Source: GE To Provide Five Lms100™ Gas Turbines (https://www.poweronline.com/doc/ge-to-provide-five-lms100-gas-turbines-0001)
- 2007-11 — Two LMS100 commercial operations scheduled
  The same GE announcement scheduled two additional units for commercial operation in November 2007.
  Source: GE To Provide Five Lms100™ Gas Turbines (https://www.poweronline.com/doc/ge-to-provide-five-lms100-gas-turbines-0001)
- 2008-04 — Final two LMS100 commercial operations scheduled
  The GE announcement scheduled the final two units for commercial operation in April 2008.
  Source: GE To Provide Five Lms100™ Gas Turbines (https://www.poweronline.com/doc/ge-to-provide-five-lms100-gas-turbines-0001)

## Sources

- [East Kentucky Power Cooperative: Home](https://www.ekpc.coop/) — ekpc.coop · tier other
- [MBR | Index](https://mbrweb.ferc.gov/SearchlkpEIA/Index?page=220) — mbrweb.ferc.gov · tier regulatory
- [Generation: Making Power | East Kentucky Power Cooperative](https://www.ekpc.coop/generation-making-power) — ekpc.coop · tier other
- [Microsoft Word - EKPC Liberty Rice FINAL EA April 2025](https://www.rd.usda.gov/media/file/download/final-ekpc-liberty-rice-final-ea-april-2025.pdf) — rd.usda.gov · tier regulatory
- [Power plant profile: JK Smith Gas Fired Power Station, US](https://www.power-technology.com/data-insights/power-plant-profile-jk-smith-gas-fired-power-station-us/) — power-technology.com · tier other
- [7E Gas Turbine (7E.03)](https://www.gevernova.com/gas-power/products/gas-turbines/7e) — gevernova.com · tier other
- [Aeroderivative and Heavy-Duty Gas Turbines](https://www.gevernova.com/gas-power/products/gas-turbines) — gevernova.com · tier other
- [GE To Provide Five Lms100™ Gas Turbines](https://www.poweronline.com/doc/ge-to-provide-five-lms100-gas-turbines-0001) — poweronline.com · tier other
- [JK Smith Gas Fired Power Station, US](https://www.power-technology.com/marketdata/jk-smith-gas-fired-power-station-us/) — power-technology.com · tier other
- [Source](https://psc.ky.gov/order_vault/Orders_2006/200500053_08292006.pdf) — psc.ky.gov · tier regulatory
- [Source](https://media.corporate-ir.net/media_files/NYS/CPN/releases/EastKentuckyPC_2_27_04.pdf) — media.corporate-ir.net · tier other
- [1400 East Kentucky Power Cooperative, Inc. 01/01/2025 - 12/31/2025 Principal Payment and Interest Information](https://psc.ky.gov/UFR_PDF/%5CElectric%5C2025%5C1400_East_Kentucky_Power_Cooperative%20_Inc.pdf) — psc.ky.gov · tier regulatory
- [Source](https://www.ekpc.coop/sites/default/files/PDFs/2024/EKPC%202023%20Annual%20Report.pdf) — ekpc.coop · tier other
- [JK Smith Gas Fired Power Station - Market Research Reports & Consulting | GlobalData UK Ltd.](https://www.globaldata.com/store/report/jk-smith-gas-fired-power-station-profile-snapshot/) — globaldata.com · tier other
- [Source](https://psc.ky.gov/agencies/psc/press/082006/0829_r01.pdf) — psc.ky.gov · tier regulatory
- [Source](https://psc.ky.gov/pscecf/2025-00053/jacob.watson%40ekpc.coop/07022025123413/2025-00053_-_Application.pdf) — psc.ky.gov · tier regulatory
- [J K Smith power station - Global Energy Monitor](https://www.gem.wiki/J_K_Smith_power_station) — gem.wiki · tier other
- [Sheet1](https://www.pjm.com/-/media/DotCom/markets-ops/energy/day-ahead/valid-bidding-locations-for-virtual-bids.xls) — pjm.com · tier other
- [Source](https://www.monitoringanalytics.com/reports/PJM_State_of_the_Market/2024/2024-som-pjm-sec10.pdf) — monitoringanalytics.com · tier other
- [Source](https://www.monitoringanalytics.com/reports/PJM_State_of_the_Market/2024/2024-som-pjm-sec4.pdf) — monitoringanalytics.com · tier other
- [Source](https://psc.ky.gov/pscecf/2025-00087/jessica.fitch-snedegar%40ekpc.coop/04012025042343/EKPC_2025_IRP_-_Public_Redacted_Version.pdf) — psc.ky.gov · tier regulatory

## Data quality

- The EIA-derived plant record identifies 938.4 MW and nine generators, while a third-party project profile reports 1,055 MW; this directory uses the EIA-derived plant value and unit-level record for the exact EIA plant 54. The 2006 PSC proceeding covered both a proposed 278-MW coal unit and five proposed combustion turbines at the J. K. Smith site. The coal proposal is treated separately from the operating natural-gas plant, and the record does not establish that all five proposed CTs entered service. No project acquisition or station-sale consideration was identified. The February 2004 Calpine transaction is documented as a sale of two GE turbines plus engineering and construction-management services, not a sale of the J K Smith Station. No full retirement or complete repowering of the operating station was disclosed; the 2023 supercore-engine purchase was a reliability and repair-time initiative for Units 9 and 10.

---