# Lawrenceburg Power, LLC

PJM Natural Gas Fired Combined Cycle · https://askthegrid.com/assets/facilities/lawrenceburg-power-llc

Lawrenceburg Power, LLC is a natural gas-fired power facility with 1,232 MW of EIA-reported nameplate capacity in Dearborn County, Indiana, registered as EIA Plant ID 55502. Commercial operation began in June 2004. The facility interconnects at LAWRENCEBURG CC 1-3 (35102831); LAWRENCEBURG CC 4-6 (35102845) at 345 kV.
LAWRENCEBURG CC 1-3 (35102831); LAWRENCEBURG CC 4-6 (35102845) · 345 kV · Indiana Michigan Power Co.

## Key facts

- Technology: Natural Gas Fired Combined Cycle
- Power capacity: 1232 MW
- Operating status: operating

## Grid and market context

- ISO/RTO: PJM
- Balancing authority: PJM Interconnection, LLC (PJM)
- Interconnection voltage: 345 kV

## Source-backed facts

- Owner logo domain: talenenergy.com — Talen Energy: Homepage · confidence: high
- Identifiers: [{"value":"55502","system":"EIA plant ID"},{"value":"PJM","system":"ISO/RTO / balancing authority"},{"value":"0100","system":"EIA generator ID"},{"value":"0200","system":"EIA generator ID"},{"value":"1100","system":"EIA generator ID"},{"value":"1200","system":"EIA generator ID"},{"value":"2100","system":"EIA generator ID"},{"value":"2200","system":"EIA generator ID"},{"value":"ER17-243-000","system":"FERC market-based-rate docket"},{"value":"EC26-59","system":"FERC Section 203 acquisition docket"}] — Lawrenceburg Power, LLC; Supplemental Notice That Initial... · confidence: medium
- Identifiers.1: {"value":"PJM","system":"ISO/RTO / balancing authority"} — Lawrenceburg Power Plant - Talen Energy · confidence: high
- Identifiers.8: {"value":"ER17-243-000","system":"FERC market-based-rate docket"} — Lawrenceburg Power, LLC; Supplemental Notice That Initial... · confidence: high
- Parties.4: {"relationship":"Former indirect owner/operator through the ECP portfolio","name":"Cornerstone Generation","official_url":"https://www.ecpgp.com/equity/portfolio/cornerstone-generation"} — Source · confidence: high
- Parties.7: {"relationship":"Former owner and operator before the 2017 transfer","name":"AEP Generating Company","official_url":"https://www.aep.com/"} — Indiana Commission Okays AEP Sale of 1,096-MW Lawrenceburg Plant · confidence: medium
- Parties.8: {"relationship":"EPC contractor","name":"Duke Fluor Daniel","official_url":null} — Lawrenceburg Combined Cycle Power Plant, US · confidence: medium
- Parties.9: {"relationship":"Turbine supplier/OEM","name":"GE Power","official_url":null} — Lawrenceburg Combined Cycle Power Plant, US · confidence: medium
- Parties.10: {"relationship":"Former Lightstone joint-venture equity sponsor","name":"Blackstone Group LP","official_url":"https://www.blackstone.com/"} — Indiana Commission Okays AEP Sale of 1,096-MW Lawrenceburg Plant · confidence: medium
- Parties.11: {"relationship":"Former Lightstone joint-venture equity sponsor","name":"ArcLight Capital Partners LLC","official_url":"https://www.arclight.com/"} — Indiana Commission Okays AEP Sale of 1,096-MW Lawrenceburg Plant · confidence: medium
- Unit configuration: Natural-gas-fired combined-cycle facility consisting of four gas-turbine units and two steam-turbine units; the EIA-linked inventory reports six operating generator records. — Lawrenceburg Power Plant - Talen Energy · confidence: medium
- Product url: https://www.gevernova.com/gas-power/products/gas-turbines/7f — 7F Heavy Duty Gas Turbine | 7F.04/7F.05 | GE Vernova · confidence: high
- Product url: https://www.gevernova.com/gas-power/products/gas-turbines/7f — Steam Turbine Power Plant Solutions | GE Vernova · confidence: high
- Manufacturer domain: gevernova.com — 7F Heavy Duty Gas Turbine | 7F.04/7F.05 | GE Vernova · confidence: medium
- Equipment models: [{"manufacturer_domain":"gevernova.com","product_url":"https://www.gevernova.com/gas-power/products/gas-turbines/7f","count":4,"unit_mw":174,"name":"GE 7F.04 gas turbine"},{"manufacturer_domain":"gevernova.com","product_url":"https://www.gevernova.com/gas-power/products/steam-turbines","count":2,"unit_mw":268,"name":"GE D11 steam turbine"}] — 7F Heavy Duty Gas Turbine | 7F.04/7F.05 | GE Vernova · confidence: medium
- Product family: GE 7F.04 gas turbines and GE D11 steam turbines — 7F Heavy Duty Gas Turbine | 7F.04/7F.05 | GE Vernova · confidence: medium
- Equipment models.0: {"manufacturer_domain":"gevernova.com","product_url":"https://www.gevernova.com/gas-power/products/gas-turbines/7f","count":4,"unit_mw":174,"name":"GE 7F.04 gas turbine"} — 7F Heavy Duty Gas Turbine | 7F.04/7F.05 | GE Vernova · confidence: high
- Description: Lawrenceburg Power, LLC is an operating natural-gas-fired combined-cycle facility in Lawrenceburg, Dearborn County, Indiana, serving the PJM market. The plant configuration comprises four gas turbines and two steam turbines; EIA-linked inventory reports six operating generators and 1,232 MW of nameplate capacity. PSEG developed the facility, which began commercial operation in June 2004, before ownership transferred to AEP in May 2007, Lightstone in January 2017, Cornerstone/ECP in 2025, and Talen Energy on June 15, 2026. Talen Energy is the current indirect owner, while Lawrenceburg Power, LLC remains the plant legal and operating entity. — Lawrenceburg Power Plant - Talen Energy · confidence: medium
- Description: Lawrenceburg Power, LLC is an operating natural-gas-fired combined-cycle facility in Lawrenceburg, Dearborn County, Indiana, serving the PJM market. The plant configuration comprises four gas turbines and two steam turbines; EIA-linked inventory reports six operating generators and 1,232 MW of nameplate capacity. PSEG developed the facility, which began commercial operation in June 2004, before ownership transferred to AEP in May 2007, Lightstone in January 2017, Cornerstone/ECP in 2025, and Talen Energy on June 15, 2026. Talen Energy is the current indirect owner, while Lawrenceburg Power, LLC remains the plant legal and operating entity. — PSEG Power LLC Completes Construction of 1,150 Megawatt Indiana P... · confidence: medium
- Description: Lawrenceburg Power, LLC is an operating natural-gas-fired combined-cycle facility in Lawrenceburg, Dearborn County, Indiana, serving the PJM market. The plant configuration comprises four gas turbines and two steam turbines; EIA-linked inventory reports six operating generators and 1,232 MW of nameplate capacity. PSEG developed the facility, which began commercial operation in June 2004, before ownership transferred to AEP in May 2007, Lightstone in January 2017, Cornerstone/ECP in 2025, and Talen Energy on June 15, 2026. Talen Energy is the current indirect owner, while Lawrenceburg Power, LLC remains the plant legal and operating entity. — tln-20260615 · confidence: medium
- Quality notes: ["Capacity figures vary by rating and source: EIA-linked inventory reports 1,232 MW nameplate capacity, 1,206.7 MW summer capacity, and 1,288 MW winter capacity; Talen reports 1,120 MW of owned generating capacity; historical transaction sources report ratings ranging from 1,096 MW to 1,186 MW. These figures appear to reflect different rating conventions rather than different facilities.","Talen describes the configuration as four gas turbines and two steam turbines, while the EIA-linked inventory counts six generators. The generator count is reported from the source and is not inferred from capacity.","The reviewed exact-plant sources document no expansion, repowering, or retirement milestone; the facility is reported as operational. The 2017 $2.1 billion figure was consideration for a four-plant portfolio, and the 2026 $3.45 billion figure was consideration for a three-asset portfolio, not Lawrenceburg-only sale consideration."] — Lawrenceburg Power Plant - Talen Energy · confidence: medium
- Quality notes: ["Capacity figures vary by rating and source: EIA-linked inventory reports 1,232 MW nameplate capacity, 1,206.7 MW summer capacity, and 1,288 MW winter capacity; Talen reports 1,120 MW of owned generating capacity; historical transaction sources report ratings ranging from 1,096 MW to 1,186 MW. These figures appear to reflect different rating conventions rather than different facilities.","Talen describes the configuration as four gas turbines and two steam turbines, while the EIA-linked inventory counts six generators. The generator count is reported from the source and is not inferred from capacity.","The reviewed exact-plant sources document no expansion, repowering, or retirement milestone; the facility is reported as operational. The 2017 $2.1 billion figure was consideration for a four-plant portfolio, and the 2026 $3.45 billion figure was consideration for a three-asset portfolio, not Lawrenceburg-only sale consideration."] — AEP Completes Sale of Four Competitive Power Plants · confidence: medium
- Quality notes: ["Capacity figures vary by rating and source: EIA-linked inventory reports 1,232 MW nameplate capacity, 1,206.7 MW summer capacity, and 1,288 MW winter capacity; Talen reports 1,120 MW of owned generating capacity; historical transaction sources report ratings ranging from 1,096 MW to 1,186 MW. These figures appear to reflect different rating conventions rather than different facilities.","Talen describes the configuration as four gas turbines and two steam turbines, while the EIA-linked inventory counts six generators. The generator count is reported from the source and is not inferred from capacity.","The reviewed exact-plant sources document no expansion, repowering, or retirement milestone; the facility is reported as operational. The 2017 $2.1 billion figure was consideration for a four-plant portfolio, and the 2026 $3.45 billion figure was consideration for a three-asset portfolio, not Lawrenceburg-only sale consideration."] — PSEG Power LLC Completes Construction of 1,150 Megawatt Indiana P... · confidence: medium
- Financing summary: An Industrial Info source reported a $500 million Lawrenceburg Merchant Energy Project cost, but not a financing instrument. AEP purchased the plant from a PSEG affiliate for approximately $325 million in May 2007; this was sale consideration, not project financing. In January 2017, AEP sold Lawrenceburg together with three other plants to Lightstone Generation for approximately $2.1 billion. For Talen's three-asset acquisition from ECP, announced January 15, 2026 and closed June 15, 2026, consideration was $3.45 billion: approximately $2.55 billion cash and 2,399,998 Talen shares. Talen funded the cash portion with proceeds from TES's April 2026 issuance of $1.5 billion of 6.125% senior unsecured notes due 2031 and $2.5 billion of 6.375% senior unsecured notes due 2033; this was acquisition financing rather than plant-level project financing. — PSEG Power LLC Completes Construction of 1,150 Megawatt Indiana P... · confidence: medium
- Financing summary: An Industrial Info source reported a $500 million Lawrenceburg Merchant Energy Project cost, but not a financing instrument. AEP purchased the plant from a PSEG affiliate for approximately $325 million in May 2007; this was sale consideration, not project financing. In January 2017, AEP sold Lawrenceburg together with three other plants to Lightstone Generation for approximately $2.1 billion. For Talen's three-asset acquisition from ECP, announced January 15, 2026 and closed June 15, 2026, consideration was $3.45 billion: approximately $2.55 billion cash and 2,399,998 Talen shares. Talen funded the cash portion with proceeds from TES's April 2026 issuance of $1.5 billion of 6.125% senior unsecured notes due 2031 and $2.5 billion of 6.375% senior unsecured notes due 2033; this was acquisition financing rather than plant-level project financing. — AEP completes purchase of Lawrenceburg Plant · confidence: medium
- Financing summary: An Industrial Info source reported a $500 million Lawrenceburg Merchant Energy Project cost, but not a financing instrument. AEP purchased the plant from a PSEG affiliate for approximately $325 million in May 2007; this was sale consideration, not project financing. In January 2017, AEP sold Lawrenceburg together with three other plants to Lightstone Generation for approximately $2.1 billion. For Talen's three-asset acquisition from ECP, announced January 15, 2026 and closed June 15, 2026, consideration was $3.45 billion: approximately $2.55 billion cash and 2,399,998 Talen shares. Talen funded the cash portion with proceeds from TES's April 2026 issuance of $1.5 billion of 6.125% senior unsecured notes due 2031 and $2.5 billion of 6.375% senior unsecured notes due 2033; this was acquisition financing rather than plant-level project financing. — AEP Completes Sale of Four Competitive Power Plants · confidence: medium
- Financing summary: An Industrial Info source reported a $500 million Lawrenceburg Merchant Energy Project cost, but not a financing instrument. AEP purchased the plant from a PSEG affiliate for approximately $325 million in May 2007; this was sale consideration, not project financing. In January 2017, AEP sold Lawrenceburg together with three other plants to Lightstone Generation for approximately $2.1 billion. For Talen's three-asset acquisition from ECP, announced January 15, 2026 and closed June 15, 2026, consideration was $3.45 billion: approximately $2.55 billion cash and 2,399,998 Talen shares. Talen funded the cash portion with proceeds from TES's April 2026 issuance of $1.5 billion of 6.125% senior unsecured notes due 2031 and $2.5 billion of 6.375% senior unsecured notes due 2033; this was acquisition financing rather than plant-level project financing. — tln-20260615 · confidence: medium
- Financing summary: An Industrial Info source reported a $500 million Lawrenceburg Merchant Energy Project cost, but not a financing instrument. AEP purchased the plant from a PSEG affiliate for approximately $325 million in May 2007; this was sale consideration, not project financing. In January 2017, AEP sold Lawrenceburg together with three other plants to Lightstone Generation for approximately $2.1 billion. For Talen's three-asset acquisition from ECP, announced January 15, 2026 and closed June 15, 2026, consideration was $3.45 billion: approximately $2.55 billion cash and 2,399,998 Talen shares. Talen funded the cash portion with proceeds from TES's April 2026 issuance of $1.5 billion of 6.125% senior unsecured notes due 2031 and $2.5 billion of 6.375% senior unsecured notes due 2033; this was acquisition financing rather than plant-level project financing. — Source · confidence: medium
- Timeline: [{"event":"Original ownership approved","date":"2000-12-20","detail":"The Indiana Utility Regulatory Commission approved PSEG Lawrenceburg Energy Company LLC as the original owner of the gas-fired combined-cycle facility."},{"event":"Construction began","date":"2001-05","detail":"Construction of the Lawrenceburg Merchant Energy Project began in May 2001."},{"event":"Construction completed","date":"2003-11","detail":"Construction was reported complete in late November 2003, followed by startup testing."},{"event":"Commercial operation","date":"2004-06","detail":"The facility began commercial operation in June 2004."},{"event":"AEP acquisition from PSEG affiliate","date":"2007-05-16","detail":"AEP Generating Company completed its approximately $325 million purchase of the Lawrenceburg Generating Station from an affiliate of Public Service Enterprise Group."},{"event":"AEP announced portfolio sale","date":"2016-09","detail":"AEP announced an approximately $2.17 billion agreement to sell four competitive plants, including Lawrenceburg, to a newly formed Blackstone–ArcLight joint venture."},{"event":"Lightstone acquisition from AEP","date":"2017-01-30","detail":"AEP completed the sale of the four-plant portfolio to Lightstone Generation for approximately $2.1 billion. Lawrenceburg was listed as one of the assets; no Lawrenceburg-only consideration was disclosed."},{"event":"Lightstone–Cornerstone purchase agreement","date":"2024-08-30","detail":"Lightstone affiliates and Cornerstone executed a Purchase and Sale Agreement under which Lightstone HoldCo agreed to sell 100% of its membership interest in Lawrenceburg Power to Cornerstone, subject to approvals and customary closing conditions."},{"event":"Indiana regulatory approval of Cornerstone transfer","date":"2025-03-19","detail":"The Indiana Utility Regulatory Commission approved the transfer of Lightstone's interest in Lawrenceburg Power and the related indirect transfer of the facility to Cornerstone."},{"event":"ECP acquisition of Cornerstone portfolio","date":"2025-07","detail":"ECP reported completing its acquisition of Cornerstone Generation, the portfolio containing Lawrenceburg, Waterford, and Darby."},{"event":"Talen definitive acquisition agreement","date":"2026-01-15","detail":"Talen Energy agreed to acquire ECP affiliates that indirectly owned Lawrenceburg, Waterford, and Darby for an announced purchase price of $3.45 billion."},{"event":"Acquisition financing issued","date":"2026-04","detail":"Talen Energy Supply issued $1.5 billion of 6.125% senior unsecured notes due 2031 and $2.5 billion of 6.375% senior unsecured notes due 2033; proceeds were intended primarily to fund the Cornerstone acquisition and partially redeem existing secured notes."},{"event":"Talen acquisition closed","date":"2026-06-15","detail":"Talen consummated the acquisition, making the Lawrenceburg-related acquired companies indirect wholly owned subsidiaries of Talen. The consideration consisted of approximately $2.55 billion cash and 2,399,998 Talen shares."}] — Source · confidence: medium
- Timeline: [{"event":"Original ownership approved","date":"2000-12-20","detail":"The Indiana Utility Regulatory Commission approved PSEG Lawrenceburg Energy Company LLC as the original owner of the gas-fired combined-cycle facility."},{"event":"Construction began","date":"2001-05","detail":"Construction of the Lawrenceburg Merchant Energy Project began in May 2001."},{"event":"Construction completed","date":"2003-11","detail":"Construction was reported complete in late November 2003, followed by startup testing."},{"event":"Commercial operation","date":"2004-06","detail":"The facility began commercial operation in June 2004."},{"event":"AEP acquisition from PSEG affiliate","date":"2007-05-16","detail":"AEP Generating Company completed its approximately $325 million purchase of the Lawrenceburg Generating Station from an affiliate of Public Service Enterprise Group."},{"event":"AEP announced portfolio sale","date":"2016-09","detail":"AEP announced an approximately $2.17 billion agreement to sell four competitive plants, including Lawrenceburg, to a newly formed Blackstone–ArcLight joint venture."},{"event":"Lightstone acquisition from AEP","date":"2017-01-30","detail":"AEP completed the sale of the four-plant portfolio to Lightstone Generation for approximately $2.1 billion. Lawrenceburg was listed as one of the assets; no Lawrenceburg-only consideration was disclosed."},{"event":"Lightstone–Cornerstone purchase agreement","date":"2024-08-30","detail":"Lightstone affiliates and Cornerstone executed a Purchase and Sale Agreement under which Lightstone HoldCo agreed to sell 100% of its membership interest in Lawrenceburg Power to Cornerstone, subject to approvals and customary closing conditions."},{"event":"Indiana regulatory approval of Cornerstone transfer","date":"2025-03-19","detail":"The Indiana Utility Regulatory Commission approved the transfer of Lightstone's interest in Lawrenceburg Power and the related indirect transfer of the facility to Cornerstone."},{"event":"ECP acquisition of Cornerstone portfolio","date":"2025-07","detail":"ECP reported completing its acquisition of Cornerstone Generation, the portfolio containing Lawrenceburg, Waterford, and Darby."},{"event":"Talen definitive acquisition agreement","date":"2026-01-15","detail":"Talen Energy agreed to acquire ECP affiliates that indirectly owned Lawrenceburg, Waterford, and Darby for an announced purchase price of $3.45 billion."},{"event":"Acquisition financing issued","date":"2026-04","detail":"Talen Energy Supply issued $1.5 billion of 6.125% senior unsecured notes due 2031 and $2.5 billion of 6.375% senior unsecured notes due 2033; proceeds were intended primarily to fund the Cornerstone acquisition and partially redeem existing secured notes."},{"event":"Talen acquisition closed","date":"2026-06-15","detail":"Talen consummated the acquisition, making the Lawrenceburg-related acquired companies indirect wholly owned subsidiaries of Talen. The consideration consisted of approximately $2.55 billion cash and 2,399,998 Talen shares."}] — PSEG Power LLC Completes Construction of 1,150 Megawatt Indiana P... · confidence: medium
- Timeline: [{"event":"Original ownership approved","date":"2000-12-20","detail":"The Indiana Utility Regulatory Commission approved PSEG Lawrenceburg Energy Company LLC as the original owner of the gas-fired combined-cycle facility."},{"event":"Construction began","date":"2001-05","detail":"Construction of the Lawrenceburg Merchant Energy Project began in May 2001."},{"event":"Construction completed","date":"2003-11","detail":"Construction was reported complete in late November 2003, followed by startup testing."},{"event":"Commercial operation","date":"2004-06","detail":"The facility began commercial operation in June 2004."},{"event":"AEP acquisition from PSEG affiliate","date":"2007-05-16","detail":"AEP Generating Company completed its approximately $325 million purchase of the Lawrenceburg Generating Station from an affiliate of Public Service Enterprise Group."},{"event":"AEP announced portfolio sale","date":"2016-09","detail":"AEP announced an approximately $2.17 billion agreement to sell four competitive plants, including Lawrenceburg, to a newly formed Blackstone–ArcLight joint venture."},{"event":"Lightstone acquisition from AEP","date":"2017-01-30","detail":"AEP completed the sale of the four-plant portfolio to Lightstone Generation for approximately $2.1 billion. Lawrenceburg was listed as one of the assets; no Lawrenceburg-only consideration was disclosed."},{"event":"Lightstone–Cornerstone purchase agreement","date":"2024-08-30","detail":"Lightstone affiliates and Cornerstone executed a Purchase and Sale Agreement under which Lightstone HoldCo agreed to sell 100% of its membership interest in Lawrenceburg Power to Cornerstone, subject to approvals and customary closing conditions."},{"event":"Indiana regulatory approval of Cornerstone transfer","date":"2025-03-19","detail":"The Indiana Utility Regulatory Commission approved the transfer of Lightstone's interest in Lawrenceburg Power and the related indirect transfer of the facility to Cornerstone."},{"event":"ECP acquisition of Cornerstone portfolio","date":"2025-07","detail":"ECP reported completing its acquisition of Cornerstone Generation, the portfolio containing Lawrenceburg, Waterford, and Darby."},{"event":"Talen definitive acquisition agreement","date":"2026-01-15","detail":"Talen Energy agreed to acquire ECP affiliates that indirectly owned Lawrenceburg, Waterford, and Darby for an announced purchase price of $3.45 billion."},{"event":"Acquisition financing issued","date":"2026-04","detail":"Talen Energy Supply issued $1.5 billion of 6.125% senior unsecured notes due 2031 and $2.5 billion of 6.375% senior unsecured notes due 2033; proceeds were intended primarily to fund the Cornerstone acquisition and partially redeem existing secured notes."},{"event":"Talen acquisition closed","date":"2026-06-15","detail":"Talen consummated the acquisition, making the Lawrenceburg-related acquired companies indirect wholly owned subsidiaries of Talen. The consideration consisted of approximately $2.55 billion cash and 2,399,998 Talen shares."}] — AEP completes purchase of Lawrenceburg Plant · confidence: medium
- Timeline: [{"event":"Original ownership approved","date":"2000-12-20","detail":"The Indiana Utility Regulatory Commission approved PSEG Lawrenceburg Energy Company LLC as the original owner of the gas-fired combined-cycle facility."},{"event":"Construction began","date":"2001-05","detail":"Construction of the Lawrenceburg Merchant Energy Project began in May 2001."},{"event":"Construction completed","date":"2003-11","detail":"Construction was reported complete in late November 2003, followed by startup testing."},{"event":"Commercial operation","date":"2004-06","detail":"The facility began commercial operation in June 2004."},{"event":"AEP acquisition from PSEG affiliate","date":"2007-05-16","detail":"AEP Generating Company completed its approximately $325 million purchase of the Lawrenceburg Generating Station from an affiliate of Public Service Enterprise Group."},{"event":"AEP announced portfolio sale","date":"2016-09","detail":"AEP announced an approximately $2.17 billion agreement to sell four competitive plants, including Lawrenceburg, to a newly formed Blackstone–ArcLight joint venture."},{"event":"Lightstone acquisition from AEP","date":"2017-01-30","detail":"AEP completed the sale of the four-plant portfolio to Lightstone Generation for approximately $2.1 billion. Lawrenceburg was listed as one of the assets; no Lawrenceburg-only consideration was disclosed."},{"event":"Lightstone–Cornerstone purchase agreement","date":"2024-08-30","detail":"Lightstone affiliates and Cornerstone executed a Purchase and Sale Agreement under which Lightstone HoldCo agreed to sell 100% of its membership interest in Lawrenceburg Power to Cornerstone, subject to approvals and customary closing conditions."},{"event":"Indiana regulatory approval of Cornerstone transfer","date":"2025-03-19","detail":"The Indiana Utility Regulatory Commission approved the transfer of Lightstone's interest in Lawrenceburg Power and the related indirect transfer of the facility to Cornerstone."},{"event":"ECP acquisition of Cornerstone portfolio","date":"2025-07","detail":"ECP reported completing its acquisition of Cornerstone Generation, the portfolio containing Lawrenceburg, Waterford, and Darby."},{"event":"Talen definitive acquisition agreement","date":"2026-01-15","detail":"Talen Energy agreed to acquire ECP affiliates that indirectly owned Lawrenceburg, Waterford, and Darby for an announced purchase price of $3.45 billion."},{"event":"Acquisition financing issued","date":"2026-04","detail":"Talen Energy Supply issued $1.5 billion of 6.125% senior unsecured notes due 2031 and $2.5 billion of 6.375% senior unsecured notes due 2033; proceeds were intended primarily to fund the Cornerstone acquisition and partially redeem existing secured notes."},{"event":"Talen acquisition closed","date":"2026-06-15","detail":"Talen consummated the acquisition, making the Lawrenceburg-related acquired companies indirect wholly owned subsidiaries of Talen. The consideration consisted of approximately $2.55 billion cash and 2,399,998 Talen shares."}] — AEP Completes Sale of Four Competitive Power Plants · confidence: medium
- Timeline: [{"event":"Original ownership approved","date":"2000-12-20","detail":"The Indiana Utility Regulatory Commission approved PSEG Lawrenceburg Energy Company LLC as the original owner of the gas-fired combined-cycle facility."},{"event":"Construction began","date":"2001-05","detail":"Construction of the Lawrenceburg Merchant Energy Project began in May 2001."},{"event":"Construction completed","date":"2003-11","detail":"Construction was reported complete in late November 2003, followed by startup testing."},{"event":"Commercial operation","date":"2004-06","detail":"The facility began commercial operation in June 2004."},{"event":"AEP acquisition from PSEG affiliate","date":"2007-05-16","detail":"AEP Generating Company completed its approximately $325 million purchase of the Lawrenceburg Generating Station from an affiliate of Public Service Enterprise Group."},{"event":"AEP announced portfolio sale","date":"2016-09","detail":"AEP announced an approximately $2.17 billion agreement to sell four competitive plants, including Lawrenceburg, to a newly formed Blackstone–ArcLight joint venture."},{"event":"Lightstone acquisition from AEP","date":"2017-01-30","detail":"AEP completed the sale of the four-plant portfolio to Lightstone Generation for approximately $2.1 billion. Lawrenceburg was listed as one of the assets; no Lawrenceburg-only consideration was disclosed."},{"event":"Lightstone–Cornerstone purchase agreement","date":"2024-08-30","detail":"Lightstone affiliates and Cornerstone executed a Purchase and Sale Agreement under which Lightstone HoldCo agreed to sell 100% of its membership interest in Lawrenceburg Power to Cornerstone, subject to approvals and customary closing conditions."},{"event":"Indiana regulatory approval of Cornerstone transfer","date":"2025-03-19","detail":"The Indiana Utility Regulatory Commission approved the transfer of Lightstone's interest in Lawrenceburg Power and the related indirect transfer of the facility to Cornerstone."},{"event":"ECP acquisition of Cornerstone portfolio","date":"2025-07","detail":"ECP reported completing its acquisition of Cornerstone Generation, the portfolio containing Lawrenceburg, Waterford, and Darby."},{"event":"Talen definitive acquisition agreement","date":"2026-01-15","detail":"Talen Energy agreed to acquire ECP affiliates that indirectly owned Lawrenceburg, Waterford, and Darby for an announced purchase price of $3.45 billion."},{"event":"Acquisition financing issued","date":"2026-04","detail":"Talen Energy Supply issued $1.5 billion of 6.125% senior unsecured notes due 2031 and $2.5 billion of 6.375% senior unsecured notes due 2033; proceeds were intended primarily to fund the Cornerstone acquisition and partially redeem existing secured notes."},{"event":"Talen acquisition closed","date":"2026-06-15","detail":"Talen consummated the acquisition, making the Lawrenceburg-related acquired companies indirect wholly owned subsidiaries of Talen. The consideration consisted of approximately $2.55 billion cash and 2,399,998 Talen shares."}] — Cornerstone Generation | Energy Capital Partners I ECP · confidence: medium
- Timeline: [{"event":"Original ownership approved","date":"2000-12-20","detail":"The Indiana Utility Regulatory Commission approved PSEG Lawrenceburg Energy Company LLC as the original owner of the gas-fired combined-cycle facility."},{"event":"Construction began","date":"2001-05","detail":"Construction of the Lawrenceburg Merchant Energy Project began in May 2001."},{"event":"Construction completed","date":"2003-11","detail":"Construction was reported complete in late November 2003, followed by startup testing."},{"event":"Commercial operation","date":"2004-06","detail":"The facility began commercial operation in June 2004."},{"event":"AEP acquisition from PSEG affiliate","date":"2007-05-16","detail":"AEP Generating Company completed its approximately $325 million purchase of the Lawrenceburg Generating Station from an affiliate of Public Service Enterprise Group."},{"event":"AEP announced portfolio sale","date":"2016-09","detail":"AEP announced an approximately $2.17 billion agreement to sell four competitive plants, including Lawrenceburg, to a newly formed Blackstone–ArcLight joint venture."},{"event":"Lightstone acquisition from AEP","date":"2017-01-30","detail":"AEP completed the sale of the four-plant portfolio to Lightstone Generation for approximately $2.1 billion. Lawrenceburg was listed as one of the assets; no Lawrenceburg-only consideration was disclosed."},{"event":"Lightstone–Cornerstone purchase agreement","date":"2024-08-30","detail":"Lightstone affiliates and Cornerstone executed a Purchase and Sale Agreement under which Lightstone HoldCo agreed to sell 100% of its membership interest in Lawrenceburg Power to Cornerstone, subject to approvals and customary closing conditions."},{"event":"Indiana regulatory approval of Cornerstone transfer","date":"2025-03-19","detail":"The Indiana Utility Regulatory Commission approved the transfer of Lightstone's interest in Lawrenceburg Power and the related indirect transfer of the facility to Cornerstone."},{"event":"ECP acquisition of Cornerstone portfolio","date":"2025-07","detail":"ECP reported completing its acquisition of Cornerstone Generation, the portfolio containing Lawrenceburg, Waterford, and Darby."},{"event":"Talen definitive acquisition agreement","date":"2026-01-15","detail":"Talen Energy agreed to acquire ECP affiliates that indirectly owned Lawrenceburg, Waterford, and Darby for an announced purchase price of $3.45 billion."},{"event":"Acquisition financing issued","date":"2026-04","detail":"Talen Energy Supply issued $1.5 billion of 6.125% senior unsecured notes due 2031 and $2.5 billion of 6.375% senior unsecured notes due 2033; proceeds were intended primarily to fund the Cornerstone acquisition and partially redeem existing secured notes."},{"event":"Talen acquisition closed","date":"2026-06-15","detail":"Talen consummated the acquisition, making the Lawrenceburg-related acquired companies indirect wholly owned subsidiaries of Talen. The consideration consisted of approximately $2.55 billion cash and 2,399,998 Talen shares."}] — tln-20260615 · confidence: medium
- Timeline: [{"event":"Original ownership approved","date":"2000-12-20","detail":"The Indiana Utility Regulatory Commission approved PSEG Lawrenceburg Energy Company LLC as the original owner of the gas-fired combined-cycle facility."},{"event":"Construction began","date":"2001-05","detail":"Construction of the Lawrenceburg Merchant Energy Project began in May 2001."},{"event":"Construction completed","date":"2003-11","detail":"Construction was reported complete in late November 2003, followed by startup testing."},{"event":"Commercial operation","date":"2004-06","detail":"The facility began commercial operation in June 2004."},{"event":"AEP acquisition from PSEG affiliate","date":"2007-05-16","detail":"AEP Generating Company completed its approximately $325 million purchase of the Lawrenceburg Generating Station from an affiliate of Public Service Enterprise Group."},{"event":"AEP announced portfolio sale","date":"2016-09","detail":"AEP announced an approximately $2.17 billion agreement to sell four competitive plants, including Lawrenceburg, to a newly formed Blackstone–ArcLight joint venture."},{"event":"Lightstone acquisition from AEP","date":"2017-01-30","detail":"AEP completed the sale of the four-plant portfolio to Lightstone Generation for approximately $2.1 billion. Lawrenceburg was listed as one of the assets; no Lawrenceburg-only consideration was disclosed."},{"event":"Lightstone–Cornerstone purchase agreement","date":"2024-08-30","detail":"Lightstone affiliates and Cornerstone executed a Purchase and Sale Agreement under which Lightstone HoldCo agreed to sell 100% of its membership interest in Lawrenceburg Power to Cornerstone, subject to approvals and customary closing conditions."},{"event":"Indiana regulatory approval of Cornerstone transfer","date":"2025-03-19","detail":"The Indiana Utility Regulatory Commission approved the transfer of Lightstone's interest in Lawrenceburg Power and the related indirect transfer of the facility to Cornerstone."},{"event":"ECP acquisition of Cornerstone portfolio","date":"2025-07","detail":"ECP reported completing its acquisition of Cornerstone Generation, the portfolio containing Lawrenceburg, Waterford, and Darby."},{"event":"Talen definitive acquisition agreement","date":"2026-01-15","detail":"Talen Energy agreed to acquire ECP affiliates that indirectly owned Lawrenceburg, Waterford, and Darby for an announced purchase price of $3.45 billion."},{"event":"Acquisition financing issued","date":"2026-04","detail":"Talen Energy Supply issued $1.5 billion of 6.125% senior unsecured notes due 2031 and $2.5 billion of 6.375% senior unsecured notes due 2033; proceeds were intended primarily to fund the Cornerstone acquisition and partially redeem existing secured notes."},{"event":"Talen acquisition closed","date":"2026-06-15","detail":"Talen consummated the acquisition, making the Lawrenceburg-related acquired companies indirect wholly owned subsidiaries of Talen. The consideration consisted of approximately $2.55 billion cash and 2,399,998 Talen shares."}] — Source · confidence: medium
- Commercial parties: [{"relationship":"Current indirect owner and parent company","name":"Talen Energy Corporation","detail":"Acquired the ECP-affiliated entities that indirectly owned Lawrenceburg Power in June 2026.","official_url":"https://www.talenenergy.com/"},{"relationship":"Plant legal and EIA utility entity","name":"Lawrenceburg Power, LLC","detail":"Indiana limited liability company associated with the plant and identified in EIA-linked inventory as the operator.","official_url":null},{"relationship":"Plant operator and operations-and-maintenance services provider","name":"Consolidated Asset Management Services (Indiana), LLC (CAMS)","detail":"Third-party operating personnel and operations services provider for the facility; the Indiana regulatory record states the same operating personnel were expected to continue through the ownership transfer.","official_url":"https://camstex.com/"},{"relationship":"Former owner and seller to Talen","name":"Energy Capital Partners","detail":"Ultimate owner of Cornerstone Generation before selling the Cornerstone portfolio to Talen in June 2026.","official_url":"https://www.ecpgp.com/"},{"relationship":"Former indirect owner/operator","name":"Cornerstone Generation","detail":"Acquired the Lawrenceburg Power interest from Lightstone-related entities and held the facility within its Ohio–Indiana natural-gas portfolio before the Talen transaction.","official_url":"https://www.ecpgp.com/equity/portfolio/cornerstone-generation"},{"relationship":"Former direct parent and owner","name":"Lightstone Generation LLC","detail":"Indirect owner of Lawrenceburg Power after AEP's January 2017 portfolio sale; its direct subsidiary, Lightstone HoldCo, agreed to sell 100% of Lawrenceburg Power to Cornerstone.","official_url":null},{"relationship":"Original owner and developer","name":"PSEG Lawrenceburg Energy Company LLC","detail":"Approved as the original owner in 2000 and associated with development and construction of the facility before its sale to AEP.","official_url":"https://www.pseg.com/"},{"relationship":"Former owner and operator","name":"AEP Generating Company","detail":"Purchased Lawrenceburg from a PSEG affiliate in May 2007 and sold it as part of AEP's four-plant Lightstone portfolio transaction, completed in January 2017.","official_url":"https://www.aep.com/"},{"relationship":"Engineering, procurement, and construction contractor","name":"Duke Fluor Daniel","detail":"Identified as the EPC contractor for the Lawrenceburg combined-cycle project; the construction record also refers to Duke/Fluor Daniel and Fluor Constructors Indiana.","official_url":null},{"relationship":"Gas-turbine supplier/OEM","name":"GE Power","detail":"Supplied the facility's four GE 7F.04 gas turbines according to the project profile.","official_url":null},{"relationship":"Heat-recovery steam-generator supplier","name":"John Cockerill Group","detail":"Identified in the project profile as the supplier of the steam boilers/heat-recovery equipment.","official_url":"https://johncockerill.com/"},{"relationship":"Former Lightstone joint-venture equity sponsor","name":"The Blackstone Group L.P.","detail":"Controlled funds holding a 50% interest in Lightstone according to the Indiana regulatory record.","official_url":"https://www.blackstone.com/"},{"relationship":"Former Lightstone joint-venture equity sponsor","name":"ArcLight Capital Partners LLC","detail":"Advised funds holding a 50% interest in Lightstone according to the Indiana regulatory record.","official_url":"https://www.arclight.com/"},{"relationship":"Historical power purchaser/offtaker","name":"Columbus Southern Power Company","detail":"The project profile reported a 10-year power purchase agreement under which Lawrenceburg's generated power was sold to Columbus Southern Power.","official_url":"https://www.aep.com/"},{"relationship":"Historical capacity hedge counterparty","name":"Indiana Michigan Power","detail":"Talen's acquisition materials stated that existing Lawrenceburg energy and capacity hedges included a bilateral sale of 837 MW of Lawrenceburg UCAP capacity to Indiana Michigan Utility for June 2028 through May 2034.","official_url":"https://www.indianamichiganpower.com/"}] — tln-20260615 · confidence: medium
- Commercial parties: [{"relationship":"Current indirect owner and parent company","name":"Talen Energy Corporation","detail":"Acquired the ECP-affiliated entities that indirectly owned Lawrenceburg Power in June 2026.","official_url":"https://www.talenenergy.com/"},{"relationship":"Plant legal and EIA utility entity","name":"Lawrenceburg Power, LLC","detail":"Indiana limited liability company associated with the plant and identified in EIA-linked inventory as the operator.","official_url":null},{"relationship":"Plant operator and operations-and-maintenance services provider","name":"Consolidated Asset Management Services (Indiana), LLC (CAMS)","detail":"Third-party operating personnel and operations services provider for the facility; the Indiana regulatory record states the same operating personnel were expected to continue through the ownership transfer.","official_url":"https://camstex.com/"},{"relationship":"Former owner and seller to Talen","name":"Energy Capital Partners","detail":"Ultimate owner of Cornerstone Generation before selling the Cornerstone portfolio to Talen in June 2026.","official_url":"https://www.ecpgp.com/"},{"relationship":"Former indirect owner/operator","name":"Cornerstone Generation","detail":"Acquired the Lawrenceburg Power interest from Lightstone-related entities and held the facility within its Ohio–Indiana natural-gas portfolio before the Talen transaction.","official_url":"https://www.ecpgp.com/equity/portfolio/cornerstone-generation"},{"relationship":"Former direct parent and owner","name":"Lightstone Generation LLC","detail":"Indirect owner of Lawrenceburg Power after AEP's January 2017 portfolio sale; its direct subsidiary, Lightstone HoldCo, agreed to sell 100% of Lawrenceburg Power to Cornerstone.","official_url":null},{"relationship":"Original owner and developer","name":"PSEG Lawrenceburg Energy Company LLC","detail":"Approved as the original owner in 2000 and associated with development and construction of the facility before its sale to AEP.","official_url":"https://www.pseg.com/"},{"relationship":"Former owner and operator","name":"AEP Generating Company","detail":"Purchased Lawrenceburg from a PSEG affiliate in May 2007 and sold it as part of AEP's four-plant Lightstone portfolio transaction, completed in January 2017.","official_url":"https://www.aep.com/"},{"relationship":"Engineering, procurement, and construction contractor","name":"Duke Fluor Daniel","detail":"Identified as the EPC contractor for the Lawrenceburg combined-cycle project; the construction record also refers to Duke/Fluor Daniel and Fluor Constructors Indiana.","official_url":null},{"relationship":"Gas-turbine supplier/OEM","name":"GE Power","detail":"Supplied the facility's four GE 7F.04 gas turbines according to the project profile.","official_url":null},{"relationship":"Heat-recovery steam-generator supplier","name":"John Cockerill Group","detail":"Identified in the project profile as the supplier of the steam boilers/heat-recovery equipment.","official_url":"https://johncockerill.com/"},{"relationship":"Former Lightstone joint-venture equity sponsor","name":"The Blackstone Group L.P.","detail":"Controlled funds holding a 50% interest in Lightstone according to the Indiana regulatory record.","official_url":"https://www.blackstone.com/"},{"relationship":"Former Lightstone joint-venture equity sponsor","name":"ArcLight Capital Partners LLC","detail":"Advised funds holding a 50% interest in Lightstone according to the Indiana regulatory record.","official_url":"https://www.arclight.com/"},{"relationship":"Historical power purchaser/offtaker","name":"Columbus Southern Power Company","detail":"The project profile reported a 10-year power purchase agreement under which Lawrenceburg's generated power was sold to Columbus Southern Power.","official_url":"https://www.aep.com/"},{"relationship":"Historical capacity hedge counterparty","name":"Indiana Michigan Power","detail":"Talen's acquisition materials stated that existing Lawrenceburg energy and capacity hedges included a bilateral sale of 837 MW of Lawrenceburg UCAP capacity to Indiana Michigan Utility for June 2028 through May 2034.","official_url":"https://www.indianamichiganpower.com/"}] — Source · confidence: medium
- Commercial parties: [{"relationship":"Current indirect owner and parent company","name":"Talen Energy Corporation","detail":"Acquired the ECP-affiliated entities that indirectly owned Lawrenceburg Power in June 2026.","official_url":"https://www.talenenergy.com/"},{"relationship":"Plant legal and EIA utility entity","name":"Lawrenceburg Power, LLC","detail":"Indiana limited liability company associated with the plant and identified in EIA-linked inventory as the operator.","official_url":null},{"relationship":"Plant operator and operations-and-maintenance services provider","name":"Consolidated Asset Management Services (Indiana), LLC (CAMS)","detail":"Third-party operating personnel and operations services provider for the facility; the Indiana regulatory record states the same operating personnel were expected to continue through the ownership transfer.","official_url":"https://camstex.com/"},{"relationship":"Former owner and seller to Talen","name":"Energy Capital Partners","detail":"Ultimate owner of Cornerstone Generation before selling the Cornerstone portfolio to Talen in June 2026.","official_url":"https://www.ecpgp.com/"},{"relationship":"Former indirect owner/operator","name":"Cornerstone Generation","detail":"Acquired the Lawrenceburg Power interest from Lightstone-related entities and held the facility within its Ohio–Indiana natural-gas portfolio before the Talen transaction.","official_url":"https://www.ecpgp.com/equity/portfolio/cornerstone-generation"},{"relationship":"Former direct parent and owner","name":"Lightstone Generation LLC","detail":"Indirect owner of Lawrenceburg Power after AEP's January 2017 portfolio sale; its direct subsidiary, Lightstone HoldCo, agreed to sell 100% of Lawrenceburg Power to Cornerstone.","official_url":null},{"relationship":"Original owner and developer","name":"PSEG Lawrenceburg Energy Company LLC","detail":"Approved as the original owner in 2000 and associated with development and construction of the facility before its sale to AEP.","official_url":"https://www.pseg.com/"},{"relationship":"Former owner and operator","name":"AEP Generating Company","detail":"Purchased Lawrenceburg from a PSEG affiliate in May 2007 and sold it as part of AEP's four-plant Lightstone portfolio transaction, completed in January 2017.","official_url":"https://www.aep.com/"},{"relationship":"Engineering, procurement, and construction contractor","name":"Duke Fluor Daniel","detail":"Identified as the EPC contractor for the Lawrenceburg combined-cycle project; the construction record also refers to Duke/Fluor Daniel and Fluor Constructors Indiana.","official_url":null},{"relationship":"Gas-turbine supplier/OEM","name":"GE Power","detail":"Supplied the facility's four GE 7F.04 gas turbines according to the project profile.","official_url":null},{"relationship":"Heat-recovery steam-generator supplier","name":"John Cockerill Group","detail":"Identified in the project profile as the supplier of the steam boilers/heat-recovery equipment.","official_url":"https://johncockerill.com/"},{"relationship":"Former Lightstone joint-venture equity sponsor","name":"The Blackstone Group L.P.","detail":"Controlled funds holding a 50% interest in Lightstone according to the Indiana regulatory record.","official_url":"https://www.blackstone.com/"},{"relationship":"Former Lightstone joint-venture equity sponsor","name":"ArcLight Capital Partners LLC","detail":"Advised funds holding a 50% interest in Lightstone according to the Indiana regulatory record.","official_url":"https://www.arclight.com/"},{"relationship":"Historical power purchaser/offtaker","name":"Columbus Southern Power Company","detail":"The project profile reported a 10-year power purchase agreement under which Lawrenceburg's generated power was sold to Columbus Southern Power.","official_url":"https://www.aep.com/"},{"relationship":"Historical capacity hedge counterparty","name":"Indiana Michigan Power","detail":"Talen's acquisition materials stated that existing Lawrenceburg energy and capacity hedges included a bilateral sale of 837 MW of Lawrenceburg UCAP capacity to Indiana Michigan Utility for June 2028 through May 2034.","official_url":"https://www.indianamichiganpower.com/"}] — Lawrenceburg Combined Cycle Power Plant, US · confidence: medium
- Commercial parties: [{"relationship":"Current indirect owner and parent company","name":"Talen Energy Corporation","detail":"Acquired the ECP-affiliated entities that indirectly owned Lawrenceburg Power in June 2026.","official_url":"https://www.talenenergy.com/"},{"relationship":"Plant legal and EIA utility entity","name":"Lawrenceburg Power, LLC","detail":"Indiana limited liability company associated with the plant and identified in EIA-linked inventory as the operator.","official_url":null},{"relationship":"Plant operator and operations-and-maintenance services provider","name":"Consolidated Asset Management Services (Indiana), LLC (CAMS)","detail":"Third-party operating personnel and operations services provider for the facility; the Indiana regulatory record states the same operating personnel were expected to continue through the ownership transfer.","official_url":"https://camstex.com/"},{"relationship":"Former owner and seller to Talen","name":"Energy Capital Partners","detail":"Ultimate owner of Cornerstone Generation before selling the Cornerstone portfolio to Talen in June 2026.","official_url":"https://www.ecpgp.com/"},{"relationship":"Former indirect owner/operator","name":"Cornerstone Generation","detail":"Acquired the Lawrenceburg Power interest from Lightstone-related entities and held the facility within its Ohio–Indiana natural-gas portfolio before the Talen transaction.","official_url":"https://www.ecpgp.com/equity/portfolio/cornerstone-generation"},{"relationship":"Former direct parent and owner","name":"Lightstone Generation LLC","detail":"Indirect owner of Lawrenceburg Power after AEP's January 2017 portfolio sale; its direct subsidiary, Lightstone HoldCo, agreed to sell 100% of Lawrenceburg Power to Cornerstone.","official_url":null},{"relationship":"Original owner and developer","name":"PSEG Lawrenceburg Energy Company LLC","detail":"Approved as the original owner in 2000 and associated with development and construction of the facility before its sale to AEP.","official_url":"https://www.pseg.com/"},{"relationship":"Former owner and operator","name":"AEP Generating Company","detail":"Purchased Lawrenceburg from a PSEG affiliate in May 2007 and sold it as part of AEP's four-plant Lightstone portfolio transaction, completed in January 2017.","official_url":"https://www.aep.com/"},{"relationship":"Engineering, procurement, and construction contractor","name":"Duke Fluor Daniel","detail":"Identified as the EPC contractor for the Lawrenceburg combined-cycle project; the construction record also refers to Duke/Fluor Daniel and Fluor Constructors Indiana.","official_url":null},{"relationship":"Gas-turbine supplier/OEM","name":"GE Power","detail":"Supplied the facility's four GE 7F.04 gas turbines according to the project profile.","official_url":null},{"relationship":"Heat-recovery steam-generator supplier","name":"John Cockerill Group","detail":"Identified in the project profile as the supplier of the steam boilers/heat-recovery equipment.","official_url":"https://johncockerill.com/"},{"relationship":"Former Lightstone joint-venture equity sponsor","name":"The Blackstone Group L.P.","detail":"Controlled funds holding a 50% interest in Lightstone according to the Indiana regulatory record.","official_url":"https://www.blackstone.com/"},{"relationship":"Former Lightstone joint-venture equity sponsor","name":"ArcLight Capital Partners LLC","detail":"Advised funds holding a 50% interest in Lightstone according to the Indiana regulatory record.","official_url":"https://www.arclight.com/"},{"relationship":"Historical power purchaser/offtaker","name":"Columbus Southern Power Company","detail":"The project profile reported a 10-year power purchase agreement under which Lawrenceburg's generated power was sold to Columbus Southern Power.","official_url":"https://www.aep.com/"},{"relationship":"Historical capacity hedge counterparty","name":"Indiana Michigan Power","detail":"Talen's acquisition materials stated that existing Lawrenceburg energy and capacity hedges included a bilateral sale of 837 MW of Lawrenceburg UCAP capacity to Indiana Michigan Utility for June 2028 through May 2034.","official_url":"https://www.indianamichiganpower.com/"}] — PSEG Power LLC Completes Construction of 1,150 Megawatt Indiana P... · confidence: medium
- Commercial parties.0: {"relationship":"Current indirect owner and parent company","name":"Talen Energy Corporation","detail":"Acquired the ECP-affiliated entities that indirectly owned Lawrenceburg Power in June 2026.","official_url":"https://www.talenenergy.com/"} — tln-20260615 · confidence: medium
- Commercial parties.0: {"relationship":"Current indirect owner and parent company","name":"Talen Energy Corporation","detail":"Acquired the ECP-affiliated entities that indirectly owned Lawrenceburg Power in June 2026.","official_url":"https://www.talenenergy.com/"} — Lawrenceburg Power Plant - Talen Energy · confidence: medium
- Commercial parties.2: {"relationship":"Plant operator and operations-and-maintenance services provider","name":"Consolidated Asset Management Services (Indiana), LLC (CAMS)","detail":"Third-party operating personnel and operations services provider for the facility; the Indiana regulatory record states the same operating personnel were expected to continue through the ownership transfer.","official_url":"https://camstex.com/"} — Source · confidence: medium
- Commercial parties.3: {"relationship":"Former owner and seller to Talen","name":"Energy Capital Partners","detail":"Ultimate owner of Cornerstone Generation before selling the Cornerstone portfolio to Talen in June 2026.","official_url":"https://www.ecpgp.com/"} — tln-20260615 · confidence: medium
- Commercial parties.3: {"relationship":"Former owner and seller to Talen","name":"Energy Capital Partners","detail":"Ultimate owner of Cornerstone Generation before selling the Cornerstone portfolio to Talen in June 2026.","official_url":"https://www.ecpgp.com/"} — Energy Capital Partners (ECP) Agrees to Sell Cornerstone to Talen Energy | Energy Capital Partners I ECP · confidence: medium
- Commercial parties.4: {"relationship":"Former indirect owner/operator","name":"Cornerstone Generation","detail":"Acquired the Lawrenceburg Power interest from Lightstone-related entities and held the facility within its Ohio–Indiana natural-gas portfolio before the Talen transaction.","official_url":"https://www.ecpgp.com/equity/portfolio/cornerstone-generation"} — Source · confidence: medium
- Commercial parties.4: {"relationship":"Former indirect owner/operator","name":"Cornerstone Generation","detail":"Acquired the Lawrenceburg Power interest from Lightstone-related entities and held the facility within its Ohio–Indiana natural-gas portfolio before the Talen transaction.","official_url":"https://www.ecpgp.com/equity/portfolio/cornerstone-generation"} — Cornerstone Generation | Energy Capital Partners I ECP · confidence: medium
- Commercial parties.5: {"relationship":"Former direct parent and owner","name":"Lightstone Generation LLC","detail":"Indirect owner of Lawrenceburg Power after AEP's January 2017 portfolio sale; its direct subsidiary, Lightstone HoldCo, agreed to sell 100% of Lawrenceburg Power to Cornerstone.","official_url":null} — Source · confidence: medium
- Commercial parties.6: {"relationship":"Original owner and developer","name":"PSEG Lawrenceburg Energy Company LLC","detail":"Approved as the original owner in 2000 and associated with development and construction of the facility before its sale to AEP.","official_url":"https://www.pseg.com/"} — Source · confidence: medium
- Commercial parties.7: {"relationship":"Former owner and operator","name":"AEP Generating Company","detail":"Purchased Lawrenceburg from a PSEG affiliate in May 2007 and sold it as part of AEP's four-plant Lightstone portfolio transaction, completed in January 2017.","official_url":"https://www.aep.com/"} — AEP completes purchase of Lawrenceburg Plant · confidence: medium
- Commercial parties.7: {"relationship":"Former owner and operator","name":"AEP Generating Company","detail":"Purchased Lawrenceburg from a PSEG affiliate in May 2007 and sold it as part of AEP's four-plant Lightstone portfolio transaction, completed in January 2017.","official_url":"https://www.aep.com/"} — AEP Completes Sale of Four Competitive Power Plants · confidence: medium
- Commercial parties.8: {"relationship":"Engineering, procurement, and construction contractor","name":"Duke Fluor Daniel","detail":"Identified as the EPC contractor for the Lawrenceburg combined-cycle project; the construction record also refers to Duke/Fluor Daniel and Fluor Constructors Indiana.","official_url":null} — PSEG Power LLC Completes Construction of 1,150 Megawatt Indiana P... · confidence: medium
- Commercial parties.8: {"relationship":"Engineering, procurement, and construction contractor","name":"Duke Fluor Daniel","detail":"Identified as the EPC contractor for the Lawrenceburg combined-cycle project; the construction record also refers to Duke/Fluor Daniel and Fluor Constructors Indiana.","official_url":null} — PSEG Lawrenceburg Energy Power Station - Integrated Construction Solutions | Baker Construction Baker's Project Portfolio · confidence: medium
- Commercial parties.9: {"relationship":"Gas-turbine supplier/OEM","name":"GE Power","detail":"Supplied the facility's four GE 7F.04 gas turbines according to the project profile.","official_url":null} — PSEG Power LLC Completes Construction of 1,150 Megawatt Indiana P... · confidence: medium
- Commercial parties.9: {"relationship":"Gas-turbine supplier/OEM","name":"GE Power","detail":"Supplied the facility's four GE 7F.04 gas turbines according to the project profile.","official_url":null} — Lawrenceburg Combined Cycle Power Plant, US · confidence: medium
- Commercial parties.10: {"relationship":"Heat-recovery steam-generator supplier","name":"John Cockerill Group","detail":"Identified in the project profile as the supplier of the steam boilers/heat-recovery equipment.","official_url":"https://johncockerill.com/"} — Lawrenceburg Combined Cycle Power Plant, US · confidence: medium
- Commercial parties.11: {"relationship":"Former Lightstone joint-venture equity sponsor","name":"The Blackstone Group L.P.","detail":"Controlled funds holding a 50% interest in Lightstone according to the Indiana regulatory record.","official_url":"https://www.blackstone.com/"} — Source · confidence: medium
- Commercial parties.12: {"relationship":"Former Lightstone joint-venture equity sponsor","name":"ArcLight Capital Partners LLC","detail":"Advised funds holding a 50% interest in Lightstone according to the Indiana regulatory record.","official_url":"https://www.arclight.com/"} — Source · confidence: medium

## Timeline

- 2000-12-20 — Original ownership approved
  The Indiana Utility Regulatory Commission approved PSEG Lawrenceburg Energy Company LLC as the original owner of the gas-fired combined-cycle facility.
  Source: Source (https://in.gov/iurc/files/ord_46133_031925.pdf)
- 2001-05 — Construction began
  Construction of the Lawrenceburg Merchant Energy Project began in May 2001.
  Source: PSEG Power LLC Completes Construction of 1,150 Megawatt Indiana P... (https://www.industrialinfo.com/news/article/pseg-power-llc-completes-construction-of-1150-megawatt-indiana-power-plant--37952)
- 2003-11 — Construction completed
  Construction was reported complete in late November 2003, followed by startup testing.
  Source: PSEG Power LLC Completes Construction of 1,150 Megawatt Indiana P... (https://www.industrialinfo.com/news/article/pseg-power-llc-completes-construction-of-1150-megawatt-indiana-power-plant--37952)
- 2004-06 — Commercial operation
  The facility began commercial operation in June 2004.
  Source: AEP completes purchase of Lawrenceburg Plant (https://www.swepco.com/company/news/view?releaseID=921)
- 2007-05-16 — AEP acquisition from PSEG affiliate
  AEP Generating Company completed its approximately $325 million purchase of the Lawrenceburg Generating Station from an affiliate of Public Service Enterprise Group.
  Source: AEP completes purchase of Lawrenceburg Plant (https://www.swepco.com/company/news/view?releaseID=921)
- 2025-03-19 — Indiana regulatory approval of Cornerstone transfer
  The Indiana Utility Regulatory Commission approved the transfer of Lightstone's interest in Lawrenceburg Power and the related indirect transfer of the facility to Cornerstone.
  Source: Source (https://in.gov/iurc/files/ord_46133_031925.pdf)
- 2026-01-15 — Talen definitive acquisition agreement
  Talen Energy agreed to acquire ECP affiliates that indirectly owned Lawrenceburg, Waterford, and Darby for an announced purchase price of $3.45 billion.
  Source: tln-20260615 (https://www.sec.gov/Archives/edgar/data/1622536/000162253626000048/tln-20260615.htm)
- 2026-04 — Acquisition financing issued
  Talen Energy Supply issued $1.5 billion of 6.125% senior unsecured notes due 2031 and $2.5 billion of 6.375% senior unsecured notes due 2033; proceeds were intended primarily to fund the Cornerstone acquisition and partially redeem existing secured notes.
  Source: Source (https://www.sec.gov/Archives/edgar/data/1622536/000162253626000035/a20260505q12026earningsrel.htm)
- 2026-06-15 — Talen acquisition closed
  Talen consummated the acquisition, making the Lawrenceburg-related acquired companies indirect wholly owned subsidiaries of Talen. The consideration consisted of approximately $2.55 billion cash and 2,399,998 Talen shares.
  Source: tln-20260615 (https://www.sec.gov/Archives/edgar/data/1622536/000162253626000048/tln-20260615.htm)

## Sources

- [Talen Energy: Homepage](https://www.talenenergy.com/) — talenenergy.com · tier other
- [Lawrenceburg Power, LLC; Supplemental Notice That Initial ...](https://www.federalregister.gov/documents/2016/11/18/2016-27815/lawrenceburg-power-llc-supplemental-notice-that-initial-market-based-rate-filing-includes-request) — federalregister.gov · tier regulatory
- [Lawrenceburg Power Plant - Talen Energy](https://www.talenenergy.com/plant/lawrenceburg-power-plant/) — talenenergy.com · tier other
- [tln-20260615](https://www.sec.gov/Archives/edgar/data/1622536/000162253626000048/tln-20260615.htm) — sec.gov · tier regulatory
- [Source](https://www.in.gov/iurc/files/ord_46133_031925.pdf) — in.gov · tier regulatory
- [Lawrenceburg Combined Cycle Power Plant, US](https://www.power-technology.com/marketdata/lawrenceburg-combined-cycle-power-plant-us/) — power-technology.com · tier other
- [Indiana Commission Okays AEP Sale of 1,096-MW Lawrenceburg Plant](https://www.power-eng.com/business/indiana-commission-okays-aep-sale-of-1-096-mw-lawrenceburg-plant/) — power-eng.com · tier other
- [Source](https://www.ferc.gov/sites/default/files/2020-09/09-2020-E-25.pdf) — ferc.gov · tier regulatory
- [PSEG Lawrenceburg Energy Power Station - Integrated Construction Solutions | Baker Construction Baker's Project Portfolio](https://bakerconstruction.com/project/pseg-lawrenceburg-energy-power-station/) — bakerconstruction.com · tier other
- [7F Heavy Duty Gas Turbine | 7F.04/7F.05 | GE Vernova](https://www.gevernova.com/gas-power/products/gas-turbines/7f) — gevernova.com · tier other
- [Steam Turbine Power Plant Solutions | GE Vernova](https://www.gevernova.com/gas-power/products/steam-turbines) — gevernova.com · tier other
- [PSEG Power LLC Completes Construction of 1,150 Megawatt Indiana P...](https://www.industrialinfo.com/news/article/pseg-power-llc-completes-construction-of-1150-megawatt-indiana-power-plant--37952) — industrialinfo.com · tier other
- [AEP Completes Sale of Four Competitive Power Plants](https://www.prnewswire.com/news-releases/aep-completes-sale-of-four-competitive-power-plants-300398721.html) — prnewswire.com · tier other
- [AEP completes purchase of Lawrenceburg Plant](https://www.swepco.com/company/news/view?releaseID=921) — swepco.com · tier other
- [Source](https://www.sec.gov/Archives/edgar/data/1622536/000162253626000035/a20260505q12026earningsrel.htm) — sec.gov · tier regulatory
- [Source](https://in.gov/iurc/files/ord_46133_031925.pdf) — in.gov · tier regulatory
- [Cornerstone Generation | Energy Capital Partners I ECP](https://www.ecpgp.com/equity/portfolio/cornerstone-generation) — ecpgp.com · tier other
- [Energy Capital Partners (ECP) Agrees to Sell Cornerstone to Talen Energy | Energy Capital Partners I ECP](https://www.ecpgp.com/about/news-and-insights/press-releases/2026/-energy-capital-partners--ecp--agrees-to-sell-additional-high-qu) — ecpgp.com · tier other
- [Form 8-K for Talen Energy Corp filed 01/15/2026](https://ir.talenenergy.com/static-files/3cdf1abe-1b44-4aa3-bce6-931e18ee76cc) — ir.talenenergy.com · tier other
- [PSEG closes on sale of Lawrenceburg Energy Center to AEP Generating Co.](https://www.power-eng.com/gas/combined-cycle/pseg-closes-on-sale-of-lawrenceburg-energy-center-to-aep-generating-co/) — power-eng.com · tier other
- [Talen Energy Reports First Quarter 2026 Results, Reaffirms 2026 Guidance | Tue, 05/05/2026 - 16:05](https://ir.talenenergy.com/news-releases/news-release-details/talen-energy-reports-first-quarter-2026-results-reaffirms-2026/) — ir.talenenergy.com · tier other
- [Source](https://ir.talenenergy.com/static-files/03862d3b-af12-46f0-b786-3ecd60354599) — ir.talenenergy.com · tier other

## Data quality

- Capacity figures vary by rating and source: EIA-linked inventory reports 1,232 MW nameplate capacity, 1,206.7 MW summer capacity, and 1,288 MW winter capacity; Talen reports 1,120 MW of owned generating capacity; historical transaction sources report ratings ranging from 1,096 MW to 1,186 MW. These figures appear to reflect different rating conventions rather than different facilities. Talen describes the configuration as four gas turbines and two steam turbines, while the EIA-linked inventory counts six generators. The generator count is reported from the source and is not inferred from capacity. The reviewed exact-plant sources document no expansion, repowering, or retirement milestone; the facility is reported as operational. The 2017 $2.1 billion figure was consideration for a four-plant portfolio, and the 2026 $3.45 billion figure was consideration for a three-asset portfolio, not Lawrenceburg-only sale consideration.

---