# Miramar Energy Facility

CAISO asset profile · https://askthegrid.com/assets/facilities/miramar-energy-facility

## Current generation inventory

EIA plant 56232 · Inventory reporting month: 2026-08.

- natural gas: 106 MW operating nameplate
- Capacity basis: operating_generator_nameplate_mw
- Source inventory: [EIA-860M workbook (preliminary)](https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx)
- Inventory retrieved: 2026-10-10T22:49:53.020309+00:00
- Filed coordinate (longitude, latitude): -117.1664, 32.8769
- OSM extract: 2026-10-09T20:21:04Z
- OSM mapped edit: 2022-06-27 00:17:38+00:00
- Map prepared: 2026-10-10T23:05:22.122096+00:00

Battery power (MW) and stored energy (MWh) are separate measures. Shared physical-site membership does not establish electrical connectivity, settlement or a common export limit.

## Reviewed overview

Miramar Energy Facility is SDG&E’s two-unit natural-gas peaking plant at 6875 Consolidated Way in San Diego. The August 2026 EIA inventory lists two 53 MW combustion turbines, totaling 106 MW of nameplate capacity. SDG&E’s regulatory descriptions use different output ratings, including two 48 MW units; those ratings describe a different capacity basis. The facility supports local peaking needs and black-start service in the CAISO balancing area. Miramar’s gas turbines are separate from the nearby Top Gun battery energy-storage project.

## Reviewed metrics

- **Nameplate capacity:** 106 MW — Canonical EIA plant baseline.
- **Registry anchor:** Plant 56232 — plant-56232

## Facts

- **Technology:** Natural Gas Fired Combustion Turbine
- **Operator:** San Diego Gas & Electric Company
- **Operating status:** Operating

## Related parties

- **Owner / operator:** San Diego Gas & Electric Company — Owner and operator ([source](https://www.sdge.com/))
- **Former owner / developer / construction contractor:** Ramco Generating One, Inc. — MEF I developer, constructor, and turnkey seller
- **Equipment supplier:** General Electric — Turbine supplier ([source](https://www.gevernova.com/gas-power/products/gas-turbines/lm6000))
- **EPC contractor:** Wellhead Services, Inc. — MEF II EPC contractor

## Sources

- [api.eia.gov](https://api.eia.gov/v2/electricity/operating-generator-capacity/data?api_key=DEMO_KEY&data%5B0%5D=nameplate-capacity-mw&data%5B1%5D=net-summer-capacity-mw&data%5B2%5D=net-winter-capacity-mw&data%5B3%5D=operating-year-month&end=2026-07&facets%5Bplantid%5D%5B%5D=56232&frequency=monthly&start=2026-07) — api.eia.gov · authoritative — Source retained for exact-record publication review.
- [ceqanet.lci.ca.gov](https://ceqanet.lci.ca.gov/2004081096) — ceqanet.lci.ca.gov · authoritative — Source retained for exact-record publication review.
- [docs.cpuc.ca.gov](https://docs.cpuc.ca.gov/PUBLISHED/FINAL_DECISION/96821.htm) — docs.cpuc.ca.gov · authoritative — Source retained for exact-record publication review.
- [docs.cpuc.ca.gov](https://docs.cpuc.ca.gov/PublishedDocs/SupDoc/A2205015;A2205016/6092/509543999.pdf) — docs.cpuc.ca.gov · authoritative — Source retained for exact-record publication review.
- [docs.cpuc.ca.gov](https://docs.cpuc.ca.gov/PublishedDocs/WORD_PDF/FINAL_DECISION/41115.PDF) — docs.cpuc.ca.gov · authoritative — Source retained for exact-record publication review.
- [docs.cpuc.ca.gov](https://docs.cpuc.ca.gov/PublishedDocs/WORD_PDF/FINAL_RESOLUTION/43455.PDF) — docs.cpuc.ca.gov · authoritative — Source retained for exact-record publication review.
- [docs.cpuc.ca.gov](https://docs.cpuc.ca.gov/publishedDocs/published/Agenda_resolution/56842.htm) — docs.cpuc.ca.gov · authoritative — Source retained for exact-record publication review.

---

Canonical page: https://askthegrid.com/assets/facilities/miramar-energy-facility
Website: [San Diego Gas & Electric Company](https://www.sdge.com/)

Source: Ask the Grid — https://askthegrid.com/
