# Longhorn Wind

ERCOT asset profile · https://askthegrid.com/assets/facilities/longhorn-wind

Briscoe County · ERCOT

Longhorn Wind is a wind power facility with 200 MW of EIA-reported operating capacity in Floyd and Briscoe Counties, Texas, registered as EIA Plant ID 58772.

## Profile

- **Grid role:** Utility-scale wind generation in ERCOT's energy-only market.

## Metrics

- **Reported capacity:** 200 MW — EIA-reported operating capacity; nameplate, seasonal, AC/DC, and unit ratings may differ.
- **Technology:** Onshore Wind Turbine — Primary generation technology.
- **Registry anchor:** Plant 58772 — Briscoe County · ERCOT
- **Operating status:** Operating — Longhorn Wind is operating.
- **Resource stack:** 2 resources — LHORN_N_UNIT1 · LHORN_N_UNIT2

## Facts

- **Reported capacity:** 200 MW — Onshore Wind Turbine · confidence: high
- **Operating status:** operating — Longhorn Wind is operating. · confidence: medium
- **Asset role:** wind — ERCOT · Briscoe County
- **Owner:** Boralex (50% interest) — Together these support Boralex as a public owner (50% interest). · confidence: medium

## Sources

- [Schedule 2, 'Plant Data'](https://downloads.regulations.gov/OSHA-H005C-2006-0870-0430/attachment_2.pdf) — downloads.regulations.gov · regulatory — 58772 Longhorn Wind Silverton TX #### Briscoe.
- [Summary](https://www.ercot.com/files/docs/2018/10/11/06._2018_October_ROS_ModelStatusSummary_Update.xlsx) — ercot.com · regulatory — Oct 11, 2018 — LHORN_N_UNIT1 & LHORN_N_UNIT2 32 Panhandle 14INR0053 Spinning Spur Wind Three Lacks Significant Efficiency
- [Stand Alone Generation Resources as of 09.01.25 v2](https://www.ercot.com/files/docs/2025/09/02/Stand-Alone-Generation-Resources-as-of-09.01.25-v2.pdf) — ercot.com · regulatory — LHORN_N_UNIT1 LHORN_N LONGHORN WIND PROJECT Wind 100
- [RES Americas to Construct 200MW Project](https://www.edf-re.com/press-release/edf-renewable-energy-acquires-longhorn-north-wind-project-res-americas-construct-200mw-project/) — edf-re.com · other — EDF Renewables announces it has acquired the Longhorn North Wind Project … is expected to be completed at the end of 2015

---

Canonical page: https://askthegrid.com/assets/facilities/longhorn-wind

Profile published: 2026-07-17T03:34:30.899Z
Source: Ask the Grid — https://askthegrid.com/
