# Javelina Wind Energy II, LLC

ERCOT asset profile · https://askthegrid.com/assets/facilities/javelina-wind-energy-ii-llc

NextEra Energy Partners, LP · Webb County · ERCOT

Javelina Wind Energy II, LLC is a wind power facility with 200 MW of EIA-reported operating capacity in Webb County, Texas, registered as EIA Plant ID 60645. Javelina Wind Energy II, LLC is the registered plant entity or operator. Its grid role is variable (intermittent) renewable generation supplying energy into the ERCOT energy-only market.

## Profile

- **Grid role:** Variable (intermittent) renewable generation supplying energy into the ERCOT energy-only market

## Metrics

- **Reported capacity:** 200 MW — EIA-reported operating capacity; nameplate, seasonal, AC/DC, and unit ratings may differ.
- **Technology:** Onshore Wind Turbine — Primary generation technology.
- **Registry anchor:** Plant 60645 — Javelina Wind Energy II, LLC · Webb County · ERCOT
- **Operating status:** Operating — Javelina Wind Energy II, LLC is operating.

## Facts

- **Reported capacity:** 200 MW — Onshore Wind Turbine · confidence: high
- **Operating status:** operating — Javelina Wind Energy II, LLC is operating. · confidence: medium
- **Location:** Webb County — ERCOT · confidence: high
- **Operator:** Javelina Wind Energy II, LLC · confidence: high
- **Asset role:** wind — ERCOT · Webb County
- **Owner:** NextEra Energy Partners — The NextEra-hosted project PDF explicitly states 'Owned by NextEra Energy Partners' and also references NextEra Energy Resources' ownership/operational relationship; The PDF provides direct textual support for NextEra Energy Partners as the owner. · confidence: medium

## Related parties

- **Operator:** Javelina Wind Energy II, LLC — Registered entity associated with Javelina Wind Energy II, LLC.

## Sources

- [Wind Power: Energy is Good for Texas](https://comptroller.texas.gov/economy/economic-data/energy/2023/wind-snap.php) — comptroller.texas.gov · regulatory — spread across 100,000 acres and four counties.
- [Monthly Outlook](https://www.ercot.com/files/docs/2024/08/02/MORA_October2024.xlsx) — ercot.com · regulatory — Aug 2, 2024 — ERCOT may face emergency conditions for the monthly peak load day … peaking at 5.74% for Hour. JAVELINA II WIND. LONG POINT SOLAR 19INR0042
- [2.0-116 WIND TURBINE](https://www.gevernova.com/hydropower/node/41) — gevernova.com · other — Photograph | 2.0-116 wind turbine installation in Shallowater, Texas, USA.

---

Canonical page: https://askthegrid.com/assets/facilities/javelina-wind-energy-ii-llc
Website: [NextEra Energy Partners, LP](https://www.nexteraenergypartners.com/)
Profile published: 2026-07-17T03:34:27.351Z
Source: Ask the Grid — https://askthegrid.com/