# Lincoln Land Wind

MISO asset profile · https://askthegrid.com/assets/facilities/lincoln-land-wind

## Current generation inventory

EIA plant 58925 · Inventory reporting month: 2026-08.

- wind: 302 MW operating nameplate
- Capacity basis: operating_generator_nameplate_mw
- Source inventory: [EIA-860M workbook (preliminary)](https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx)
- Inventory retrieved: 2026-10-10T02:12:40.665346+00:00
- Filed coordinate (longitude, latitude): -89.95583, 39.821944
- OSM extract: 2026-10-08T20:21:06Z
- OSM mapped edit: 2023-11-20 21:17:13+00:00
- Map prepared: 2026-10-10T02:28:18.252105+00:00

Battery power (MW) and stored energy (MWh) are separate measures. Shared physical-site membership does not establish electrical connectivity, settlement or a common export limit.

## Reviewed overview

Lincoln Land Wind is a 302 MW onshore wind turbine plant in Sangamon County. It uses 107 GE 2.82-127 turbines under a 20-year GE O&M agreement and was built by IEA subsidiary White Construction.

## Reviewed metrics

- **Nameplate capacity:** 302 MW — Canonical EIA plant baseline.
- **Registry anchor:** Plant 58925 — plant-58925

## Facts

- **Technology:** Onshore Wind Turbine
- **Operator:** Lincoln Land Wind, LLC

## Related parties

- **EPC contractor:** IEA — epc_contractor ([source](https://www.iea.net))

## Sources

- [windpowerengineering.com](https://www.windpowerengineering.com/iea-contracted-for-construction-of-300-mw-illinois-wind-project/) — windpowerengineering.com · public_source — Source retained for exact-record publication review.

---

Canonical page: https://askthegrid.com/assets/facilities/lincoln-land-wind
Website: [Ares Management Corporation](https://www.aresmgmt.com)

Source: Ask the Grid — https://askthegrid.com/
