# Jumbo Hill Wind Project

ERCOT asset profile · https://askthegrid.com/assets/facilities/jumbo-hill-wind-project

ENGIE North America · Andrews County · ERCOT

Jumbo Hill Wind Project is an EIA-listed onshore wind turbine facility with 160. ENGIE North America is the public owner or sponsor. Commercial operation began in March 2020.

## Profile

- **Grid role:** Utility-scale wind generation in ERCOT's energy-only market.
- **Physical build:** Project completed with civil and electrical Balance-of-Plant and grid works: 57 GE onshore wind turbines (2.82 MW each), turbine foundations, access roads, collection system, substation, ~2.5 miles transmission line, and a 6,100 ft2 operations/office building.

## Metrics

- **Reported capacity:** 160.7 MW — EIA-reported operating capacity; nameplate, seasonal, AC/DC, and unit ratings may differ.
- **Technology:** Onshore Wind Turbine — Primary generation technology.
- **Registry anchor:** Plant 62630 — Engie North America · Andrews County · ERCOT
- **Operating status:** Operating — Jumbo Hill Wind Project is operating.
- **Commercial operation:** March 2020 — Best-supported operating milestone.
- **Resource stack:** 2 resources — BARROW_UNIT1 · BARROW_UNIT2

## Facts

- **Reported capacity:** 160.7 MW — Onshore Wind Turbine · confidence: high
- **Commercial operation:** March 2020 · confidence: medium
- **Location:** Andrews County — ERCOT · confidence: high
- **Operator:** Engie North America · confidence: high
- **Asset role:** wind — ERCOT · Andrews County
- **Owner:** ENGIE North America — together these identify the public owner/operator name as ENGIE North America. · confidence: medium

## Related parties

- **Operator:** ENGIE North America — Owner / developer associated with Jumbo Hill Wind Project. ([source](https://www.engie-na.com/))

## Sources

- [Jumbo Hill Wind Project, LLC](https://assets.comptroller.texas.gov/ch313/1301/1301-andrews-jumbo-appamend2.pdf) — assets.comptroller.texas.gov · regulatory — Aug 16, 2019 — Commercial Operations begins in April 2020
- [Government public record](https://interchange.puc.texas.gov/Documents/53385_2655_1464118.PDF) — interchange.puc.texas.gov · regulatory — This document will form part of the site safety induction for all site personnel, prior to site access being granted. 2.1 Project Description The Jumbo Hill Wind project is a 160 MW wind facility. It consists of 57 (GE 2.82 MW) wind turbines, a substation, and an operations building.
- [Certificate for Limitation on Appraised Value of Property for...](https://assets.comptroller.texas.gov/ch313/1301/andrews-1301-jumbo-cert.pdf) — assets.comptroller.texas.gov · regulatory — Sep 11, 2018 — Barrow Ranch/Jumbo Hill Wind … 1134 Littman 138kV (Point of Interconnection Location).
- [Andrews ISD No. 1301, Jumbo Hill Wind Project, LLC](https://comptroller.texas.gov/economy/development/prop-tax/ch313/agreement-docs-details.php?id=1301) — comptroller.texas.gov · regulatory — Chapter 313 application process: To obtain a limitation
- [Forecasted Capacity](https://www.ercot.com/files/docs/2023/03/08/SARA_Spring2023.xlsx) — ercot.com · regulatory — Mar 8, 2023 — BARROW_UNIT1, ANDREWS, WIND-O, WEST, 2021, 90.2, 90.2. 488, 0, BARROW RANCH (JUMBO HILL WIND) 2, BARROW_UNIT2, ANDREWS, WIND-O, WEST, 2021, 70.5
- [Jumbo Hill](https://www.engie-na.com/project-page/?project=jumbo%20hill) — engie-na.com · other — Jumbo Hill Wind is a 160.74MW

---

Canonical page: https://askthegrid.com/assets/facilities/jumbo-hill-wind-project
Website: [ENGIE North America](https://www.engie-na.com/project-page/?project=jumbo%20hill)
Profile published: 2026-07-17T03:34:27.822Z
Source: Ask the Grid — https://askthegrid.com/