# Kelso Solar

MISO asset profile · https://askthegrid.com/assets/facilities/kelso-solar

## Current generation inventory

EIA plant 69319 · Inventory reporting month: 2026-08.

- solar: 200 MW operating nameplate
- Capacity basis: operating_generator_nameplate_mw
- Source inventory: [EIA-860M workbook (preliminary)](https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx)
- Inventory retrieved: 2026-10-10T02:12:40.665346+00:00
- Filed coordinate (longitude, latitude): -89.52, 37.05
- OSM extract: 2026-10-08T20:21:06Z
- OSM mapped edit: 2026-02-07 22:23:59+00:00
- Map prepared: 2026-10-10T02:28:18.142523+00:00

Battery power (MW) and stored energy (MWh) are separate measures. Shared physical-site membership does not establish electrical connectivity, settlement or a common export limit.

## Reviewed overview

Kelso Solar is a two-phase solar project in Scott County, Missouri, totaling 430 MWdc, that Arevon developed, built and will own and operate. Primoris Services Corporation's Renewables group was the construction contractor. A $509 million financial close led by CIBC funded it in March 2025, Meta signed two long-term Environmental Attributes Purchase Agreements for the project, and Arevon announced the start of operations on March 4, 2026.

## Reviewed metrics

- **Nameplate capacity:** 200 MW — Canonical EIA plant baseline.
- **Registry anchor:** Plant 69319 — plant-69319

## Facts

- **Technology:** Solar Photovoltaic
- **Operator:** Arevon
- **Operating status:** Operating

## Related parties

- **Owner / operator / developer:** Arevon — owner ([source](https://www.arevon.com))
- **EPC contractor / construction contractor:** Primoris Services Corporation — epc_contractor
- **Offtaker:** Meta — offtaker
- **Lender:** Canadian Imperial Bank of Commerce — lender
- **Lender:** Commerzbank — lender
- **Lender:** Lloyds Bank — lender

## Sources

- [prnewswire.com](https://www.prnewswire.com/news-releases/arevon-completes-509-million-financing-package-for-its-kelso-1--2-solar-projects-in-missouri-302398065.html) — prnewswire.com · public_source — Source retained for exact-record publication review.
- [prnewswire.com](https://www.prnewswire.com/news-releases/arevons-430-megawatt-kelso-solar-project-commences-operations-in-missouri-302703355.html) — prnewswire.com · public_source — Source retained for exact-record publication review.
- [prnewswire.com](https://www.prnewswire.com/news-releases/arevons-500-million-kelso-solar-project-advances-construction-in-missouri-302443711.html) — prnewswire.com · public_source — Source retained for exact-record publication review.

---