# Las Lomas Wind Project

ERCOT asset profile · https://askthegrid.com/assets/facilities/las-lomas-wind-project

ENGIE North America · Zapata County · ERCOT

Las Lomas Wind is a 201.6 MW wind facility in Zapata County, Texas. EIA's May 2026 inventory lists ENGIE North America as the registered operator and December 2020 as the service month. ENGIE identifies itself as the long-term owner and operator. Reviewed first-party sources do not establish a model-level turbine configuration, so the page does not infer one.

## Profile

- **Grid role:** Utility-scale onshore wind generation in South Texas.
- **Operating capacity:** 201.6 MW EIA and ENGIE project rating.
- **Ownership and operation:** ENGIE is the long-term owner and current EIA registered operator.

## Metrics

- **Operating capacity:** 201.6 MW — EIA and ENGIE
- **Commercial operation:** Dec 2020 — EIA May 2026
- **Owner and operator:** ENGIE — ENGIE
- **Power purchaser:** Microsoft — Majority of output
- **Registry anchor:** Plant 63101 — ENGIE North America

## Facts

- **Operating capacity:** 201.6 MW — EIA and ENGIE · confidence: high
- **Registered operator:** ENGIE North America — EIA · confidence: high
- **Long-term owner:** ENGIE — ENGIE · confidence: high
- **Majority-output purchaser:** Microsoft — ENGIE · confidence: high

## Related parties

- **Long-term owner and EIA registered operator:** ENGIE North America — ENGIE Las Lomas project page ([source](https://www.engie-na.com/))
- **Long-term purchaser of the majority of output:** Microsoft — Microsoft and ENGIE renewable agreement ([source](https://www.microsoft.com/))

## Sources

- [EIA May 2026 generator inventory](https://www.eia.gov/electricity/data/eia860m/) — U.S. Energy Information Administration · regulatory — Current generator records, capacity scopes, dates, status, operator, and technology.
- [ENGIE Las Lomas project page](https://www.engie-na.com/project/las-lomas/) — ENGIE North America · official — Current operating capacity, ownership and operating role.
- [Microsoft and ENGIE renewable agreement](https://www.engie-na.com/microsoft/) — ENGIE North America · official — Microsoft offtake scope and announcement date.

---

Canonical page: https://askthegrid.com/assets/facilities/las-lomas-wind-project
Website: [ENGIE](https://www.engie-na.com/project/las-lomas/)
Profile published: 2026-07-17T03:34:29.437Z
Source: Ask the Grid — https://askthegrid.com/