20 MW lithium-ion battery at Luther Forest

KCE NY 1 is a 20 MW/8.4 MWh lithium-ion battery at the Luther Forest Technology Campus in Stillwater, New York. Key Capture Energy developed, owns and operates the facility; NEC Energy Solutions supplied its GSS storage platform and AEROS controls, and the project connects to NYSEG's 34.5 kV Luther Forest substation.

## Profile

- **Current registry:** The June 2026 preliminary EIA inventory lists KCE NY1 LLC as operator and status OP.

## Metrics

- **Storage nameplate:** 20 MW / 8.4 MWh — June 2026 preliminary EIA inventory; 1 generator record.

## Facts

- **EIA operator:** KCE NY1 LLC — June 2026 preliminary EIA inventory; status OP.
- **Location:** Luther Forest Technology Campus, Stillwater · Saratoga · NY
- **Technology:** Lithium-ion battery
- **Operating records:** 2019-03

## Sources

- [June 2026 EIA-860M generator inventory](https://www.eia.gov/electricity/data/eia860m/xls/june_generator2026.xlsx) — U.S. Energy Information Administration · authoritative — Current generator capacity, technology, operating status, operator, and service-date records.
- [NEC Energy Solutions to supply KCE NY 1](https://www.nec.com/en/press/201809/global_20180927_05.html) — NEC Corporation · authoritative — NEC supplied the GSS platform and AEROS controls.

---