# Mustang Two

CAISO Solar Photovoltaic · https://askthegrid.com/assets/facilities/mustang-two

Mustang Two is a solar power facility with 150 MW of EIA-reported operating capacity in Kings County, California, registered as EIA Plant ID 62015. RE Mustang Two LLC is the registered plant entity or operator. Solar Frontier Americas acquired the project from Recurrent Energy LLC in 2018. Commercial operation began in 2020.

## Key facts

- Technology: Solar Photovoltaic
- Power capacity: 150 MW
- Commercial operation: 2020
- Operating status: operating

## Grid and market context

- ISO/RTO: CAISO
- Balancing authority: CAISO (CISO)
- Interconnection voltage: 230 kV

## Source-backed facts

- Owner logo domain: idemitsurenewables.com — Solar Frontier Americas Changes Name to Idemitsu... · confidence: high
- Identifiers: [{"value":"62015","system":"EIA plant ID"},{"value":"M2WHI (100 MW)","system":"EIA generator ID"},{"value":"M2BAR (50 MW)","system":"EIA generator ID"},{"value":"CAISO / CISO","system":"ISO/RTO"},{"value":"Mustang 2 Whirlaway","system":"CAISO market-resource name"},{"value":"Mustang 2 Barbaro","system":"CAISO market-resource name"},{"value":"C010565","system":"FERC entity ID"},{"value":"ER20-1537-000","system":"FERC market-based-rate docket"},{"value":"1248181","system":"FERC MBR submission ID"},{"value":"2017101061","system":"California CEQA SCH number"}] — Federal Register :: RE Mustang Two Barbaro LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization · confidence: medium
- Identifiers: [{"value":"62015","system":"EIA plant ID"},{"value":"M2WHI (100 MW)","system":"EIA generator ID"},{"value":"M2BAR (50 MW)","system":"EIA generator ID"},{"value":"CAISO / CISO","system":"ISO/RTO"},{"value":"Mustang 2 Whirlaway","system":"CAISO market-resource name"},{"value":"Mustang 2 Barbaro","system":"CAISO market-resource name"},{"value":"C010565","system":"FERC entity ID"},{"value":"ER20-1537-000","system":"FERC market-based-rate docket"},{"value":"1248181","system":"FERC MBR submission ID"},{"value":"2017101061","system":"California CEQA SCH number"}] — Curtailed · confidence: medium
- Identifiers: [{"value":"62015","system":"EIA plant ID"},{"value":"M2WHI (100 MW)","system":"EIA generator ID"},{"value":"M2BAR (50 MW)","system":"EIA generator ID"},{"value":"CAISO / CISO","system":"ISO/RTO"},{"value":"Mustang 2 Whirlaway","system":"CAISO market-resource name"},{"value":"Mustang 2 Barbaro","system":"CAISO market-resource name"},{"value":"C010565","system":"FERC entity ID"},{"value":"ER20-1537-000","system":"FERC market-based-rate docket"},{"value":"1248181","system":"FERC MBR submission ID"},{"value":"2017101061","system":"California CEQA SCH number"}] — RE Mustang Two Solar Project · confidence: medium
- Official project url: https://idemitsurenewables.com/projects/ — Projects – Idemitsu Renewables · confidence: high
- Owner name: Idemitsu Renewables — Projects – Idemitsu Renewables · confidence: medium
- Description: Mustang Two is an operational solar photovoltaic plant in Kings County, California, with two generating units totaling 150 MW of nameplate capacity. The project is listed by Idemitsu Renewables as Mustang Two, 210 MWp, in service, and public plant records identify RE Mustang Two LLC as the EIA operator. — Projects – Idemitsu Renewables · confidence: high
- Parties: [{"relationship":"Public owner and operator; successor to Solar Frontier Americas","name":"Idemitsu Renewables","official_url":"https://idemitsurenewables.com/"},{"relationship":"EIA operator and project company","name":"RE Mustang Two LLC","official_url":null},{"relationship":"Original developer; development manager before construction","name":"Recurrent Energy LLC","official_url":"https://recurrentenergy.com/"},{"relationship":"Seller and parent of original developer","name":"Canadian Solar Inc.","official_url":"https://www.canadiansolar.com/"},{"relationship":"Historical acquirer, construction manager, and former owner/operator; renamed Idemitsu Renewables","name":"Solar Frontier Americas","official_url":"https://idemitsurenewables.com/"},{"relationship":"Construction-to-term lender","name":"KeyBank N.A.","official_url":"https://www.key.com/"},{"relationship":"Construction-to-term lender","name":"Mizuho Bank, Ltd.","official_url":"https://www.mizuhogroup.com/"},{"relationship":"Tax-equity investor","name":"Morgan Stanley Renewables Inc.","official_url":"https://www.morganstanley.com/"},{"relationship":"Power purchaser","name":"Peninsula Clean Energy","official_url":"https://peninsulacleanenergy.com/"},{"relationship":"Power purchaser","name":"Modesto Irrigation District","official_url":"https://www.mid.org/"},{"relationship":"California environmental-review lead agency","name":"Kings County","official_url":"https://www.countyofkingsca.gov/"}] — Solar Frontier Americas Acquires Canadian Solar’s 210 MWp Mustang Two Solar Project - Recurrent Energy · confidence: medium
- Parties: [{"relationship":"Public owner and operator; successor to Solar Frontier Americas","name":"Idemitsu Renewables","official_url":"https://idemitsurenewables.com/"},{"relationship":"EIA operator and project company","name":"RE Mustang Two LLC","official_url":null},{"relationship":"Original developer; development manager before construction","name":"Recurrent Energy LLC","official_url":"https://recurrentenergy.com/"},{"relationship":"Seller and parent of original developer","name":"Canadian Solar Inc.","official_url":"https://www.canadiansolar.com/"},{"relationship":"Historical acquirer, construction manager, and former owner/operator; renamed Idemitsu Renewables","name":"Solar Frontier Americas","official_url":"https://idemitsurenewables.com/"},{"relationship":"Construction-to-term lender","name":"KeyBank N.A.","official_url":"https://www.key.com/"},{"relationship":"Construction-to-term lender","name":"Mizuho Bank, Ltd.","official_url":"https://www.mizuhogroup.com/"},{"relationship":"Tax-equity investor","name":"Morgan Stanley Renewables Inc.","official_url":"https://www.morganstanley.com/"},{"relationship":"Power purchaser","name":"Peninsula Clean Energy","official_url":"https://peninsulacleanenergy.com/"},{"relationship":"Power purchaser","name":"Modesto Irrigation District","official_url":"https://www.mid.org/"},{"relationship":"California environmental-review lead agency","name":"Kings County","official_url":"https://www.countyofkingsca.gov/"}] — RE Mustang Two Solar Project · confidence: medium
- Identifiers.4: {"value":"Mustang 2 Whirlaway","system":"CAISO market-resource name"} — Curtailed · confidence: medium
- Identifiers.5: {"value":"Mustang 2 Barbaro","system":"CAISO market-resource name"} — Curtailed · confidence: medium
- Identifiers.7: {"value":"ER20-1537-000","system":"FERC market-based-rate docket"} — Federal Register :: RE Mustang Two Barbaro LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization · confidence: high
- Identifiers.9: {"value":"2017101061","system":"California CEQA SCH number"} — RE Mustang Two Solar Project · confidence: high
- Parties.0: {"relationship":"Public owner and operator; successor to Solar Frontier Americas","name":"Idemitsu Renewables","official_url":"https://idemitsurenewables.com/"} — Solar Frontier Americas Changes Name to Idemitsu... · confidence: medium
- Parties.2: {"relationship":"Original developer; development manager before construction","name":"Recurrent Energy LLC","official_url":"https://recurrentenergy.com/"} — Solar Frontier Americas Acquires Canadian Solar’s 210 MWp Mustang Two Solar Project - Recurrent Energy · confidence: high
- Parties.3: {"relationship":"Seller and parent of original developer","name":"Canadian Solar Inc.","official_url":"https://www.canadiansolar.com/"} — Solar Frontier Americas Acquires Canadian Solar’s 210 MWp Mustang Two Solar Project - Recurrent Energy · confidence: high
- Parties.4: {"relationship":"Historical acquirer, construction manager, and former owner/operator; renamed Idemitsu Renewables","name":"Solar Frontier Americas","official_url":"https://idemitsurenewables.com/"} — Solar Frontier Americas Acquires Canadian Solar’s 210 MWp Mustang Two Solar Project - Recurrent Energy · confidence: high
- Parties.8: {"relationship":"Power purchaser","name":"Peninsula Clean Energy","official_url":"https://peninsulacleanenergy.com/"} — Solar Frontier Americas Acquires Canadian Solar’s 210 MWp Mustang Two Solar Project - Recurrent Energy · confidence: high
- Parties.8: {"relationship":"Power purchaser","name":"Peninsula Clean Energy","official_url":"https://peninsulacleanenergy.com/"} — Projects – Idemitsu Renewables · confidence: high
- Parties.9: {"relationship":"Power purchaser","name":"Modesto Irrigation District","official_url":"https://www.mid.org/"} — Solar Frontier Americas Acquires Canadian Solar’s 210 MWp Mustang Two Solar Project - Recurrent Energy · confidence: high
- Parties.9: {"relationship":"Power purchaser","name":"Modesto Irrigation District","official_url":"https://www.mid.org/"} — Projects – Idemitsu Renewables · confidence: high
- Parties.10: {"relationship":"California environmental-review lead agency","name":"Kings County","official_url":"https://www.countyofkingsca.gov/"} — RE Mustang Two Solar Project · confidence: high
- Interconnection: PG&E existing Mustang Switching Station, via a new generation intertie line. — RE Mustang Two Solar Project - CEQAnet - CA.gov · confidence: high
- Unit configuration: Two solar photovoltaic generating units: M2WHI (100 MW) and M2BAR (50 MW), totaling 150 MW. — MBR | Index · confidence: medium
- Commercial operation date: 2020-11-11 — 100-MW Mustang Two Whirlaway Solar Farm Comes Online · confidence: medium
- Power mw: 150 — MBR | Index · confidence: medium
- Unit count: 2 — MBR | Index · confidence: high
- Construction scope: A 150 MWac ground-mounted solar photovoltaic development in Kings County on approximately 1,800 acres, using solar-tracking technology and a new approximately 1.75-mile 230-kV generation intertie to PG&E’s Mustang Switching Station. The plant comprises the 100 MWac Mustang Two Whirlaway and 50 MWac Mustang Two Barbaro portions. Project records state that modules and inverters were procured, but do not disclose installed equipment counts or models. A trade report associates Blattner Energy with EPC work and Power Electronics with inverters, without providing a model or count. — Source · confidence: medium
- Construction scope: A 150 MWac ground-mounted solar photovoltaic development in Kings County on approximately 1,800 acres, using solar-tracking technology and a new approximately 1.75-mile 230-kV generation intertie to PG&E’s Mustang Switching Station. The plant comprises the 100 MWac Mustang Two Whirlaway and 50 MWac Mustang Two Barbaro portions. Project records state that modules and inverters were procured, but do not disclose installed equipment counts or models. A trade report associates Blattner Energy with EPC work and Power Electronics with inverters, without providing a model or count. — Source · confidence: medium
- Construction scope: A 150 MWac ground-mounted solar photovoltaic development in Kings County on approximately 1,800 acres, using solar-tracking technology and a new approximately 1.75-mile 230-kV generation intertie to PG&E’s Mustang Switching Station. The plant comprises the 100 MWac Mustang Two Whirlaway and 50 MWac Mustang Two Barbaro portions. Project records state that modules and inverters were procured, but do not disclose installed equipment counts or models. A trade report associates Blattner Energy with EPC work and Power Electronics with inverters, without providing a model or count. — Source · confidence: medium
- Construction scope: A 150 MWac ground-mounted solar photovoltaic development in Kings County on approximately 1,800 acres, using solar-tracking technology and a new approximately 1.75-mile 230-kV generation intertie to PG&E’s Mustang Switching Station. The plant comprises the 100 MWac Mustang Two Whirlaway and 50 MWac Mustang Two Barbaro portions. Project records state that modules and inverters were procured, but do not disclose installed equipment counts or models. A trade report associates Blattner Energy with EPC work and Power Electronics with inverters, without providing a model or count. — description: Mustang Two Whirlaway, a 100-megawatt solar project in Kings County, officially started operating Wednesday and will generate clean and affordable power title: 100-MW Mustang Two Whirlaway Solar Farm Comes Online - Peninsula Clean Energy image: https://www.peninsulacleanenergy.com/wp-content/uploads/2025/01/PCE-social-share.png · confidence: medium
- Construction scope: A 150 MWac ground-mounted solar photovoltaic development in Kings County on approximately 1,800 acres, using solar-tracking technology and a new approximately 1.75-mile 230-kV generation intertie to PG&E’s Mustang Switching Station. The plant comprises the 100 MWac Mustang Two Whirlaway and 50 MWac Mustang Two Barbaro portions. Project records state that modules and inverters were procured, but do not disclose installed equipment counts or models. A trade report associates Blattner Energy with EPC work and Power Electronics with inverters, without providing a model or count. — Titan, Mustang and West of Pecos solar power plants move forward - pv magazine USA · confidence: medium
- Kind: solar — Source · confidence: high
- Description: Mustang Two is an operational solar photovoltaic plant in Kings County, California, with two generating units totaling 150 MW of nameplate capacity in public plant records. Idemitsu Renewables lists the project as a 210 MWp facility in service. Recurrent Energy developed the project, and Canadian Solar completed its sale to Solar Frontier Americas in December 2018; Solar Frontier Americas later changed its name to Idemitsu Renewables. EIA records identify RE Mustang Two LLC as the operator, while project materials identify Solar Frontier Americas as the historical owner and operator. — Source · confidence: medium
- Description: Mustang Two is an operational solar photovoltaic plant in Kings County, California, with two generating units totaling 150 MW of nameplate capacity in public plant records. Idemitsu Renewables lists the project as a 210 MWp facility in service. Recurrent Energy developed the project, and Canadian Solar completed its sale to Solar Frontier Americas in December 2018; Solar Frontier Americas later changed its name to Idemitsu Renewables. EIA records identify RE Mustang Two LLC as the operator, while project materials identify Solar Frontier Americas as the historical owner and operator. — Source · confidence: medium
- Description: Mustang Two is an operational solar photovoltaic plant in Kings County, California, with two generating units totaling 150 MW of nameplate capacity in public plant records. Idemitsu Renewables lists the project as a 210 MWp facility in service. Recurrent Energy developed the project, and Canadian Solar completed its sale to Solar Frontier Americas in December 2018; Solar Frontier Americas later changed its name to Idemitsu Renewables. EIA records identify RE Mustang Two LLC as the operator, while project materials identify Solar Frontier Americas as the historical owner and operator. — Source · confidence: medium
- Quality notes: ["Reported capacity varies by source and measurement basis: the public plant record states 150 MW of nameplate capacity, Idemitsu lists 210 MWp and 140 MWac, and the 2018 sale announcement states 150 MWac/210 MWp.","The disclosed approximately $176 million amount is a construction-to-term financing facility, and the up-to-$120 million amount is a tax-equity commitment; neither figure is identified as sale consideration. The sale announcement does not disclose transaction consideration.","The cited materials do not provide an exact financing-close date, construction-start date, or actual commercial-operation date. No expansion, retirement, or repowering milestone is documented for this exact Mustang Two project in the cited materials."] — Source · confidence: medium
- Quality notes: ["Reported capacity varies by source and measurement basis: the public plant record states 150 MW of nameplate capacity, Idemitsu lists 210 MWp and 140 MWac, and the 2018 sale announcement states 150 MWac/210 MWp.","The disclosed approximately $176 million amount is a construction-to-term financing facility, and the up-to-$120 million amount is a tax-equity commitment; neither figure is identified as sale consideration. The sale announcement does not disclose transaction consideration.","The cited materials do not provide an exact financing-close date, construction-start date, or actual commercial-operation date. No expansion, retirement, or repowering milestone is documented for this exact Mustang Two project in the cited materials."] — Source · confidence: medium
- Quality notes: ["Reported capacity varies by source and measurement basis: the public plant record states 150 MW of nameplate capacity, Idemitsu lists 210 MWp and 140 MWac, and the 2018 sale announcement states 150 MWac/210 MWp.","The disclosed approximately $176 million amount is a construction-to-term financing facility, and the up-to-$120 million amount is a tax-equity commitment; neither figure is identified as sale consideration. The sale announcement does not disclose transaction consideration.","The cited materials do not provide an exact financing-close date, construction-start date, or actual commercial-operation date. No expansion, retirement, or repowering milestone is documented for this exact Mustang Two project in the cited materials."] — Source · confidence: medium
- Financing summary: The project closed an approximately $176 million construction-to-term facility provided by KeyBank N.A. and Mizuho Bank, Ltd., together with up to $120 million of tax-equity financing committed by Morgan Stanley Renewables Inc. The financing disclosure does not state an exact month or year in the available record. The December 2018 sale announcement identifies the buyer and seller but does not disclose sale consideration. — Source · confidence: medium
- Timeline: [{"event":"Project sale and acquisition","date":"2018-12-18","detail":"Canadian Solar announced that its wholly owned subsidiary Recurrent Energy had completed the sale of the 150 MWac/210 MWp Mustang Two project to Solar Frontier Americas. Recurrent Energy continued development management, while Solar Frontier Americas assumed financing and construction management."},{"event":"Construction-to-term and tax-equity financing","date":null,"detail":"During construction before the planned 2020 commercial-operation date, the project closed an approximately $176 million construction-to-term facility with KeyBank N.A. and Mizuho Bank, Ltd.; Morgan Stanley Renewables Inc. committed up to $120 million of tax equity."},{"event":"Construction","date":null,"detail":"The project was under construction on a roughly 1,400-acre Kings County site, with Solar Frontier Americas financing and managing construction."},{"event":"Planned commercial operation","date":"2020","detail":"Project materials stated that Mustang Two was slated to achieve commercial operation in 2020; the cited materials do not provide a definitive actual commercial-operation date."},{"event":"Name change of historical owner/operator","date":"2020-06-22","detail":"Solar Frontier Americas announced that it was changing its name to Idemitsu Renewables."},{"event":"In-service status","date":null,"detail":"Idemitsu Renewables currently lists Mustang Two as a 210 MWp project in service; public plant records identify RE Mustang Two LLC as the operator."}] — Source · confidence: medium
- Timeline: [{"event":"Project sale and acquisition","date":"2018-12-18","detail":"Canadian Solar announced that its wholly owned subsidiary Recurrent Energy had completed the sale of the 150 MWac/210 MWp Mustang Two project to Solar Frontier Americas. Recurrent Energy continued development management, while Solar Frontier Americas assumed financing and construction management."},{"event":"Construction-to-term and tax-equity financing","date":null,"detail":"During construction before the planned 2020 commercial-operation date, the project closed an approximately $176 million construction-to-term facility with KeyBank N.A. and Mizuho Bank, Ltd.; Morgan Stanley Renewables Inc. committed up to $120 million of tax equity."},{"event":"Construction","date":null,"detail":"The project was under construction on a roughly 1,400-acre Kings County site, with Solar Frontier Americas financing and managing construction."},{"event":"Planned commercial operation","date":"2020","detail":"Project materials stated that Mustang Two was slated to achieve commercial operation in 2020; the cited materials do not provide a definitive actual commercial-operation date."},{"event":"Name change of historical owner/operator","date":"2020-06-22","detail":"Solar Frontier Americas announced that it was changing its name to Idemitsu Renewables."},{"event":"In-service status","date":null,"detail":"Idemitsu Renewables currently lists Mustang Two as a 210 MWp project in service; public plant records identify RE Mustang Two LLC as the operator."}] — Source · confidence: medium
- Timeline: [{"event":"Project sale and acquisition","date":"2018-12-18","detail":"Canadian Solar announced that its wholly owned subsidiary Recurrent Energy had completed the sale of the 150 MWac/210 MWp Mustang Two project to Solar Frontier Americas. Recurrent Energy continued development management, while Solar Frontier Americas assumed financing and construction management."},{"event":"Construction-to-term and tax-equity financing","date":null,"detail":"During construction before the planned 2020 commercial-operation date, the project closed an approximately $176 million construction-to-term facility with KeyBank N.A. and Mizuho Bank, Ltd.; Morgan Stanley Renewables Inc. committed up to $120 million of tax equity."},{"event":"Construction","date":null,"detail":"The project was under construction on a roughly 1,400-acre Kings County site, with Solar Frontier Americas financing and managing construction."},{"event":"Planned commercial operation","date":"2020","detail":"Project materials stated that Mustang Two was slated to achieve commercial operation in 2020; the cited materials do not provide a definitive actual commercial-operation date."},{"event":"Name change of historical owner/operator","date":"2020-06-22","detail":"Solar Frontier Americas announced that it was changing its name to Idemitsu Renewables."},{"event":"In-service status","date":null,"detail":"Idemitsu Renewables currently lists Mustang Two as a 210 MWp project in service; public plant records identify RE Mustang Two LLC as the operator."}] — Source · confidence: medium

## Timeline

- 2020 — Planned commercial operation
  Project materials stated that Mustang Two was slated to achieve commercial operation in 2020; the cited materials do not provide a definitive actual commercial-operation date.
  Source: Source (https://idemitsurenewables.com/author/idemitsu)
- 2020-06-22 — Name change of historical owner/operator
  Solar Frontier Americas announced that it was changing its name to Idemitsu Renewables.
  Source: Source (https://idemitsurenewables.com/solar-frontier-americas-changes-name-to-idemitsu-renewables)

## Sources

- [Solar Frontier Americas Changes Name to Idemitsu ...](https://idemitsurenewables.com/solar-frontier-americas-changes-name-to-idemitsu-renewables/) — idemitsurenewables.com · tier other
- [Federal Register :: RE Mustang Two Barbaro LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket Section 204 Authorization](https://www.federalregister.gov/documents/2020/04/17/2020-08157/re-mustang-two-barbaro-llc-supplemental-notice-that-initial-market-based-rate-filing-includes) — federalregister.gov · tier regulatory
- [Curtailed](https://www.caiso.com/documents/curtailed-non-operational-generator-am-report-20250417.xlsx) — caiso.com · tier other
- [RE Mustang Two Solar Project](https://ceqanet.lci.ca.gov/2017101061) — ceqanet.lci.ca.gov · tier regulatory
- [Projects](https://idemitsurenewables.com/projects/) — idemitsurenewables.com · tier other
- [Solar Frontier Americas Acquires Canadian Solar’s 210 MWp Mustang Two Solar Project - Recurrent Energy](https://recurrentenergy.com/solar-frontier-americas-mustang-two/) — recurrentenergy.com · tier other
- [Solar Frontier Americas Acquires Canadian Solar’s 210 MWp Mustang Two Solar Project – Idemitsu Renewables](https://idemitsurenewables.com/solar-frontier-americas-acquires-canadian-solars-210-mwp-mustang-two-solar-project/) — idemitsurenewables.com · tier other
- [MBR | Index](https://mbrweb.ferc.gov/SearchlkpEIA/Index?page=469) — mbrweb.ferc.gov · tier regulatory
- [100-MW Mustang Two Whirlaway Solar Farm Comes Online](https://www.powermag.com/press-releases/100-mw-mustang-two-whirlaway-solar-farm-comes-online/) — powermag.com · tier other
- [Projects – Idemitsu Renewables](https://idemitsurenewables.com/projects) — idemitsurenewables.com · tier other
- [Source](https://mid.granicus.com/MetaViewer.php?view_id=5&clip_id=206&meta_id=17692) — mid.granicus.com · tier other
- [description: Mustang Two Whirlaway, a 100-megawatt solar project in Kings County, officially started operating Wednesday and will generate clean and affordable power title: 100-MW Mustang Two Whirlaway Solar Farm Comes Online - Peninsula Clean Energy image: https://www.peninsulacleanenergy.com/wp-content/uploads/2025/01/PCE-social-share.png](https://www.peninsulacleanenergy.com/news-releases/100-mw-mustang-two-whirlaway-solar-farm-comes-online/) — peninsulacleanenergy.com · tier other
- [Titan, Mustang and West of Pecos solar power plants move forward - pv magazine USA](https://pv-magazine-usa.com/2020/01/08/titan-mustang-and-west-of-pecos-solar-power-plants-move-forward/) — pv-magazine-usa.com · tier other
- [Source](https://recurrentenergy.com/solar-frontier-americas-mustang-two) — recurrentenergy.com · tier other
- [Source](https://idemitsurenewables.com/solar-frontier-americas-changes-name-to-idemitsu-renewables) — idemitsurenewables.com · tier other
- [Source](https://idemitsurenewables.com/author/idemitsu) — idemitsurenewables.com · tier other
- [Announced Resource Retirement and Mothball List posted](https://www.caiso.com/notices/announced-resource-retirement-and-mothball-list-posted-4) — caiso.com · tier other

## Data quality

- The sale announcement does not disclose transaction consideration. The cited materials do not provide an exact financing-close date, construction-start date, or actual commercial-operation date. No expansion, retirement, or repowering milestone is documented for this exact Mustang Two project in the cited materials.

---

Canonical page: https://askthegrid.com/assets/facilities/mustang-two

Source: Ask the Grid — https://askthegrid.com/
