# Microsoft Project Alluvion Data Center Campus

MISO data center · https://askthegrid.com/assets/facilities/microsoft-project-alluvion-data-center-campus

Microsoft's Project Alluvion campus in West Des Moines, Polk County, sits at 550 SE White Crane Road on a 154-acre site, partly former Willow Creek Golf Course land. Announced in 2014 as a $1.1 billion investment, it was planned at about 1.2 million sq ft. Iowa DNR permits it under the name Willow Creek, jointly with the neighboring Ginger East campus, as an existing data center with Cummins diesel emergency engines (Title V permit 24-TV-005). MidAmerican Energy serves the site. Incentives included a $20.3 million state sales tax rebate.

## Identity and location

- Operating status: operating
- Asset scope: campus
- Location: 550 SE White Crane Road, West Des Moines, Polk County, IA

## Development

- Gross floor area: 1,160,000 square feet

## Compute and operations

- Facility classes: hyperscale, cloud

## Sources

- [U.S. Census street-address geocode](https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=550+SE+White+Crane+Road%2C+West+Des+Moines%2C+IA%2C+50265&benchmark=Public_AR_Current&vintage=Current_Current&format=json)
- [https://iowadnr.gov/media/7168/download](https://iowadnr.gov/media/7168/download)
- [Microsoft to Build New $1.1 Billion Data Center in Iowa](https://www.datacenterknowledge.com/hyperscalers/microsoft-to-build-new-1-1-billion-data-center-in-iowa)
- [Air quality permits for review, published 11/07/2024 | Department of Natural Resources](https://www.iowadnr.gov/news-release/2024-12-05/air-quality-permits-review-published-11072024)
- [Microsoft to spend $1.1bn to build Iowa data center](https://www.theregister.com/2014/04/21/microsoft_to_spend_11bn_to_build_iowa_data_center/)

## Data quality

- Power values retain their reported, requested, contracted, energized, gross-campus, or critical-IT basis.
- Map point: approximate U.S. Census street-address geocode.

---