# Mitchell (WV)

PJM Conventional Steam Coal · https://askthegrid.com/assets/facilities/mitchell-wv

Mitchell (WV) is a coal-fired power facility with 1,632.6 MW of EIA-reported nameplate capacity in Marshall County, West Virginia, registered as EIA Plant ID 3948. Mitchell (WV) is currently operating; coal operations are scheduled to cease by December 31, 2031, with no post-2031 project has been approved. Evaluated options include conversion to 100% natural gas, 40% gas co-fire followed by retirement, or replacement with a new combined-cycle gas plant.

## Key facts

- Technology: Conventional Steam Coal
- Power capacity: 1632.6 MW
- Commercial operation: 1971
- Operating status: operating

## Grid and market context

- ISO/RTO: PJM
- Balancing authority: PJM Interconnection, LLC
- Substation: Kammer yard
- Point of interconnection: Kammer yard
- Transmission owner: American Electric Power (AEP)
- Interconnection voltage: 765 kV

## Source-backed facts

- Owner logo domain: kentuckypower.com — Kentucky Power · confidence: medium
- Identifiers: [{"value":"3948","system":"EIA plant ID"},{"value":"PJM","system":"ISO/RTO"},{"value":"Mitchell 1; Mitchell 2","system":"FERC MBR asset/unit names"},{"value":"Unit 1","system":"Plant unit"},{"value":"Unit 2","system":"Plant unit"},{"value":"2025-00175","system":"Kentucky PSC docket"}] — Asset Appendix Report - MBR · confidence: medium
- Identifiers: [{"value":"3948","system":"EIA plant ID"},{"value":"PJM","system":"ISO/RTO"},{"value":"Mitchell 1; Mitchell 2","system":"FERC MBR asset/unit names"},{"value":"Unit 1","system":"Plant unit"},{"value":"Unit 2","system":"Plant unit"},{"value":"2025-00175","system":"Kentucky PSC docket"}] — Source · confidence: medium
- Official project url: https://www.aep.com/environment/ccr/mitchell/ — Mitchell Plant · confidence: high
- Description: Mitchell (WV) is an operational 1,632.6-MW coal power plant in Marshall County, West Virginia, with two generating units. The plant participates in the PJM market and is operated by Kentucky Power Co. Units 1 and 2 entered service in 1971. Ownership is divided equally between Kentucky Power and Wheeling Power, both American Electric Power subsidiaries. — Source · confidence: medium
- Parties: [{"relationship":"50% owner and operator","name":"Kentucky Power Company","official_url":"https://www.kentuckypower.com/"},{"relationship":"50% co-owner","name":"Wheeling Power Company","official_url":"https://www.aep.com/"},{"relationship":"Parent company of Kentucky Power and Wheeling Power","name":"American Electric Power Company, Inc.","official_url":"https://www.aep.com/"}] — Source · confidence: medium
- Parties: [{"relationship":"50% owner and operator","name":"Kentucky Power Company","official_url":"https://www.kentuckypower.com/"},{"relationship":"50% co-owner","name":"Wheeling Power Company","official_url":"https://www.aep.com/"},{"relationship":"Parent company of Kentucky Power and Wheeling Power","name":"American Electric Power Company, Inc.","official_url":"https://www.aep.com/"}] — Source · confidence: medium
- Parties: [{"relationship":"50% owner and operator","name":"Kentucky Power Company","official_url":"https://www.kentuckypower.com/"},{"relationship":"50% co-owner","name":"Wheeling Power Company","official_url":"https://www.aep.com/"},{"relationship":"Parent company of Kentucky Power and Wheeling Power","name":"American Electric Power Company, Inc.","official_url":"https://www.aep.com/"}] — AEP.com · confidence: medium
- Identifiers.2: {"value":"Mitchell 1; Mitchell 2","system":"FERC MBR asset/unit names"} — Asset Appendix Report - MBR · confidence: medium
- Identifiers.5: {"value":"2025-00175","system":"Kentucky PSC docket"} — Source · confidence: high
- Parties.0: {"relationship":"50% owner and operator","name":"Kentucky Power Company","official_url":"https://www.kentuckypower.com/"} — Source · confidence: high
- Parties.0: {"relationship":"50% owner and operator","name":"Kentucky Power Company","official_url":"https://www.kentuckypower.com/"} — Source · confidence: high
- Parties.1: {"relationship":"50% co-owner","name":"Wheeling Power Company","official_url":"https://www.aep.com/"} — Source · confidence: medium
- Parties.2: {"relationship":"Parent company of Kentucky Power and Wheeling Power","name":"American Electric Power Company, Inc.","official_url":"https://www.aep.com/"} — Source · confidence: high
- Parties.2: {"relationship":"Parent company of Kentucky Power and Wheeling Power","name":"American Electric Power Company, Inc.","official_url":"https://www.aep.com/"} — AEP.com · confidence: high
- Construction scope: Mitchell Station consists of two approximately 800-MW pulverized-coal-fired steam-generating units using bituminous coal. Documented installed/environmental equipment includes electrostatic precipitators, selective catalytic reduction, trona injection, and a Babcock & Wilcox limestone-forced-oxidation wet FGD system comprising two wet FGD absorbers (one per boiler), two limestone milling systems, and three horizontal table filters (two operating and one spare), plus associated buildings and structural steel. — Mitchell Station Units 1 and 2 Wet Flue Gas Desulfurization Systems · confidence: high
- Product url: https://www.babcock.com/home/products/wet-scrubbers-fgd — Wet Scrubber Flue Gas Desulfurization (FGD) · confidence: medium
- Product family: Limestone-forced-oxidation wet flue-gas desulfurization system — Mitchell Station Units 1 and 2 Wet Flue Gas Desulfurization Systems · confidence: high
- Product family: Limestone-forced-oxidation wet flue-gas desulfurization system — Wet Scrubber Flue Gas Desulfurization (FGD) · confidence: high
- Equipment models.5: {"manufacturer_domain":"babcock.com","product_url":"https://www.babcock.com/home/products/wet-scrubbers-fgd","count":2,"unit_mw":null,"name":"Babcock & Wilcox limestone-forced-oxidation wet FGD absorber"} — Mitchell Station Units 1 and 2 Wet Flue Gas Desulfurization Systems · confidence: high
- Equipment models.5: {"manufacturer_domain":"babcock.com","product_url":"https://www.babcock.com/home/products/wet-scrubbers-fgd","count":2,"unit_mw":null,"name":"Babcock & Wilcox limestone-forced-oxidation wet FGD absorber"} — Wet Scrubber Flue Gas Desulfurization (FGD) · confidence: high
- Equipment models.6: {"manufacturer_domain":"babcock.com","product_url":"https://www.babcock.com/home/products/wet-scrubbers-fgd","count":2,"unit_mw":null,"name":"Babcock & Wilcox limestone milling system"} — Mitchell Station Units 1 and 2 Wet Flue Gas Desulfurization Systems · confidence: high
- Equipment models.7: {"manufacturer_domain":"babcock.com","product_url":"https://www.babcock.com/home/products/wet-scrubbers-fgd","count":3,"unit_mw":null,"name":"Babcock & Wilcox horizontal table filter"} — Mitchell Station Units 1 and 2 Wet Flue Gas Desulfurization Systems · confidence: high
- Description: Mitchell (WV) is a two-unit conventional coal station in Marshall County, West Virginia; both units entered service in 1971. Kentucky Power and Wheeling Power each hold a 50% ownership interest. Ohio Power was the predecessor owner, transferring a 50% interest to Kentucky Power at the end of 2013 and the other 50% through AEP Generation Resources to Wheeling Power at the end of 2014. Wheeling Power replaced Kentucky Power as plant operator in September 2022, while Kentucky Power remains a co-owner. In December 2025, Kentucky regulators approved investments intended to preserve Kentucky Power’s 50% entitlement to capacity and energy after December 31, 2028. — Source · confidence: medium
- Quality notes: ["Capacity figures use different bases: the EIA nameplate figure is 1,632.6 MW, the 2013 transfer documents describe Kentucky Power’s 50% share as 780 MW, and the DOE describes the full station as approximately 1,600 MW.","The West Virginia PSC press-release extraction displays a body date of December 30, 2015, but the related proceeding and Mitchell operating agreement identify the transaction as a December 2014 transfer; the timeline uses December 2014.","No completed retirement or repowering is established. Regulatory materials describe multiple future compliance paths, including coal retirement, gas co-firing, or full gas conversion, while the 2025 approval supports continued investment after 2028."] — Source · confidence: medium
- Quality notes: ["Capacity figures use different bases: the EIA nameplate figure is 1,632.6 MW, the 2013 transfer documents describe Kentucky Power’s 50% share as 780 MW, and the DOE describes the full station as approximately 1,600 MW.","The West Virginia PSC press-release extraction displays a body date of December 30, 2015, but the related proceeding and Mitchell operating agreement identify the transaction as a December 2014 transfer; the timeline uses December 2014.","No completed retirement or repowering is established. Regulatory materials describe multiple future compliance paths, including coal retirement, gas co-firing, or full gas conversion, while the 2025 approval supports continued investment after 2028."] — Source · confidence: medium
- Financing summary: The disclosed 2013 ownership transfer was an intercompany asset transfer at net book value, not separately identified project financing: Kentucky Power’s associated book amount was approximately $536 million, with a $44 million annual asset-transfer rider approved for partial recovery. The December 2014 Wheeling Power acquisition had an approximately $550 million total transaction price; the cited regulatory materials do not characterize that amount as construction debt or project-finance proceeds. For the planned cooling-tower modernization, DOE lists $51.0 million of federal funding and $107.6 million of non-federal funding, for a total value of $158.6 million. — Kentucky Power Files Asset Transfer Settlement Agreement · confidence: medium
- Financing summary: The disclosed 2013 ownership transfer was an intercompany asset transfer at net book value, not separately identified project financing: Kentucky Power’s associated book amount was approximately $536 million, with a $44 million annual asset-transfer rider approved for partial recovery. The December 2014 Wheeling Power acquisition had an approximately $550 million total transaction price; the cited regulatory materials do not characterize that amount as construction debt or project-finance proceeds. For the planned cooling-tower modernization, DOE lists $51.0 million of federal funding and $107.6 million of non-federal funding, for a total value of $158.6 million. — Source · confidence: medium
- Financing summary: The disclosed 2013 ownership transfer was an intercompany asset transfer at net book value, not separately identified project financing: Kentucky Power’s associated book amount was approximately $536 million, with a $44 million annual asset-transfer rider approved for partial recovery. The December 2014 Wheeling Power acquisition had an approximately $550 million total transaction price; the cited regulatory materials do not characterize that amount as construction debt or project-finance proceeds. For the planned cooling-tower modernization, DOE lists $51.0 million of federal funding and $107.6 million of non-federal funding, for a total value of $158.6 million. — Defense Production Act Title III Project Selections: Coal Fleet Projects and West Gateway Terminal | Department of Energy · confidence: medium
- Timeline: [{"event":"Construction and commercial operation","date":"1971","detail":"Mitchell Units 1 and 2 were placed in operation in 1971. The plant was built as a two-unit coal station."},{"event":"AEP Ohio transfer filing","date":"2012-12","detail":"Kentucky Power filed for approval to receive a one-half interest in Mitchell at net book value. AEP filings proposed separating Ohio Power’s generation assets and transferring the Mitchell interests to Kentucky Power and the other AEP affiliates."},{"event":"FERC generation-transfer approval","date":"2013-04-29","detail":"FERC approved the AEP generation-asset separation and the transfer structure under which Kentucky Power and the other AEP entities would receive Mitchell interests."},{"event":"Kentucky Power acquisition authorization","date":"2013-10-14","detail":"The Kentucky PSC authorized Kentucky Power to acquire a 50% interest in both Mitchell units, together with associated assets and liabilities, from AEP Ohio. The transfer was expected to close on December 31, 2013."},{"event":"Kentucky Power acquisition completed","date":"2013-12-31","detail":"Kentucky Power acquired a 50% undivided ownership interest in Mitchell. AEP Generation Resources acquired the other 50% interest after the AEP Ohio generation separation."},{"event":"Wheeling Power acquisition and ownership transfer","date":"2014-12-30","detail":"The West Virginia PSC approved transfer of an undivided 50% Mitchell interest to Wheeling Power for an approximately $550 million total transaction price. The operating agreement identifies AEP Generation Resources as the previous owner of Wheeling Power’s interest and states that it transferred the interest to Newco Wheeling, which merged into Wheeling Power, effective December 31, 2014."},{"event":"Operator transition","date":"2022-09","detail":"Under the Mitchell ownership arrangements, Wheeling Power replaced Kentucky Power as operator, while the companies continued as equal 50% owners."},{"event":"Continued-operation investment approval","date":"2025-12-30","detail":"The Kentucky PSC approved Kentucky Power’s environmental and non-environmental investments needed to continue taking 50% of Mitchell’s capacity and energy after December 31, 2028."},{"event":"Cooling-tower modernization","date":"2026","detail":"DOE selected Wheeling Power’s approximately $158.6 million mechanical-draft cooling-tower modernization project, including $51.0 million of federal funding and $107.6 million of non-federal funding. The project is intended to replace the nearly 60-year-old natural-draft structure and protect the station’s full generation capacity."}] — Source · confidence: medium
- Timeline: [{"event":"Construction and commercial operation","date":"1971","detail":"Mitchell Units 1 and 2 were placed in operation in 1971. The plant was built as a two-unit coal station."},{"event":"AEP Ohio transfer filing","date":"2012-12","detail":"Kentucky Power filed for approval to receive a one-half interest in Mitchell at net book value. AEP filings proposed separating Ohio Power’s generation assets and transferring the Mitchell interests to Kentucky Power and the other AEP affiliates."},{"event":"FERC generation-transfer approval","date":"2013-04-29","detail":"FERC approved the AEP generation-asset separation and the transfer structure under which Kentucky Power and the other AEP entities would receive Mitchell interests."},{"event":"Kentucky Power acquisition authorization","date":"2013-10-14","detail":"The Kentucky PSC authorized Kentucky Power to acquire a 50% interest in both Mitchell units, together with associated assets and liabilities, from AEP Ohio. The transfer was expected to close on December 31, 2013."},{"event":"Kentucky Power acquisition completed","date":"2013-12-31","detail":"Kentucky Power acquired a 50% undivided ownership interest in Mitchell. AEP Generation Resources acquired the other 50% interest after the AEP Ohio generation separation."},{"event":"Wheeling Power acquisition and ownership transfer","date":"2014-12-30","detail":"The West Virginia PSC approved transfer of an undivided 50% Mitchell interest to Wheeling Power for an approximately $550 million total transaction price. The operating agreement identifies AEP Generation Resources as the previous owner of Wheeling Power’s interest and states that it transferred the interest to Newco Wheeling, which merged into Wheeling Power, effective December 31, 2014."},{"event":"Operator transition","date":"2022-09","detail":"Under the Mitchell ownership arrangements, Wheeling Power replaced Kentucky Power as operator, while the companies continued as equal 50% owners."},{"event":"Continued-operation investment approval","date":"2025-12-30","detail":"The Kentucky PSC approved Kentucky Power’s environmental and non-environmental investments needed to continue taking 50% of Mitchell’s capacity and energy after December 31, 2028."},{"event":"Cooling-tower modernization","date":"2026","detail":"DOE selected Wheeling Power’s approximately $158.6 million mechanical-draft cooling-tower modernization project, including $51.0 million of federal funding and $107.6 million of non-federal funding. The project is intended to replace the nearly 60-year-old natural-draft structure and protect the station’s full generation capacity."}] — Source · confidence: medium
- Timeline: [{"event":"Construction and commercial operation","date":"1971","detail":"Mitchell Units 1 and 2 were placed in operation in 1971. The plant was built as a two-unit coal station."},{"event":"AEP Ohio transfer filing","date":"2012-12","detail":"Kentucky Power filed for approval to receive a one-half interest in Mitchell at net book value. AEP filings proposed separating Ohio Power’s generation assets and transferring the Mitchell interests to Kentucky Power and the other AEP affiliates."},{"event":"FERC generation-transfer approval","date":"2013-04-29","detail":"FERC approved the AEP generation-asset separation and the transfer structure under which Kentucky Power and the other AEP entities would receive Mitchell interests."},{"event":"Kentucky Power acquisition authorization","date":"2013-10-14","detail":"The Kentucky PSC authorized Kentucky Power to acquire a 50% interest in both Mitchell units, together with associated assets and liabilities, from AEP Ohio. The transfer was expected to close on December 31, 2013."},{"event":"Kentucky Power acquisition completed","date":"2013-12-31","detail":"Kentucky Power acquired a 50% undivided ownership interest in Mitchell. AEP Generation Resources acquired the other 50% interest after the AEP Ohio generation separation."},{"event":"Wheeling Power acquisition and ownership transfer","date":"2014-12-30","detail":"The West Virginia PSC approved transfer of an undivided 50% Mitchell interest to Wheeling Power for an approximately $550 million total transaction price. The operating agreement identifies AEP Generation Resources as the previous owner of Wheeling Power’s interest and states that it transferred the interest to Newco Wheeling, which merged into Wheeling Power, effective December 31, 2014."},{"event":"Operator transition","date":"2022-09","detail":"Under the Mitchell ownership arrangements, Wheeling Power replaced Kentucky Power as operator, while the companies continued as equal 50% owners."},{"event":"Continued-operation investment approval","date":"2025-12-30","detail":"The Kentucky PSC approved Kentucky Power’s environmental and non-environmental investments needed to continue taking 50% of Mitchell’s capacity and energy after December 31, 2028."},{"event":"Cooling-tower modernization","date":"2026","detail":"DOE selected Wheeling Power’s approximately $158.6 million mechanical-draft cooling-tower modernization project, including $51.0 million of federal funding and $107.6 million of non-federal funding. The project is intended to replace the nearly 60-year-old natural-draft structure and protect the station’s full generation capacity."}] — View Case Filings for: 2025-00175 · confidence: medium
- Timeline: [{"event":"Construction and commercial operation","date":"1971","detail":"Mitchell Units 1 and 2 were placed in operation in 1971. The plant was built as a two-unit coal station."},{"event":"AEP Ohio transfer filing","date":"2012-12","detail":"Kentucky Power filed for approval to receive a one-half interest in Mitchell at net book value. AEP filings proposed separating Ohio Power’s generation assets and transferring the Mitchell interests to Kentucky Power and the other AEP affiliates."},{"event":"FERC generation-transfer approval","date":"2013-04-29","detail":"FERC approved the AEP generation-asset separation and the transfer structure under which Kentucky Power and the other AEP entities would receive Mitchell interests."},{"event":"Kentucky Power acquisition authorization","date":"2013-10-14","detail":"The Kentucky PSC authorized Kentucky Power to acquire a 50% interest in both Mitchell units, together with associated assets and liabilities, from AEP Ohio. The transfer was expected to close on December 31, 2013."},{"event":"Kentucky Power acquisition completed","date":"2013-12-31","detail":"Kentucky Power acquired a 50% undivided ownership interest in Mitchell. AEP Generation Resources acquired the other 50% interest after the AEP Ohio generation separation."},{"event":"Wheeling Power acquisition and ownership transfer","date":"2014-12-30","detail":"The West Virginia PSC approved transfer of an undivided 50% Mitchell interest to Wheeling Power for an approximately $550 million total transaction price. The operating agreement identifies AEP Generation Resources as the previous owner of Wheeling Power’s interest and states that it transferred the interest to Newco Wheeling, which merged into Wheeling Power, effective December 31, 2014."},{"event":"Operator transition","date":"2022-09","detail":"Under the Mitchell ownership arrangements, Wheeling Power replaced Kentucky Power as operator, while the companies continued as equal 50% owners."},{"event":"Continued-operation investment approval","date":"2025-12-30","detail":"The Kentucky PSC approved Kentucky Power’s environmental and non-environmental investments needed to continue taking 50% of Mitchell’s capacity and energy after December 31, 2028."},{"event":"Cooling-tower modernization","date":"2026","detail":"DOE selected Wheeling Power’s approximately $158.6 million mechanical-draft cooling-tower modernization project, including $51.0 million of federal funding and $107.6 million of non-federal funding. The project is intended to replace the nearly 60-year-old natural-draft structure and protect the station’s full generation capacity."}] — Defense Production Act Title III Project Selections: Coal Fleet Projects and West Gateway Terminal | Department of Energy · confidence: medium
- Timeline.5: {"event":"Wheeling Power acquisition and ownership transfer","date":"2014-12-30","detail":"The West Virginia PSC approved transfer of an undivided 50% Mitchell interest to Wheeling Power for an approximately $550 million total transaction price. The operating agreement identifies AEP Generation Resources as the previous owner of Wheeling Power’s interest and states that it transferred the interest to Newco Wheeling, which merged into Wheeling Power, effective December 31, 2014."} — Source · confidence: medium
- Timeline.6: {"event":"Operator transition","date":"2022-09","detail":"Under the Mitchell ownership arrangements, Wheeling Power replaced Kentucky Power as operator, while the companies continued as equal 50% owners."} — Source · confidence: high
- Timeline.7: {"event":"Continued-operation investment approval","date":"2025-12-30","detail":"The Kentucky PSC approved Kentucky Power’s environmental and non-environmental investments needed to continue taking 50% of Mitchell’s capacity and energy after December 31, 2028."} — View Case Filings for: 2025-00175 · confidence: high
- Timeline.8: {"event":"Cooling-tower modernization","date":"2026","detail":"DOE selected Wheeling Power’s approximately $158.6 million mechanical-draft cooling-tower modernization project, including $51.0 million of federal funding and $107.6 million of non-federal funding. The project is intended to replace the nearly 60-year-old natural-draft structure and protect the station’s full generation capacity."} — Defense Production Act Title III Project Selections: Coal Fleet Projects and West Gateway Terminal | Department of Energy · confidence: high
- Commercial parties.1: {"relationship":"50% owner and current operator","name":"Wheeling Power Company","detail":"Acquired the other 50% interest through the transfer of AEP Generation Resources’ interest to Newco Wheeling, which merged into Wheeling Power effective December 31, 2014. Wheeling Power became the operator in September 2022.","official_url":"https://www.aep.com/"} — Source · confidence: high
- Commercial parties.2: {"relationship":"Predecessor owner and transferor of Kentucky Power’s interest","name":"Ohio Power Company / AEP Ohio","detail":"Owned the entire Mitchell station before the AEP generation-asset separation and transferred a 50% interest to Kentucky Power at net book value at the end of 2013.","official_url":"https://www.aepohio.com/"} — Source · confidence: high
- Commercial parties.4: {"relationship":"Parent company","name":"American Electric Power Company, Inc.","detail":"Parent of Kentucky Power and Wheeling Power and the corporate group responsible for the 2013–2014 generation-asset restructuring.","official_url":"https://www.aep.com/"} — Source · confidence: high
- Ownership interest pct: 50 — Source · confidence: high
- Prior owner: Ohio Power Company — Source · confidence: high
- Acquirer: Kentucky Power Company — Source · confidence: high
- Financing transaction type: royalty_financing — Source · confidence: high
- Substation: Kammer yard — American Electric Power to use helicopters to maintain some power line rights-of-way · confidence: medium
- Status date: 2026-06-05 — DOE Awards Grants to Upgrade AEP Plants · confidence: high
- Transmission owner: American Electric Power (AEP) — American Electric Power to use helicopters to maintain some power line rights-of-way · confidence: medium
- Grid role: Baseload, dispatchable generation capable of providing power around the clock. — DOE Awards Grants to Upgrade AEP Plants · confidence: high

## Timeline

- 2012-12 — AEP Ohio transfer filing
  Kentucky Power filed for approval to receive a one-half interest in Mitchell at net book value. AEP filings proposed separating Ohio Power’s generation assets and transferring the Mitchell interests to Kentucky Power and the other AEP affiliates.
  Source: Source (https://aep.com/assets/docs/investors/Filings/docs/2013subsidiaries/3Q13-KPCo.pdf)
- 2025-12-30 — Continued-operation investment approval
  The Kentucky PSC approved Kentucky Power’s environmental and non-environmental investments needed to continue taking 50% of Mitchell’s capacity and energy after December 31, 2028.
  Source: View Case Filings for: 2025-00175 (https://psc.ky.gov/Case/ViewCaseFilings/2025-00175)
- 2031-12-31 — Fuel conversion planned
  Mitchell (WV) is currently operating; coal operations are scheduled to cease by December 31, 2031, with no post-2031 project has been approved. Evaluated options include conversion to 100% natural gas, 40% gas co-fire followed by retirement, or replacement with a new combined-cycle gas plant.
  Source: Source (https://psc.ky.gov/pscscf/2025%20Cases/2025-00175//20251230_PSC_ORDER.pdf)

## Sources

- [Kentucky Power](https://www.kentuckypower.com/) — kentuckypower.com · tier other
- [Asset Appendix Report - MBR](https://mbrweb.ferc.gov/SearchMBRAssetAppendix/AssetAppendixDetails?page=2&AssetAppendixId=3827) — mbrweb.ferc.gov · tier regulatory
- [Source](https://psc.ky.gov/agencies/psc/press/122025/1230_r01.pdf) — psc.ky.gov · tier regulatory
- [Mitchell Plant](https://www.aep.com/environment/ccr/mitchell/) — aep.com · tier other
- [View Case Filings for: 2025-00175](https://psc.ky.gov/Case/ViewCaseFilings/2025-00175) — psc.ky.gov · tier regulatory
- [Source](https://www.energy.gov/sites/default/files/2025-07/Exhibits%2044%20-66%20PIO%20Request%20for%20Rehearing%20of%20Order%20No.%20202-25-3.pdf) — energy.gov · tier regulatory
- [AEP.com](https://www.aep.com/) — aep.com · tier other
- [American Electric Power to use helicopters to maintain some power line rights-of-way](https://www.appalachianpower.com/company/news/view?releaseID=8959) — appalachianpower.com · tier other
- [Source](https://docs.aep.com/docs/requiredpostings/ccr/2018/11-14-2018/ML-BAP-LocationRestrictionsRpt-101618.pdf) — docs.aep.com · tier other
- [Mitchell Station Units 1 and 2 Wet Flue Gas Desulfurization Systems](https://www.babcock.com/assets/PDF-Downloads/Success-Stories/PCH-570_Mitchell-Wet-FGD.pdf) — babcock.com · tier other
- [Wet Scrubber Flue Gas Desulfurization (FGD)](https://www.babcock.com/home/products/wet-scrubbers-fgd) — babcock.com · tier other
- [B&W Clean Power Production Case Studies » Babcock & Wilcox](https://www.babcock.com/home/about/resources/success-stories/mitchell-station) — babcock.com · tier other
- [Defense Production Act Title III Project Selections: Coal Fleet Projects and West Gateway Terminal | Department of Energy](https://www.energy.gov/hgeo/defense-production-act-title-iii-project-selections-coal-fleet-projects-and-west-gateway) — energy.gov · tier regulatory
- [Source](https://www.aep.com/docs/investors/fercfilings/docs/2023/Wheeling%20Power%20Company.pdf) — aep.com · tier other
- [I](https://psc.ky.gov/pscecf/2017-00179/slsharp%40aep.com/08282017040336/KPCO_R_AG_1_021_Attachment1.pdf) — psc.ky.gov · tier regulatory
- [Source](https://psc.ky.gov/pscscf/2025%20Cases/2025-00175//20251230_PSC_ORDER.pdf) — psc.ky.gov · tier regulatory
- [Source](https://energy.gov/sites/default/files/2025-07/Exhibits%2044%20-66%20PIO%20Request%20for%20Rehearing%20of%20Order%20No.%20202-25-3.pdf) — energy.gov · tier regulatory
- [PSC Approves Acquisition of Mitchell Power Plant by ...](https://www.psc.state.wv.us/press/2014/Press_20141230.pdf) — psc.state.wv.us · tier other
- [Source](https://aep.com/assets/docs/investors/Filings/docs/2013subsidiaries/3Q13-KPCo.pdf) — aep.com · tier other
- [Kentucky Power Files Asset Transfer Settlement Agreement](https://www.kentuckypower.com/company/news/view?releaseID=2787) — kentuckypower.com · tier other
- [Source](https://psc.ky.gov/agencies/psc/press/102013/1007_r01.pdf) — psc.ky.gov · tier regulatory
- [5:001, 2013.](https://psc.ky.gov/order_vault/orders_2013/201200578_02062013.pdf) — psc.ky.gov · tier regulatory
- [DOE Awards Grants to Upgrade AEP Plants](https://www.aep.com/news/stories/view/11983/) — aep.com · tier other

## Data quality

- Capacity figures use different bases: the EIA nameplate figure is 1,632.6 MW, the 2013 transfer documents describe Kentucky Power’s 50% share as 780 MW, and the DOE describes the full station as approximately 1,600 MW. No completed retirement or repowering is established.

---

Canonical page: https://askthegrid.com/assets/facilities/mitchell-wv