# Langford Wind Power

ERCOT asset profile · https://askthegrid.com/assets/facilities/langford-wind-power

Clearway Energy Group · Tom Green County · ERCOT

Langford Wind Power is a wind power facility with 160 MW after repowering of EIA-reported operating capacity in Tom Green County, Texas, registered as EIA Plant ID 57153. Langford Wind Power LLC is the registered plant entity or operator. Commercial operation began on October 31, 2009.

## Profile

- **Grid role:** Utility-scale wind generation in ERCOT's energy-only market.
- **Market node:** LGD_LANGFORD.

## Metrics

- **Reported capacity:** 150 MW — EIA-reported operating capacity; nameplate, seasonal, AC/DC, and unit ratings may differ.
- **Technology:** Onshore Wind Turbine — Primary generation technology.
- **Registry anchor:** Plant 57153 — Langford Wind Power LLC · Tom Green County · ERCOT
- **Operating status:** Operating — Langford Wind Power is operating.
- **Settlement point:** LGD_LANGFORD — ERCOT settlement point.
- **Commercial operation:** October 31, 2009 — Best-supported operating milestone.
- **Resource stack:** 1 resource — LGD_LANGFORD

## Facts

- **Reported capacity:** 160 MW — Onshore Wind Turbine · confidence: high
- **Commercial operation:** October 31, 2009 · confidence: medium
- **Operating status:** operating — Langford Wind Power is operating. · confidence: medium
- **Location:** Tom Green County — ERCOT · confidence: high
- **Operator:** Langford Wind Power LLC · confidence: high
- **Asset role:** wind — ERCOT · Tom Green County
- **Owner:** Clearway Energy Group — EIA Form data lists 'Langford Wind Power LLC' (utility/owner id 56506) as the registered owner/operator for EIA Plant 57153. Clearway Energy Group's official press release states Clearway signed agreements to acquire the project and completed repowering in 2020. Because Clearway publicly acquired and repowered the project (and the registered owner entity still appears in EIA records), the appropriate public owner/parent operator name shown here is Clearway Energy Group (the acquiring/operating affiliate), with the project-level LLC recorded in EIA as the registered owner. · confidence: medium

## Related parties

- **Operator:** Langford Wind Power LLC — Registered entity associated with Langford Wind Power.

## Sources

- [Report on the Capacity, Demand and Reserves (CDR) in...](https://www.ercot.com/files/docs/2025/02/12/CapacityDemandandReservesReport_December2024.pdf) — ercot.com · regulatory — Feb 13, 2025 — Report on the Capacity, Demand and Reserves (CDR) in the ERCOT Region, This CDR reflects a December 2024 snapshot … 9.7 LANGFORD WIND POWER LGD Feb 13, 2025 — Report on the Capacity, Demand and Reserves (CDR) in the ERCOT Region, This CDR reflects a December 2024 snapshot … 9.7 LANGFORD WIND POWER LGD
- [Clearway Completes Langford Wind Farm in Texas | Mortenson](https://www.mortenson.com/news-insights/langford-repower-complete) — mortenson.com · other — Repowering Langford, which began original operations in 2009, will increase the project’s operational life by over a decade. Turbine equipment was provided by GE Renewable Energy and construction for the repowering was led by Mortensen.
- [2020 Clearway ESG Report](https://www.clearwayenergygroup.com/wp-content/uploads/2023/09/2020-Clearway-ESG-Report.pdf) — clearwayenergygroup.com · other — Our 2020 Lighthouse transaction represented a nearly $3 billion investment in carbon-free power and involved the sale of a 1.6. GW portfolio of wind and solar

---

Canonical page: https://askthegrid.com/assets/facilities/langford-wind-power