# Lowe's Data Center

ERCOT data center · https://askthegrid.com/assets/facilities/lowe-s-data-center

Lowe's owns and operates a data center at 10045 Rogers Run in San Antonio, originally announced in June 2006 at approximately $60 million and opened in 2007, with an expansion completed in May 2012; the facility is fully operational. Current reported utility capacity is 5 MW; a separate UPS modernization project was registered with a scheduled completion date of July 31, 2026.

## Identity and location

- Operating status: operating
- Asset scope: facility
- Location: 10045 Rogers Run, San Antonio, Bexar County, TX
- Owner: LOWE'S (exact asset) — https://corporate.lowes.com
- Operator: LOWE'S (exact asset) — https://corporate.lowes.com
- Developer: LOWE'S (exact asset) — https://corporate.lowes.com

## Power and grid context

- Utility service: 5 MW · reported · exact asset · as of 2026-07-27 — Reported power capacity for the operational Lowe's Data Center exact asset; this is not identified as requested, contracted, approved, energized, critical IT, onsite-generation, backup-generation, or battery-storage capacity.
- ISO/RTO: ERCOT
- Balancing authority: ERCOT
- Electric utility: Karnes Electric COOP INC
- Point of interconnection: Karnes Electric COOP INC power grid; specific substation and POI name not identified

## Development

- Site status: Operating Lowe's data-center facility; a separate UPS modernization project at the same address was registered and had a scheduled completion date of July 31, 2026.
- Construction: Lowe's announced a new San Antonio data center on June 29, 2006, with an approximately $60 million investment and an expected mid-2007 operational date. Reputable local reporting states Lowe's opened its Westover Hills facility in 2007. A separately documented expansion at 10045 Rogers Run was registered with TDLR on June 6, 2011, scheduled to start July 1, 2011, and scheduled for completion May 1, 2012; it is reported as operational from May 1, 2012. A later UPS modernization project at the same address was registered October 29, 2024, with a scheduled construction start of January 2, 2025 and scheduled completion July 31, 2026. The modernization record describes electrical, mechanical, architectural, and fire-protection modifications affecting 10,418 square feet, but does not establish total facility floor area.

## Compute and operations

- Facility classes: enterprise
- Operating context: Operational Lowe's-owned, Lowe's-operated, and Lowe's-developed enterprise data-center facility in San Antonio. A reported site power capacity of 5.0 MW is available, but critical IT load is not disclosed.

## Sources

- [http://datacenter.fyi/public-record/lowe-s-data-center-expansion-551e87d5](http://datacenter.fyi/public-record/lowe-s-data-center-expansion-551e87d5)
- [http://dchub.cloud/facility/1265](http://dchub.cloud/facility/1265)
- [Data-center operators are finding San Antonio has the right ...](http://www.bizjournals.com/sanantonio/print-edition/2014/02/28/data-center-operators-are-finding-san-antonio-has.html)
- [Our Path to Net Zero | Lowe’s Corporate](https://corporate.lowes.com/net-zero)
- [Fetched web page](https://corporate.lowes.com/sites/lowes-corp/files/2025-07/2024%20Reports/Lowes_2024_CRR_6.30.25.pdf)
- [Our Locations | Lowe’s Corporate](https://corporate.lowes.com/who-we-are/our-locations)
- [description: Lowe's Data Center is a data center in San Antonio, TX, US. Power capacity: 5.0 MW. View specs, location, power & connectivity on DC Hub. title: Lowe's Data Center — Data Center](https://dchub.cloud/facilities/lowe-s-lowe-s-data-center-bc43b817)
- [description: Lowe's Data Center is a data center in San Antonio, TX, US. Power capacity: 5.0 MW. View specs, location, power & connectivity on DC Hub. title: Lowe's Data Center — Data Center](https://dchub.cloud/facility/1265)
- [ERCOT: Everything You Need To Know | ElectricityRates.com](https://electricityrates.com/texas/ercot)
- [Permit EABPRJB1813135 — San Antonio, TX | MLQ Infrastructure](https://mlq.ai/permit-filings/usa/texas/san-antonio/eabprjb1813135/)
- [Fetched web page](https://webapp1.sanantonio.gov/archivedagendas/CC02011/7z89601%21.pdf)
- [Fetched web page](https://webapp1.sanantonio.gov/archivedagendas/CC02011/7z8g01%21.pdf)
- [Fetched web page](https://webapp1.sanantonio.gov/archivedagendas/CC02011/7z8h01%21.pdf)
- [Fetched web page](https://webapp1.sanantonio.gov/archivedagendas/docsguest/7ysc01%21.PDF)
- [Fetched web page](https://webapp9.sanantonio.gov/FileNetArchive/%7BCFDDDB4F-1A74-4B8F-B5F1-52F2B3886F01%7D/%7BCFDDDB4F-1A74-4B8F-B5F1-52F2B3886F01%7D.pdf)
- [Microsoft expanding its data base in San Antonio](https://www.bizjournals.com/sanantonio/blog/2014/03/microsoft-expanding-its-data-base-in-san-antonio.html)
- [LOWE'S DATA CENTER EXPANSION - San Antonio, TX | datacenter.fyi](https://www.datacenter.fyi/public-record/lowe-s-data-center-expansion-551e87d5)
- [Lowe's UPS Modernization - San Antonio, TX | datacenter.fyi](https://www.datacenter.fyi/public-record/lowe-s-ups-modernization-b4fb53a6)
- [Texas Data Center Facilities, Permits & Public Records](https://www.datacenter.fyi/state/tx)
- [San Antonio, Texas Data Center Permits & Public Records | datacenter.fyi](https://www.datacenter.fyi/state/tx/san-antonio)
- [San Antonio might land Lowe's data center - DCD](https://www.datacenterdynamics.com/en/news/san-antonio-might-land-lowes-data-center/) — DatacenterDynamics · 2006-11-04
- [Lowe's Chooses San Antonio for Data Center](https://www.datacenterknowledge.com/business/lowe-s-chooses-san-antonio-for-data-center) — Data Center Knowledge · 2006-06-29
- [description: Lowe's Data Center is a data center in San Antonio, TX, US. Power capacity: 5.0 MW. View specs, location, power & connectivity on DC Hub. title: Lowe's Data Center — Data Center](https://www.dchub.cloud/facility/1265)
- [Lowe’s lawsuit could cost San Antonio more than $270 million in next 5 years](https://www.expressnews.com/business/local/article/Lowe-s-lawsuit-could-cost-San-Antonio-more-than-10421104.php)
- [Lowe's To Open New Texas Data Center](https://www.floordaily.net/flooring-news/lowe39s-to-open-new-texas-data-center/)
- [Judge Tosses Rogers County Grand Jury Petition](https://www.kgou.org/politics-and-government/2013-10-16/judge-tosses-rogers-county-grand-jury-petition)
- [Stream Data Centers Completes Sale of San Antonio Data Center to Fortune 100 Corporation](https://www.prnewswire.com/news-releases/stream-data-centers-completes-sale-of-san-antonio-data-center-to-fortune-100-corporation-126174968.html)
- [Air Permits - Texas Commission on Environmental Quality - www.tceq.texas.gov](https://www.tceq.texas.gov/permitting/air)
- [TDLR TABS - Project Details](https://www.tdlr.texas.gov/TABS/Projects/TABS2025004352)
- [Project Details](https://www.tdlr.texas.gov/TABS/Search/Print/EABPRJB1813135)
- [LOWE’S SAN ANTONIO DATA CTR - Updated September 2025 - 10045 Rogers Run, San Antonio, Texas - Phone Number - Yelp](https://www.yelp.com/biz/lowes-san-antonio-data-ctr-san-antonio)
- [Lowe's UPS Modernization | San Antonio, TX | Renovation/Alteration | Zabalist | Zabalist](https://www.zabalist.com/projects/TABS2025004352)

## Data quality

- The exact project is identified in City records as the Lowe’s Data Center on an approximately 10-acre Westover Hills tract bounded by State Highway 151, Chase Bank, First Health, Hartford Insurance, and the proposed Rogers Run Road cul-de-sac.
- The City’s approval documents describe $126 million in improvements and $200 million in total investment over 20 years; contemporaneous trade coverage contains preliminary estimates that differ from those final municipal figures.
- The benefits are approval-era projections, not independently verified current operating outcomes. No unsupported claims are made about water use, PUE, WUE, tenants, equipment, building count, or commercial terms.
- Removed uncited provider news result: Tax Phase-In Agreement with Lowe's Home Centers, Inc.
- Power values retain their reported, requested, contracted, energized, gross-campus, or critical-IT basis.

---

Canonical page: https://askthegrid.com/assets/facilities/lowe-s-data-center
Profile generated: 2026-07-27T23:45:45.998433Z
Source: Ask the Grid — https://askthegrid.com/
