# Miami Wind Energy Center

ERCOT asset profile · https://askthegrid.com/assets/facilities/miami-wind-energy-center

Invenergy · Texas Panhandle · ERCOT

Miami Wind Energy Center is a 288.6 MW wind facility spanning Roberts, Hemphill, Gray, and Wheeler counties in the Texas Panhandle. Invenergy announced commercial operation on September 24, 2014 and identifies 156 GE 1.85 MW turbines. Invenergy acquired the project from Pioneer Green Energy, arranged construction debt and tax-equity commitments in December 2013, and remains the EIA-listed operating organization through Invenergy Services LLC.

## Profile

- **Grid role:** Utility-scale wind generation in the ERCOT West Zone.
- **Equipment:** 156 GE 1.85 MW wind turbines.

## Metrics

- **Operating capacity:** 288.6 MW — EIA and Invenergy
- **Turbines:** 156 — GE 1.85 MW
- **Commercial operation:** Sep 24, 2014 — Invenergy
- **Host counties:** 4 — Roberts · Hemphill · Gray · Wheeler
- **Resource stack:** 2 resources — MIAM1_G1 · MIAM1_G2
- **Registry anchor:** Plant 58765 — Invenergy Services LLC

## Facts

- **Operating capacity:** 288.6 MW — EIA and Invenergy · confidence: high
- **Developer and operator:** Invenergy — Invenergy · confidence: high
- **Equipment:** 156 GE 1.85 MW turbines — Invenergy · confidence: high

## Related parties

- **EIA registered operator:** Invenergy Services LLC — EIA May 2026 generator inventory

## Sources

- [EIA May 2026 generator inventory](https://www.eia.gov/electricity/data/eia860m/) — U.S. Energy Information Administration · regulatory — Current generator records, capacity scopes, dates, status, operator, and technology.
- [Invenergy Miami operation announcement](https://invenergy.com/news/invenergy-commences-commercial-operation-of-miami-wind-energy-center-in-texas) — Invenergy · official — Capacity, counties, commercial-operation date, turbine count, manufacturer, and unit rating.
- [Invenergy Miami financing](https://invenergy.com/news/invenergy-completes-project-financing-for-miami-wind-energy-center-in-texas) — Invenergy · official — Prior developer, debt and tax-equity structure, arranger, and construction contractors.

---

Canonical page: https://askthegrid.com/assets/facilities/miami-wind-energy-center
Website: [Invenergy](https://invenergy.com/news/invenergy-commences-commercial-operation-of-miami-wind-energy-center-in-texas)
Profile published: 2026-07-17T03:34:33.737Z
Source: Ask the Grid — https://askthegrid.com/
