# Marshall Ford

ERCOT Conventional Hydroelectric · https://askthegrid.com/assets/facilities/marshall-ford

Marshall Ford is a hydroelectric facility with 108 MW of EIA-reported operating capacity in Travis County, Texas, registered as EIA Plant ID 3600. Lower Colorado River Authority owns and operates the plant. Marshall Ford is historically notable because its first hydroelectric unit entered operation on January 27, 1941, about 16 months before the high dam was completed in May 1942. Bureau of Reclamation on May 30, 1997.

## Key facts

- Technology: Conventional Hydroelectric
- Power capacity: 108 MW
- Operating status: operating

## Grid and market context

- ISO/RTO: ERCOT
- Balancing authority: ERCOT
- Settlement node: HV_BESS1_RN
- Interconnection voltage: 138 kV
- Market resources: HV_ESR1, MARSFO_MARSFOG1, MARSFO_MARSFOG2, MARSFO_MARSFOG3

## Source-backed facts

- Owner logo domain: lcra.org — LCRA - Lower Colorado River Authority - Energy, Water... · confidence: medium
- Identifiers: [{"value":"3600","system":"EIA plant code"},{"value":"1","system":"EIA generator ID"},{"value":"2","system":"EIA generator ID"},{"value":"3","system":"EIA generator ID"},{"value":"ERCOT","system":"ISO/RTO"},{"value":"MARSFO","system":"ERCOT market resource"},{"value":"MARSFO_MARSFOG1","system":"ERCOT unit code"},{"value":"MARSFO_MARSFOG2","system":"ERCOT unit code"},{"value":"MARSFO_MARSFOG3","system":"ERCOT unit code"}] — MBR | Index · confidence: medium
- Identifiers: [{"value":"3600","system":"EIA plant code"},{"value":"1","system":"EIA generator ID"},{"value":"2","system":"EIA generator ID"},{"value":"3","system":"EIA generator ID"},{"value":"ERCOT","system":"ISO/RTO"},{"value":"MARSFO","system":"ERCOT market resource"},{"value":"MARSFO_MARSFOG1","system":"ERCOT unit code"},{"value":"MARSFO_MARSFOG2","system":"ERCOT unit code"},{"value":"MARSFO_MARSFOG3","system":"ERCOT unit code"}] — Source · confidence: medium
- Identifiers: [{"value":"3600","system":"EIA plant code"},{"value":"1","system":"EIA generator ID"},{"value":"2","system":"EIA generator ID"},{"value":"3","system":"EIA generator ID"},{"value":"ERCOT","system":"ISO/RTO"},{"value":"MARSFO","system":"ERCOT market resource"},{"value":"MARSFO_MARSFOG1","system":"ERCOT unit code"},{"value":"MARSFO_MARSFOG2","system":"ERCOT unit code"},{"value":"MARSFO_MARSFOG3","system":"ERCOT unit code"}] — Source · confidence: medium
- Official project url: https://www.lcra.org/energy/electric-power/facilities/ — Facilities - LCRA - Energy, Water, Community · confidence: high
- Owner name: Lower Colorado River Authority — MANSFIELD (MARSHALL FORD) DAM AND LAKE TRAVIS · confidence: high
- Owner name: Lower Colorado River Authority — MBR | Index · confidence: high
- Description: Marshall Ford is a 108 MW hydroelectric generating facility associated with Mansfield Dam on Lake Travis in Texas. The EIA/FERC registry lists plant code 3600 under the Lower Colorado River Authority in Travis County, with three 36 MW generator units. ERCOT identifies the three units under the MARSFO market resource, and LCRA lists Mansfield Dam as completed in 1941 with hydroelectric generation. — Facilities - LCRA - Energy, Water, Community · confidence: medium
- Description: Marshall Ford is a 108 MW hydroelectric generating facility associated with Mansfield Dam on Lake Travis in Texas. The EIA/FERC registry lists plant code 3600 under the Lower Colorado River Authority in Travis County, with three 36 MW generator units. ERCOT identifies the three units under the MARSFO market resource, and LCRA lists Mansfield Dam as completed in 1941 with hydroelectric generation. — MBR | Index · confidence: medium
- Description: Marshall Ford is a 108 MW hydroelectric generating facility associated with Mansfield Dam on Lake Travis in Texas. The EIA/FERC registry lists plant code 3600 under the Lower Colorado River Authority in Travis County, with three 36 MW generator units. ERCOT identifies the three units under the MARSFO market resource, and LCRA lists Mansfield Dam as completed in 1941 with hydroelectric generation. — Source · confidence: medium
- Parties: [{"relationship":"Owner","name":"Lower Colorado River Authority","official_url":"https://www.lcra.org/"},{"relationship":"Operator","name":"Lower Colorado River Authority","official_url":"https://www.lcra.org/"},{"relationship":"Turbine supplier","name":"ANDRITZ Hydro","official_url":"https://www.andritz.com/hydro-en"},{"relationship":"Generator supplier","name":"GE Renewable Energy","official_url":"https://www.gevernova.com/"}] — MANSFIELD (MARSHALL FORD) DAM AND LAKE TRAVIS · confidence: medium
- Parties: [{"relationship":"Owner","name":"Lower Colorado River Authority","official_url":"https://www.lcra.org/"},{"relationship":"Operator","name":"Lower Colorado River Authority","official_url":"https://www.lcra.org/"},{"relationship":"Turbine supplier","name":"ANDRITZ Hydro","official_url":"https://www.andritz.com/hydro-en"},{"relationship":"Generator supplier","name":"GE Renewable Energy","official_url":"https://www.gevernova.com/"}] — Power plant profile: Marshall Ford, US · confidence: medium
- Parties: [{"relationship":"Owner","name":"Lower Colorado River Authority","official_url":"https://www.lcra.org/"},{"relationship":"Operator","name":"Lower Colorado River Authority","official_url":"https://www.lcra.org/"},{"relationship":"Turbine supplier","name":"ANDRITZ Hydro","official_url":"https://www.andritz.com/hydro-en"},{"relationship":"Generator supplier","name":"GE Renewable Energy","official_url":"https://www.gevernova.com/"}] — LCRA - Lower Colorado River Authority - Energy, Water... · confidence: medium
- Parties: [{"relationship":"Owner","name":"Lower Colorado River Authority","official_url":"https://www.lcra.org/"},{"relationship":"Operator","name":"Lower Colorado River Authority","official_url":"https://www.lcra.org/"},{"relationship":"Turbine supplier","name":"ANDRITZ Hydro","official_url":"https://www.andritz.com/hydro-en"},{"relationship":"Generator supplier","name":"GE Renewable Energy","official_url":"https://www.gevernova.com/"}] — Hydropower · confidence: medium
- Parties: [{"relationship":"Owner","name":"Lower Colorado River Authority","official_url":"https://www.lcra.org/"},{"relationship":"Operator","name":"Lower Colorado River Authority","official_url":"https://www.lcra.org/"},{"relationship":"Turbine supplier","name":"ANDRITZ Hydro","official_url":"https://www.andritz.com/hydro-en"},{"relationship":"Generator supplier","name":"GE Renewable Energy","official_url":"https://www.gevernova.com/"}] — GE Vernova | The Energy of Change · confidence: medium
- Canonical name: Marshall Ford — MBR | Index · confidence: high
- Identifiers.0: {"value":"3600","system":"EIA plant code"} — MBR | Index · confidence: high
- Identifiers.1: {"value":"1","system":"EIA generator ID"} — MBR | Index · confidence: high
- Identifiers.2: {"value":"2","system":"EIA generator ID"} — MBR | Index · confidence: high
- Identifiers.3: {"value":"3","system":"EIA generator ID"} — MBR | Index · confidence: high
- Identifiers.4: {"value":"ERCOT","system":"ISO/RTO"} — Source · confidence: high
- Identifiers.5: {"value":"MARSFO","system":"ERCOT market resource"} — Source · confidence: high
- Identifiers.6: {"value":"MARSFO_MARSFOG1","system":"ERCOT unit code"} — Source · confidence: high
- Identifiers.7: {"value":"MARSFO_MARSFOG2","system":"ERCOT unit code"} — Source · confidence: high
- Identifiers.8: {"value":"MARSFO_MARSFOG3","system":"ERCOT unit code"} — Source · confidence: high
- Parties.0: {"relationship":"Owner","name":"Lower Colorado River Authority","official_url":"https://www.lcra.org/"} — MANSFIELD (MARSHALL FORD) DAM AND LAKE TRAVIS · confidence: high
- Parties.2: {"relationship":"Turbine supplier","name":"ANDRITZ Hydro","official_url":"https://www.andritz.com/hydro-en"} — Power plant profile: Marshall Ford, US · confidence: medium
- Parties.3: {"relationship":"Generator supplier","name":"GE Renewable Energy","official_url":"https://www.gevernova.com/"} — Power plant profile: Marshall Ford, US · confidence: medium
- Parties.3: {"relationship":"Generator supplier","name":"GE Renewable Energy","official_url":"https://www.gevernova.com/"} — GE Vernova | The Energy of Change · confidence: medium
- Unit configuration: Conventional hydroelectric plant with three vertical Francis turbine-generator units; ERCOT lists MARSFO_MARSFOG1, MARSFO_MARSFOG2, and MARSFO_MARSFOG3 at 36 MW each. — Source · confidence: medium
- Power mw: 108 — Source · confidence: medium
- Unit count: 3 — Source · confidence: high
- Construction scope: Marshall Ford/Mansfield Dam is a hydroelectric powerhouse with three vertical Francis turbines, three generators, and three 16-foot-diameter penstocks. The USACE manual reports upgraded dependable capacities of 37 MW for Units 1 and 3 and 42 MW for Unit 2, totaling 116 MW installed capacity. ERCOT lists the corresponding MARSFO resource as three 36 MW hydro units, while LCRA lists the facility at 108 MW generating capacity. A project profile reports three 36 MW Francis turbines supplied by ANDRITZ Hydro and three electric generators supplied by GE Renewable Energy. The historical TWDB record identifies the original turbines as I.P. Morris vertical Francis units and the original generators as GE units. — Source · confidence: medium
- Construction scope: Marshall Ford/Mansfield Dam is a hydroelectric powerhouse with three vertical Francis turbines, three generators, and three 16-foot-diameter penstocks. The USACE manual reports upgraded dependable capacities of 37 MW for Units 1 and 3 and 42 MW for Unit 2, totaling 116 MW installed capacity. ERCOT lists the corresponding MARSFO resource as three 36 MW hydro units, while LCRA lists the facility at 108 MW generating capacity. A project profile reports three 36 MW Francis turbines supplied by ANDRITZ Hydro and three electric generators supplied by GE Renewable Energy. The historical TWDB record identifies the original turbines as I.P. Morris vertical Francis units and the original generators as GE units. — Facilities - LCRA - Energy, Water, Community · confidence: medium
- Construction scope: Marshall Ford/Mansfield Dam is a hydroelectric powerhouse with three vertical Francis turbines, three generators, and three 16-foot-diameter penstocks. The USACE manual reports upgraded dependable capacities of 37 MW for Units 1 and 3 and 42 MW for Unit 2, totaling 116 MW installed capacity. ERCOT lists the corresponding MARSFO resource as three 36 MW hydro units, while LCRA lists the facility at 108 MW generating capacity. A project profile reports three 36 MW Francis turbines supplied by ANDRITZ Hydro and three electric generators supplied by GE Renewable Energy. The historical TWDB record identifies the original turbines as I.P. Morris vertical Francis units and the original generators as GE units. — Source · confidence: medium
- Construction scope: Marshall Ford/Mansfield Dam is a hydroelectric powerhouse with three vertical Francis turbines, three generators, and three 16-foot-diameter penstocks. The USACE manual reports upgraded dependable capacities of 37 MW for Units 1 and 3 and 42 MW for Unit 2, totaling 116 MW installed capacity. ERCOT lists the corresponding MARSFO resource as three 36 MW hydro units, while LCRA lists the facility at 108 MW generating capacity. A project profile reports three 36 MW Francis turbines supplied by ANDRITZ Hydro and three electric generators supplied by GE Renewable Energy. The historical TWDB record identifies the original turbines as I.P. Morris vertical Francis units and the original generators as GE units. — Power plant profile: Marshall Ford, US · confidence: medium
- Kind: hydro — Facilities - LCRA - Energy, Water, Community · confidence: high
- Significance: Marshall Ford is historically notable because its first hydroelectric unit entered operation on 1941-01-27, about 16 months before the high dam was completed in May 1942. The low dam was principally intended for hydropower, while the later high dam primarily provided downstream flood control. — Source · confidence: high
- Description: Marshall Ford is a 108 MW conventional hydroelectric generating facility associated with Mansfield Dam and Lake Travis in Travis County, Texas. ERCOT records three 36 MW units—MARSFOG1, MARSFOG2, and MARSFOG3—under the MARSFO market resource. Lower Colorado River Authority owns and operates the facility; the dam was originally called Marshall Ford Dam and was later named Mansfield Dam. The Bureau of Reclamation planned and built the dam, while LCRA acquired project land and paid most costs associated with the hydroelectric facilities. The first unit entered operation in January 1941, and the high dam was completed in May 1942. — Facilities - LCRA - Energy, Water, Community · confidence: medium
- Description: Marshall Ford is a 108 MW conventional hydroelectric generating facility associated with Mansfield Dam and Lake Travis in Travis County, Texas. ERCOT records three 36 MW units—MARSFOG1, MARSFOG2, and MARSFOG3—under the MARSFO market resource. Lower Colorado River Authority owns and operates the facility; the dam was originally called Marshall Ford Dam and was later named Mansfield Dam. The Bureau of Reclamation planned and built the dam, while LCRA acquired project land and paid most costs associated with the hydroelectric facilities. The first unit entered operation in January 1941, and the high dam was completed in May 1942. — Source · confidence: medium
- Description: Marshall Ford is a 108 MW conventional hydroelectric generating facility associated with Mansfield Dam and Lake Travis in Travis County, Texas. ERCOT records three 36 MW units—MARSFOG1, MARSFOG2, and MARSFOG3—under the MARSFO market resource. Lower Colorado River Authority owns and operates the facility; the dam was originally called Marshall Ford Dam and was later named Mansfield Dam. The Bureau of Reclamation planned and built the dam, while LCRA acquired project land and paid most costs associated with the hydroelectric facilities. The first unit entered operation in January 1941, and the high dam was completed in May 1942. — Source · confidence: medium
- Quality notes: ["The current LCRA facility listing and ERCOT resource record use 108 MW, while the historical USACE manual reports an archival installed capacity of 116,000 kW; this directory uses the current 108 MW plant identity.","The 1997 change in control was a repayment-based transfer and contract termination rather than a conventional project sale; no separate sale consideration or seller/buyer transaction value is identified.","LCRA's documented later capital work concerns Mansfield Dam floodgates; no separate retirement or generator-repowering milestone is established."] — Facilities - LCRA - Energy, Water, Community · confidence: medium
- Quality notes: ["The current LCRA facility listing and ERCOT resource record use 108 MW, while the historical USACE manual reports an archival installed capacity of 116,000 kW; this directory uses the current 108 MW plant identity.","The 1997 change in control was a repayment-based transfer and contract termination rather than a conventional project sale; no separate sale consideration or seller/buyer transaction value is identified.","LCRA's documented later capital work concerns Mansfield Dam floodgates; no separate retirement or generator-repowering milestone is established."] — Source · confidence: medium
- Quality notes: ["The current LCRA facility listing and ERCOT resource record use 108 MW, while the historical USACE manual reports an archival installed capacity of 116,000 kW; this directory uses the current 108 MW plant identity.","The 1997 change in control was a repayment-based transfer and contract termination rather than a conventional project sale; no separate sale consideration or seller/buyer transaction value is identified.","LCRA's documented later capital work concerns Mansfield Dam floodgates; no separate retirement or generator-repowering milestone is established."] — LCRA dams form the Highland Lakes · confidence: medium
- Financing summary: The project used a cooperative federal/LCRA financing structure rather than disclosed project-sale financing. Under a 1935 agreement, LCRA planned, designed, and financed the hydroelectric generating facilities, while $5 million was allocated to the Bureau of Reclamation for the flood-control portion from Emergency Relief Appropriation Act funds. The USACE manual lists total project cost at $28,709,948 for the dam, powerplant, and related facilities. On 1997-05-30, LCRA and the Bureau of Reclamation agreed to a discounted prepayment of LCRA's remaining reimbursable obligation; the amount of that prepayment is not disclosed in the cited record, and the transaction was not reported as a conventional sale. — Source · confidence: high
- Timeline: [{"event":"Cooperative planning and financing agreement","date":"1935-06-01","detail":"The Secretary of the Interior and LCRA entered a cooperative agreement for a unified system of dams. LCRA was responsible for land and water rights and for planning, designing, and financing the Mansfield hydroelectric facilities; the Bureau of Reclamation handled flood-control and conservation features."},{"event":"Construction began","date":"1937","detail":"Construction of Mansfield Dam, originally Marshall Ford Dam, began as a joint LCRA/Bureau of Reclamation project."},{"event":"Low dam completed","date":"1939-08","detail":"The first-stage low dam was completed at the initial lower elevation, with provisions for later enlargement."},{"event":"High dam construction began","date":"1939-09","detail":"Construction of the enlarged high dam began after the low-dam stage."},{"event":"Deliberate impoundment began","date":"1940-09","detail":"Deliberate impoundment of the reservoir began."},{"event":"First generating unit entered operation","date":"1941-01-27","detail":"The first Marshall Ford hydroelectric unit was placed in operation."},{"event":"Remaining generating units entered operation","date":"1941-03-02","detail":"The second generating unit was placed in operation; the third unit followed on 1941-06-13."},{"event":"Dam renamed and high dam completed","date":"1941-02-21","detail":"The dam was named Mansfield Dam in honor of Congressman J. J. Mansfield, while the powerplant retained the Marshall Ford name."},{"event":"High dam completed","date":"1942-05","detail":"The high dam reached its final elevation; the conservation pool was filled in September 1942."},{"event":"Repayment-based ownership and control transfer","date":"1997-05-30","detail":"LCRA and the Bureau of Reclamation terminated the existing Mansfield Dam contracts after LCRA made a discounted prepayment of its remaining reimbursable obligation. The Bureau relinquished its rights and obligations, and title and operational responsibility remained with LCRA."}] — Source · confidence: high
- Timeline: [{"event":"Cooperative planning and financing agreement","date":"1935-06-01","detail":"The Secretary of the Interior and LCRA entered a cooperative agreement for a unified system of dams. LCRA was responsible for land and water rights and for planning, designing, and financing the Mansfield hydroelectric facilities; the Bureau of Reclamation handled flood-control and conservation features."},{"event":"Construction began","date":"1937","detail":"Construction of Mansfield Dam, originally Marshall Ford Dam, began as a joint LCRA/Bureau of Reclamation project."},{"event":"Low dam completed","date":"1939-08","detail":"The first-stage low dam was completed at the initial lower elevation, with provisions for later enlargement."},{"event":"High dam construction began","date":"1939-09","detail":"Construction of the enlarged high dam began after the low-dam stage."},{"event":"Deliberate impoundment began","date":"1940-09","detail":"Deliberate impoundment of the reservoir began."},{"event":"First generating unit entered operation","date":"1941-01-27","detail":"The first Marshall Ford hydroelectric unit was placed in operation."},{"event":"Remaining generating units entered operation","date":"1941-03-02","detail":"The second generating unit was placed in operation; the third unit followed on 1941-06-13."},{"event":"Dam renamed and high dam completed","date":"1941-02-21","detail":"The dam was named Mansfield Dam in honor of Congressman J. J. Mansfield, while the powerplant retained the Marshall Ford name."},{"event":"High dam completed","date":"1942-05","detail":"The high dam reached its final elevation; the conservation pool was filled in September 1942."},{"event":"Repayment-based ownership and control transfer","date":"1997-05-30","detail":"LCRA and the Bureau of Reclamation terminated the existing Mansfield Dam contracts after LCRA made a discounted prepayment of its remaining reimbursable obligation. The Bureau relinquished its rights and obligations, and title and operational responsibility remained with LCRA."}] — Federal Register :: Flood Control Regulations, Marshall Ford Dam (Mansfield Dam and Lake Travis), Colorado River, Texas · confidence: high
- Timeline: [{"event":"Cooperative planning and financing agreement","date":"1935-06-01","detail":"The Secretary of the Interior and LCRA entered a cooperative agreement for a unified system of dams. LCRA was responsible for land and water rights and for planning, designing, and financing the Mansfield hydroelectric facilities; the Bureau of Reclamation handled flood-control and conservation features."},{"event":"Construction began","date":"1937","detail":"Construction of Mansfield Dam, originally Marshall Ford Dam, began as a joint LCRA/Bureau of Reclamation project."},{"event":"Low dam completed","date":"1939-08","detail":"The first-stage low dam was completed at the initial lower elevation, with provisions for later enlargement."},{"event":"High dam construction began","date":"1939-09","detail":"Construction of the enlarged high dam began after the low-dam stage."},{"event":"Deliberate impoundment began","date":"1940-09","detail":"Deliberate impoundment of the reservoir began."},{"event":"First generating unit entered operation","date":"1941-01-27","detail":"The first Marshall Ford hydroelectric unit was placed in operation."},{"event":"Remaining generating units entered operation","date":"1941-03-02","detail":"The second generating unit was placed in operation; the third unit followed on 1941-06-13."},{"event":"Dam renamed and high dam completed","date":"1941-02-21","detail":"The dam was named Mansfield Dam in honor of Congressman J. J. Mansfield, while the powerplant retained the Marshall Ford name."},{"event":"High dam completed","date":"1942-05","detail":"The high dam reached its final elevation; the conservation pool was filled in September 1942."},{"event":"Repayment-based ownership and control transfer","date":"1997-05-30","detail":"LCRA and the Bureau of Reclamation terminated the existing Mansfield Dam contracts after LCRA made a discounted prepayment of its remaining reimbursable obligation. The Bureau relinquished its rights and obligations, and title and operational responsibility remained with LCRA."}] — Source · confidence: high
- Commercial parties: [{"relationship":"Owner and operator","name":"Lower Colorado River Authority","detail":"LCRA owns and operates the Marshall Ford hydroelectric facility and assumed full project administration, operation, maintenance, and oversight after the 1997 repayment agreement.","official_url":"https://www.lcra.org/"},{"relationship":"Predecessor owner, federal project agency, and construction partner","name":"U.S. Bureau of Reclamation","detail":"The Bureau of Reclamation funded, planned, and built the dam and was the original project owner while LCRA repaid the planning and construction loan. It relinquished its remaining project rights and obligations to LCRA in May 1997.","official_url":"https://www.usbr.gov/"}] — Source · confidence: high

## Timeline

- 1937 — Construction began
  Construction of Mansfield Dam, originally Marshall Ford Dam, began as a joint LCRA/Bureau of Reclamation project.
  Source: Federal Register :: Flood Control Regulations, Marshall Ford Dam (Mansfield Dam and Lake Travis), Colorado River, Texas (https://www.federalregister.gov/documents/2014/03/11/2014-05252/flood-control-regulations-marshall-ford-dam-mansfield-dam-and-lake-travis-colorado-river-texas)
- 1941-01-27 — First generating unit entered operation
  The first Marshall Ford hydroelectric unit was placed in operation.
  Source: Source (https://water.usace.army.mil/cda/documents/wc/3338/MANSFIELD%20DAM%20AND%20LAKE%20TRAVIS%20WATER%20CONTROL%20MANUAL.pdf)
- 1941-02-21 — Dam renamed and high dam completed
  The dam was named Mansfield Dam in honor of Congressman J. J. Mansfield, while the powerplant retained the Marshall Ford name.
  Source: Source (https://www.twdb.texas.gov/publications/reports/numbered_reports/doc/R81/R81.pdf)
- 1942-05 — High dam completed
  The high dam reached its final elevation; the conservation pool was filled in September 1942.
  Source: Source (https://water.usace.army.mil/cda/documents/wc/3338/MANSFIELD%20DAM%20AND%20LAKE%20TRAVIS%20WATER%20CONTROL%20MANUAL.pdf)

## Sources

- [LCRA - Lower Colorado River Authority - Energy, Water ...](https://www.lcra.org/) — lcra.org · tier other
- [MBR | Index](https://mbrweb.ferc.gov/SearchlkpEIA/Index?page=35) — mbrweb.ferc.gov · tier regulatory
- [Source](https://www.ercot.com/files/MarketNotice/2025/08/297735/Stand-Alone%20Generation%20Resources%20as%20of%2009.01.25.pdf) — ercot.com · tier regulatory
- [Source](https://www.ercot.com/files/docs/2026/04/02/MORA_June2026.pdf) — ercot.com · tier regulatory
- [Facilities - LCRA - Energy, Water, Community](https://www.lcra.org/energy/electric-power/facilities/) — lcra.org · tier other
- [Source](https://water.usace.army.mil/cda/documents/wc/3338/MANSFIELD%20DAM%20AND%20LAKE%20TRAVIS%20WATER%20CONTROL%20MANUAL.pdf) — water.usace.army.mil · tier other
- [Power plant profile: Marshall Ford, US](https://www.power-technology.com/data-insights/power-plant-profile-marshall-ford-us/) — power-technology.com · tier other
- [Hydropower](https://www.andritz.com/hydro-en) — andritz.com · tier other
- [GE Vernova | The Energy of Change](https://www.gevernova.com/) — gevernova.com · tier other
- [LCRA dams form the Highland Lakes](https://www.lcra.org/water/dams-and-lakes/) — lcra.org · tier other
- [Source](https://www.twdb.texas.gov/publications/reports/numbered_reports/doc/R81/R81.pdf) — twdb.texas.gov · tier regulatory
- [Turbines](https://www.andritz.com/products-en/group/products/turbines-hydropower) — andritz.com · tier other
- [Large Hydro Generators | GE Vernova](https://www.gevernova.com/hydropower/large-hydropower-solutions/generators) — gevernova.com · tier other
- [Source](https://www.ercot.com/files/docs/2020/05/13/SARA-PreliminaryFall2020.pdf) — ercot.com · tier regulatory
- [Federal Register :: Flood Control Regulations, Marshall Ford Dam (Mansfield Dam and Lake Travis), Colorado River, Texas](https://www.federalregister.gov/documents/2014/03/11/2014-05252/flood-control-regulations-marshall-ford-dam-mansfield-dam-and-lake-travis-colorado-river-texas) — federalregister.gov · tier regulatory
- [Source](https://www.ercot.com/files/docs/2025/09/02/Stand-Alone-Generation-Resources-as-of-09.01.25-v2.pdf) — ercot.com · tier regulatory
- [Data Product Details](https://www.ercot.com/mp/data-products/data-product-details?id=NP4-160-SG) — ercot.com · tier regulatory
- [Interchange - Documents](https://interchange.puc.texas.gov/search/documents/?controlNumber=35077&itemNumber=116) — interchange.puc.texas.gov · tier regulatory
- [Marshall Ford-Lago Vista 138kV Transmission Linet](https://www.irbyconstruction.com/project/marshall-ford-lago-vista-138kv-transmission-line-construction-project/) — irbyconstruction.com · tier other
- [Source](https://www.ercot.com/files/docs/2007/09/13/electrical_bus_names_090707_rev1.xls) — ercot.com · tier regulatory
- [Source](https://www.ercot.com/files/docs/2026/06/05/MORA_August2026.pdf) — ercot.com · tier regulatory
- [LCRA Board approves business and capital plans for fiscal year 2025 - LCRA - Energy, Water, Community](https://www.lcra.org/news/news-releases/lcra-board-approves-business-and-capital-plans-for-fiscal-year-2025/) — lcra.org · tier other

## Data quality

- The current LCRA facility listing and ERCOT resource record use 108 MW, while the historical USACE manual reports an archival installed capacity of 116,000 kW; this directory uses the current 108 MW plant identity. LCRA's documented later capital work concerns Mansfield Dam floodgates; no separate retirement or generator-repowering milestone is established.

---

Canonical page: https://askthegrid.com/assets/facilities/marshall-ford

Source: Ask the Grid — https://askthegrid.com/