# Lower Snake River Wind Energy Project

BPA asset profile · https://askthegrid.com/assets/facilities/lower-snake-river-wind-energy-project

Puget Sound Energy Inc - Garfield County - BPAT

Lower Snake River Wind Energy Project is a 342.7 MW onshore wind turbine plant in Garfield County. Lower Snake River Wind Facility is a 342.7 MW wind farm near Pomeroy in Garfield County, Washington, owned and operated by Puget Sound Energy. Its 149 Siemens turbines, each rated at 2.3 MW, were built from spring 2010 with RES Americas, PSE's original development partner. The farm went into commercial operation in late February 2012 at a development and construction cost of $830 million, and was then the largest wind farm in Washington.

## Metrics

- **Nameplate capacity:** 342.7 MW — Canonical EIA plant baseline.
- **Registry anchor:** Plant 57195 — plant-57195

## Facts

- **Technology:** Onshore Wind Turbine
- **Operator:** Puget Sound Energy Inc

## Related parties

- **O&M provider / equipment supplier:** Siemens Energy — equipment_supplier

## Sources

- [altenerg.com](https://www.altenerg.com/back_issues/novdec2012-story4.htm) — altenerg.com · public_source — Source retained for exact-record publication review.
- [waitsburgtimes.com](https://www.waitsburgtimes.com/story/2010/08/26/business-news/pse-purchases-land-in-pomeroy/5084.html) — waitsburgtimes.com · public_source — Source retained for exact-record publication review.

---

Canonical page: https://askthegrid.com/assets/facilities/lower-snake-river-wind-energy-project

Source: Ask the Grid — https://askthegrid.com/
