# Moselle

MISO asset profile · https://askthegrid.com/assets/facilities/moselle

## Current generation inventory

EIA plant 2070 · Inventory reporting month: 2026-08.

- natural gas: 510.5 MW operating nameplate
- Capacity basis: operating_generator_nameplate_mw
- Source inventory: [EIA-860M workbook (preliminary)](https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx)
- Inventory retrieved: 2026-10-10T02:12:40.665346+00:00
- Filed coordinate (longitude, latitude): -89.3004, 31.528
- OSM extract: 2026-10-08T20:21:06Z
- OSM mapped edit: 2023-04-21 17:18:44+00:00
- Map prepared: 2026-10-10T02:28:21.266283+00:00

Battery power (MW) and stored energy (MWh) are separate measures. Shared physical-site membership does not establish electrical connectivity, settlement or a common export limit.

## Reviewed overview

Moselle Generating Station in Jones County, Mississippi, is a five-unit gas-fired plant owned by Cooperative Energy. Its first two steam units were repowered as combined cycle around GE 7EA combustion turbines and heat recovery steam generators supplied by Vogt, a project engineered with Burns & McDonnell that went into commercial operation in 2012 and added about 150 MW and a 35 percent efficiency gain.

## Reviewed metrics

- **Nameplate capacity:** 510.5 MW — Canonical EIA plant baseline.
- **Registry anchor:** Plant 2070 — plant-2070

## Facts

- **Technology:** Natural Gas Fired Combined Cycle, Natural Gas Steam Turbine, Natural Gas Fired Combustion Turbine
- **Operator:** Cooperative Energy

## Related parties

- **Owner / operator:** Cooperative Energy — owner ([source](https://cooperativeenergy.com))
- **Former owner:** South Mississippi Electric Power Association — former_owner
- **EPC contractor:** Burns & McDonnell — epc_contractor ([source](https://www.burnsmcd.com))

## Sources

- [powermag.com](https://www.powermag.com/shifting-from-coal-to-gas-one-co-ops-award-winning-journey/) — powermag.com · public_source — Source retained for exact-record publication review.
- [turbomachinerymag.com](https://www.turbomachinerymag.com/view/moselle-repower-project) — turbomachinerymag.com · public_source — Source retained for exact-record publication review.
- [wdam.com](https://www.wdam.com/story/19667925/moselle-power-plant-enhancement-project-nears-completion/) — wdam.com · public_source — Source retained for exact-record publication review.

---

Canonical page: https://askthegrid.com/assets/facilities/moselle
Website: [Cooperative Energy](https://cooperativeenergy.com)

Source: Ask the Grid — https://askthegrid.com/
