Microsoft's Elk Grove Village data center is the first Microsoft building on its plot in the Elk Grove Technology Park, with a building permit application at 201 Innovation Dr. valued at $123 million. Microsoft paid Brennan Investment Group $52.2 million for the 36.6-acre parcel in January 2020, and grading and base work on the first building has been reported. The plot could eventually hold three data center buildings totaling 400,000 sq ft. Microsoft reportedly bought a parcel so ComEd could build a new substation in the park.

## Identity and location

- Operating status: under_construction
- Asset scope: building
- Location: 201 Innovation Dr, Elk Grove Village, IL

## Power and grid context

- Electric utility: ComEd

## Development

- Construction: Grading and base work for the first Microsoft building on the east side of Elk Grove Technology Park was reported under way; the 37-acre plot could eventually hold three data center buildings totaling 400,000 sq ft

## Sources

- [U.S. Census street-address geocode](https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=201+Innovation+Dr%2C+Elk+Grove+Village%2C+IL&benchmark=Public_AR_Current&vintage=Current_Current&format=json)
- [Microsoft Files Data Center Applications with Elk Grove Illinois - Telecom Review Americas](https://telecomreviewamericas.com/articles/reports-and-coverage/microsoft-files-data-center-applications-with-elk-grove-illinois)
- [Microsoft begins data center construction in Elk Grove, Chicago - DCD](https://web.archive.org/web/2/https://www.datacenterdynamics.com/en/news/microsoft-begins-construction-elk-grove-chicago/)

## Data quality

- Power values retain their reported, requested, contracted, energized, gross-campus, or critical-IT basis.
- Map point: approximate U.S. Census street-address geocode.

---

Canonical page: https://askthegrid.com/assets/facilities/microsoft-elk-grove-village-data-center
Profile generated: 2026-10-09T03:45:53.550627Z
Source: Ask the Grid — https://askthegrid.com/