# NAEA Ocean Peaking Power LLC

PJM Natural Gas Fired Combustion Turbine · https://askthegrid.com/assets/facilities/naea-ocean-peaking-power-llc

NAEA Ocean Peaking Power LLC is a natural gas-fired power facility with 397.8 MW of EIA-reported nameplate capacity in Ocean County, New Jersey, registered as EIA Plant ID 55938. NAEA Ocean Peaking Power LLC is the public owner or developer; Essential Power Operating Company, LLC is the registered plant entity or operator. Commercial operation began in May 2003. Its grid role is peaking generation; the plant consists of combustion turbines identified as operating units and has a one-hour cold-shutdown-to-full-load time.
LAKEWOOD18 KV OCEAN C1 · 230 kV · Jersey Central Power & Light Co.

## Key facts

- Technology: Natural Gas Fired Combustion Turbine
- Power capacity: 397.8 MW
- Operating status: operating

## Grid and market context

- ISO/RTO: PJM
- Balancing authority: PJM Interconnection, LLC (PJM)

## Source-backed facts

- Identifiers: [{"value":"55938","system":"EIA plant ID"},{"value":"60789","system":"EIA utility/operator ID"},{"value":"PJM Interconnection, LLC","system":"ISO/RTO balancing authority"},{"value":"OPP3","system":"EIA generator ID"},{"value":"OPP4","system":"EIA generator ID"},{"value":"ER02-2080-000","system":"FERC MBR docket"},{"value":"ER11-2968-000","system":"FERC tariff docket"},{"value":"ER12-809-000","system":"FERC notice-of-succession docket"},{"value":"C001334","system":"FERC company identifier"},{"value":"10797","system":"FERC MBR asset appendix serial"},{"value":"PJM East; AP South; 5004/5005","system":"PJM market submarkets"}] — MBR | Asset Appendix Report · confidence: medium
- Owner name: NAEA Ocean Peaking Power LLC — NAEA Ocean Peaking power station - Global Energy Monitor · confidence: medium
- Description: NAEA Ocean Peaking Power LLC (EIA plant 55938) is an operating natural-gas power plant at 123 Energy Way in Lakewood, Ocean County, New Jersey. It entered operation in May 2003 and is located in the PJM balancing area. EIA generator records identify two operating natural-gas-fired combustion turbines, OPP3 and OPP4; the FERC asset appendix lists each at 191.5 MW. — MBR | Asset Appendix Report · confidence: medium
- Parties: [{"relationship":"Legal plant owner","name":"NAEA Ocean Peaking Power LLC","official_url":null},{"relationship":"Operator / utility","name":"Essential Power Operating Company, LLC","official_url":null},{"relationship":"FERC registered filing entity and affiliate controller","name":"Essential Power OPP, LLC","official_url":null},{"relationship":"Historical owner / portfolio acquirer, 2011–2016","name":"The Carlyle Group","official_url":"https://www.carlyle.com"},{"relationship":"Historical portfolio owner / seller","name":"IFM Investors","official_url":null},{"relationship":"Historical owner/operator, 2016–2019","name":"Nautilus Power LLC","official_url":null},{"relationship":"EPC contractor","name":"CH2M Hill Companies","official_url":"https://www.jacobs.com/newsroom/press-release/jacobs-completes-ch2m-acquisition-creating-15-billion-professional-services"},{"relationship":"Gas-turbine and electric-generator OEM","name":"GE Power, now GE Vernova","official_url":"https://www.gevernova.com/gas-power/products/gas-turbines/7f"}] — Power plant profile: Ocean Peaking Power Plant, US · confidence: medium
- Identifiers.5: {"value":"ER02-2080-000","system":"FERC MBR docket"} — MBR | Asset Appendix Report · confidence: high
- Identifiers.8: {"value":"C001334","system":"FERC company identifier"} — MBR | Asset Appendix Report · confidence: high
- Identifiers.9: {"value":"10797","system":"FERC MBR asset appendix serial"} — MBR | Asset Appendix Report · confidence: high
- Identifiers.10: {"value":"PJM East; AP South; 5004/5005","system":"PJM market submarkets"} — MBR | Asset Appendix Report · confidence: high
- Parties.2: {"relationship":"FERC registered filing entity and affiliate controller","name":"Essential Power OPP, LLC","official_url":null} — MBR | Asset Appendix Report · confidence: medium
- Parties.3: {"relationship":"Historical owner / portfolio acquirer, 2011–2016","name":"The Carlyle Group","official_url":"https://www.carlyle.com"} — NAEA Ocean Peaking power station - Global Energy Monitor · confidence: medium
- Parties.3: {"relationship":"Historical owner / portfolio acquirer, 2011–2016","name":"The Carlyle Group","official_url":"https://www.carlyle.com"} — Carlyle Acquire Power Generation Portfolio from IFM... · confidence: medium
- Parties.6: {"relationship":"EPC contractor","name":"CH2M Hill Companies","official_url":"https://www.jacobs.com/newsroom/press-release/jacobs-completes-ch2m-acquisition-creating-15-billion-professional-services"} — Power plant profile: Ocean Peaking Power Plant, US · confidence: medium
- Parties.7: {"relationship":"Gas-turbine and electric-generator OEM","name":"GE Power, now GE Vernova","official_url":"https://www.gevernova.com/gas-power/products/gas-turbines/7f"} — Power plant profile: Ocean Peaking Power Plant, US · confidence: medium
- Construction scope: Simple-cycle natural-gas peaking plant in Lakewood, New Jersey. The documented build scope included EPC services for the power islands, installation of two owner-supplied GE Frame 7FA gas-turbine generator sets and ancillary equipment, balance-of-plant equipment, startup coordination, weatherproof/sound-attenuating turbine enclosures, and 75-foot exhaust stacks with horizontal silencers. A third turbine was described only as an option; the installed station is documented as having two units. — Lockwood Greene awarded $40 million power project in New Jersey · confidence: medium
- Construction scope: Simple-cycle natural-gas peaking plant in Lakewood, New Jersey. The documented build scope included EPC services for the power islands, installation of two owner-supplied GE Frame 7FA gas-turbine generator sets and ancillary equipment, balance-of-plant equipment, startup coordination, weatherproof/sound-attenuating turbine enclosures, and 75-foot exhaust stacks with horizontal silencers. A third turbine was described only as an option; the installed station is documented as having two units. — May Completion Expected for Ocean Peaking Power Plant in New Jers... · confidence: medium
- Product url: https://www.gevernova.com/gas-power/products/gas-turbines/7f — 7F Heavy Duty Gas Turbine | 7F.04/7F.05 · confidence: medium
- Kind: thermal — May Completion Expected for Ocean Peaking Power Plant in New Jers... · confidence: high
- Product family: GE MS7001FA / Frame 7FA; current GE Vernova 7F family — May Completion Expected for Ocean Peaking Power Plant in New Jers... · confidence: high
- Manufacturer name: General Electric (GE), now GE Vernova — May Completion Expected for Ocean Peaking Power Plant in New Jers... · confidence: high
- Significance: NAEA Ocean Peaking Power is a natural-gas-fired peaking facility in New Jersey’s PJM market. Carlyle’s 2016 portfolio announcement identified Ocean Peaking Power as a 358 MW gas-fired peaking facility within Essential Power’s generation portfolio. — Source · confidence: medium
- Description: NAEA Ocean Peaking Power LLC is an operating natural-gas-fired combustion-turbine plant in Lakewood, Ocean County, New Jersey, serving the PJM balancing area. EIA records identify two generators, OPP3 and OPP4, and list each as a natural-gas-fired combustion turbine with a 191.5 MW nameplate rating. The project was originally developed as Ocean Peaking Power L.P., an affiliate of Consolidated Edison Development, and entered commercial operation in May 2003. Consolidated Edison agreed in December 2007 to sell its interests in Ocean Peaking Power and other generation projects to North American Energy Alliance, jointly owned by AllCapital and IFM Investors. Carlyle is reported to have acquired NAEA Ocean Peaking Power in October 2011; in February 2016, Carlyle separately announced an agreement to acquire the broader Essential Power portfolio from IFM Investors. — Lakewood Planning Board Approves Con Edison Development Power Plant | Consolidated Edison, Inc. · confidence: medium
- Description: NAEA Ocean Peaking Power LLC is an operating natural-gas-fired combustion-turbine plant in Lakewood, Ocean County, New Jersey, serving the PJM balancing area. EIA records identify two generators, OPP3 and OPP4, and list each as a natural-gas-fired combustion turbine with a 191.5 MW nameplate rating. The project was originally developed as Ocean Peaking Power L.P., an affiliate of Consolidated Edison Development, and entered commercial operation in May 2003. Consolidated Edison agreed in December 2007 to sell its interests in Ocean Peaking Power and other generation projects to North American Energy Alliance, jointly owned by AllCapital and IFM Investors. Carlyle is reported to have acquired NAEA Ocean Peaking Power in October 2011; in February 2016, Carlyle separately announced an agreement to acquire the broader Essential Power portfolio from IFM Investors. — NAEA Ocean Peaking power station - Global Energy Monitor · confidence: medium
- Quality notes: ["Capacity figures vary among records: EIA/FERC unit records list two 191.5 MW units, while other plant summaries report an aggregate capacity of approximately 397.8 MW.","Early permitting material described a modification covering three GE Frame 7FA turbines, whereas a February 2003 construction report described two installed units with an option for a third; No exact-project project-finance lender, retirement, or repowering transaction is disclosed in the cited records."] — May Completion Expected for Ocean Peaking Power Plant in New Jers... · confidence: medium
- Financing summary: A February 2003 project report described the facility as a $120 million simple-cycle plant; this is a reported construction cost, not identified project financing, and no lender or debt structure was disclosed. On December 10, 2007, Consolidated Edison agreed to sell a 1,706 MW generation portfolio including Ocean Peaking Power to North American Energy Alliance for $1.477 billion in cash, subject to closing adjustments; that was a portfolio sale value rather than a disclosed Ocean Peaking Power consideration. The February 2, 2016 Carlyle-IFM announcement gave no purchase price and stated that equity capital would come from Carlyle Power Partners II, L.P. — May Completion Expected for Ocean Peaking Power Plant in New Jers... · confidence: high
- Financing summary: A February 2003 project report described the facility as a $120 million simple-cycle plant; this is a reported construction cost, not identified project financing, and no lender or debt structure was disclosed. On December 10, 2007, Consolidated Edison agreed to sell a 1,706 MW generation portfolio including Ocean Peaking Power to North American Energy Alliance for $1.477 billion in cash, subject to closing adjustments; that was a portfolio sale value rather than a disclosed Ocean Peaking Power consideration. The February 2, 2016 Carlyle-IFM announcement gave no purchase price and stated that equity capital would come from Carlyle Power Partners II, L.P. — Carlyle Acquire Power Generation Portfolio from IFM Investors · confidence: high
- Timeline: [{"event":"Initial permitting and development","date":"2001-07","detail":"EPA reviewed a significant PSD/LAER permit modification for Ocean Peaking Power L.P., formerly Lakewood Power Generation and also identified as the Consolidated Edison Development Facility. The modification covered GE Frame 7FA simple-cycle natural-gas turbines."},{"event":"Construction configuration and cost reported","date":"2003-02-12","detail":"A construction report described two 172 MW GE MS7001FA combustion-turbine generators, an option for a third unit, a simple-cycle configuration, and a reported $120 million facility cost. Lockwood Greene was identified as the primary contractor."},{"event":"Commercial operation","date":"2003-05","detail":"The plant was commissioned or entered initial operation in May 2003."},{"event":"Portfolio sale agreement","date":"2007-12-10","detail":"Consolidated Edison Development agreed to sell its interests in five generation projects, including Ocean Peaking Power in Lakewood, to North American Energy Alliance, jointly owned and controlled by AllCapital and IFM Investors, for $1.477 billion in cash for the portfolio."},{"event":"Portfolio sale completed","date":"2008","detail":"Con Edison’s subsequent reporting states that Con Edison Development and its subsidiaries completed the sale of their ownership interests in electricity-generating plants during 2008."},{"event":"Carlyle acquisition","date":"2011-10","detail":"Global Energy Monitor reports that The Carlyle Group acquired NAEA Ocean Peaking Power in October 2011. The cited account does not identify the seller or consideration."},{"event":"Essential Power portfolio acquisition announced","date":"2016-02-02","detail":"Carlyle announced an agreement to acquire Essential Power, a 1,767 net MW portfolio, from IFM Investors. The portfolio included Ocean Peaking Power; consideration was undisclosed and equity was to come from Carlyle Power Partners II, L.P."},{"event":"Operating status documented","date":"2024","detail":"Plant records continued to identify NAEA Ocean Peaking Power as operating, with two generators and reported generation during the September–December 2024 period."}] — May Completion Expected for Ocean Peaking Power Plant in New Jers... · confidence: medium
- Timeline: [{"event":"Initial permitting and development","date":"2001-07","detail":"EPA reviewed a significant PSD/LAER permit modification for Ocean Peaking Power L.P., formerly Lakewood Power Generation and also identified as the Consolidated Edison Development Facility. The modification covered GE Frame 7FA simple-cycle natural-gas turbines."},{"event":"Construction configuration and cost reported","date":"2003-02-12","detail":"A construction report described two 172 MW GE MS7001FA combustion-turbine generators, an option for a third unit, a simple-cycle configuration, and a reported $120 million facility cost. Lockwood Greene was identified as the primary contractor."},{"event":"Commercial operation","date":"2003-05","detail":"The plant was commissioned or entered initial operation in May 2003."},{"event":"Portfolio sale agreement","date":"2007-12-10","detail":"Consolidated Edison Development agreed to sell its interests in five generation projects, including Ocean Peaking Power in Lakewood, to North American Energy Alliance, jointly owned and controlled by AllCapital and IFM Investors, for $1.477 billion in cash for the portfolio."},{"event":"Portfolio sale completed","date":"2008","detail":"Con Edison’s subsequent reporting states that Con Edison Development and its subsidiaries completed the sale of their ownership interests in electricity-generating plants during 2008."},{"event":"Carlyle acquisition","date":"2011-10","detail":"Global Energy Monitor reports that The Carlyle Group acquired NAEA Ocean Peaking Power in October 2011. The cited account does not identify the seller or consideration."},{"event":"Essential Power portfolio acquisition announced","date":"2016-02-02","detail":"Carlyle announced an agreement to acquire Essential Power, a 1,767 net MW portfolio, from IFM Investors. The portfolio included Ocean Peaking Power; consideration was undisclosed and equity was to come from Carlyle Power Partners II, L.P."},{"event":"Operating status documented","date":"2024","detail":"Plant records continued to identify NAEA Ocean Peaking Power as operating, with two generators and reported generation during the September–December 2024 period."}] — NAEA Ocean Peaking power station - Global Energy Monitor · confidence: medium
- Timeline: [{"event":"Initial permitting and development","date":"2001-07","detail":"EPA reviewed a significant PSD/LAER permit modification for Ocean Peaking Power L.P., formerly Lakewood Power Generation and also identified as the Consolidated Edison Development Facility. The modification covered GE Frame 7FA simple-cycle natural-gas turbines."},{"event":"Construction configuration and cost reported","date":"2003-02-12","detail":"A construction report described two 172 MW GE MS7001FA combustion-turbine generators, an option for a third unit, a simple-cycle configuration, and a reported $120 million facility cost. Lockwood Greene was identified as the primary contractor."},{"event":"Commercial operation","date":"2003-05","detail":"The plant was commissioned or entered initial operation in May 2003."},{"event":"Portfolio sale agreement","date":"2007-12-10","detail":"Consolidated Edison Development agreed to sell its interests in five generation projects, including Ocean Peaking Power in Lakewood, to North American Energy Alliance, jointly owned and controlled by AllCapital and IFM Investors, for $1.477 billion in cash for the portfolio."},{"event":"Portfolio sale completed","date":"2008","detail":"Con Edison’s subsequent reporting states that Con Edison Development and its subsidiaries completed the sale of their ownership interests in electricity-generating plants during 2008."},{"event":"Carlyle acquisition","date":"2011-10","detail":"Global Energy Monitor reports that The Carlyle Group acquired NAEA Ocean Peaking Power in October 2011. The cited account does not identify the seller or consideration."},{"event":"Essential Power portfolio acquisition announced","date":"2016-02-02","detail":"Carlyle announced an agreement to acquire Essential Power, a 1,767 net MW portfolio, from IFM Investors. The portfolio included Ocean Peaking Power; consideration was undisclosed and equity was to come from Carlyle Power Partners II, L.P."},{"event":"Operating status documented","date":"2024","detail":"Plant records continued to identify NAEA Ocean Peaking Power as operating, with two generators and reported generation during the September–December 2024 period."}] — Carlyle Acquire Power Generation Portfolio from IFM Investors · confidence: medium
- Quality notes.1: Early permitting material described a modification covering three GE Frame 7FA turbines, whereas a February 2003 construction report described two installed units with an option for a third; current generator records identify OPP3 and OPP4. — May Completion Expected for Ocean Peaking Power Plant in New Jers... · confidence: high
- Quality notes.2: No exact-project project-finance lender, retirement, or repowering transaction is disclosed in the cited records. — NAEA Ocean Peaking power station - Global Energy Monitor · confidence: medium
- Quality notes.2: No exact-project project-finance lender, retirement, or repowering transaction is disclosed in the cited records. — Carlyle Acquire Power Generation Portfolio from IFM Investors · confidence: medium
- Timeline.1: {"event":"Construction configuration and cost reported","date":"2003-02-12","detail":"A construction report described two 172 MW GE MS7001FA combustion-turbine generators, an option for a third unit, a simple-cycle configuration, and a reported $120 million facility cost. Lockwood Greene was identified as the primary contractor."} — May Completion Expected for Ocean Peaking Power Plant in New Jers... · confidence: medium
- Timeline.5: {"event":"Carlyle acquisition","date":"2011-10","detail":"Global Energy Monitor reports that The Carlyle Group acquired NAEA Ocean Peaking Power in October 2011. The cited account does not identify the seller or consideration."} — NAEA Ocean Peaking power station - Global Energy Monitor · confidence: medium
- Timeline.6: {"event":"Essential Power portfolio acquisition announced","date":"2016-02-02","detail":"Carlyle announced an agreement to acquire Essential Power, a 1,767 net MW portfolio, from IFM Investors. The portfolio included Ocean Peaking Power; consideration was undisclosed and equity was to come from Carlyle Power Partners II, L.P."} — Carlyle Acquire Power Generation Portfolio from IFM Investors · confidence: high
- Commercial parties.2: {"relationship":"Original developer and predecessor owner","name":"Consolidated Edison Development / Ocean Peaking Power L.P.","detail":"Ocean Peaking Power L.P. was identified as an affiliate of Con Edison Development and was responsible for developing and operating the Lakewood project before the 2007 portfolio sale.","official_url":"https://www.conedison.com"} — Lakewood Planning Board Approves Con Edison Development Power Plant | Consolidated Edison, Inc. · confidence: high
- Commercial parties.2: {"relationship":"Original developer and predecessor owner","name":"Consolidated Edison Development / Ocean Peaking Power L.P.","detail":"Ocean Peaking Power L.P. was identified as an affiliate of Con Edison Development and was responsible for developing and operating the Lakewood project before the 2007 portfolio sale.","official_url":"https://www.conedison.com"} — May Completion Expected for Ocean Peaking Power Plant in New Jers... · confidence: high
- Commercial parties.4: {"relationship":"2007 co-owner of buyer; later portfolio seller","name":"IFM Investors","detail":"Jointly controlled North American Energy Alliance with AllCapital in the 2007 acquisition and was identified as the seller of Essential Power to Carlyle in the 2016 portfolio transaction.","official_url":"https://www.ifminvestors.com"} — Carlyle Acquire Power Generation Portfolio from IFM Investors · confidence: medium
- Commercial parties.6: {"relationship":"Historical owner / portfolio acquirer","name":"The Carlyle Group","detail":"Reportedly acquired NAEA Ocean Peaking Power in October 2011 and announced the 2016 acquisition of the broader Essential Power portfolio from IFM Investors.","official_url":"https://www.carlyle.com"} — NAEA Ocean Peaking power station - Global Energy Monitor · confidence: medium
- Commercial parties.6: {"relationship":"Historical owner / portfolio acquirer","name":"The Carlyle Group","detail":"Reportedly acquired NAEA Ocean Peaking Power in October 2011 and announced the 2016 acquisition of the broader Essential Power portfolio from IFM Investors.","official_url":"https://www.carlyle.com"} — Carlyle Acquire Power Generation Portfolio from IFM Investors · confidence: medium
- Commercial parties.7: {"relationship":"EPC contractor","name":"CH2M Hill Companies","detail":"A project profile identifies CH2M Hill Companies as the engineering, procurement, and construction contractor; the company is now part of Jacobs.","official_url":"https://www.jacobs.com"} — Power plant profile: Ocean Peaking Power Plant, US · confidence: medium
- Commercial parties.8: {"relationship":"Primary construction contractor","name":"Lockwood Greene","detail":"A February 2003 construction report identified Lockwood Greene as the primary contractor for the Ocean Peaking Power plant.","official_url":null} — May Completion Expected for Ocean Peaking Power Plant in New Jers... · confidence: medium

## Timeline

- 2001-07 — Initial permitting and development
  EPA reviewed a significant PSD/LAER permit modification for Ocean Peaking Power L. P., formerly Lakewood Power Generation and also identified as the Consolidated Edison Development Facility. The modification covered GE Frame 7FA simple-cycle natural-gas turbines.
  Source: Source (https://www.epa.gov/sites/default/files/2015-07/documents/oceanpp.pdf)
- 2003-02-12 — Construction configuration and cost reported
  A construction report described two 172 MW GE MS7001FA combustion-turbine generators, an option for a third unit, a simple-cycle configuration, and a reported $120 million facility cost. Lockwood Greene was identified as the primary contractor.
  Source: May Completion Expected for Ocean Peaking Power Plant in New Jers... (https://www.industrialinfo.com/news/article/may-completion-expected-for-ocean-peaking-power-plant-in-new-jersey--14802)
- 2003-05 — Commercial operation
  The plant was commissioned or entered initial operation in May 2003.
  Source: May Completion Expected for Ocean Peaking Power Plant in New Jers... (https://www.industrialinfo.com/news/article/may-completion-expected-for-ocean-peaking-power-plant-in-new-jersey--14802)
- 2011-10 — Carlyle acquisition
  Global Energy Monitor reports that The Carlyle Group acquired NAEA Ocean Peaking Power in October 2011. The cited account does not identify the seller or consideration.
  Source: NAEA Ocean Peaking power station - Global Energy Monitor (https://www.gem.wiki/NAEA_Ocean_Peaking_power_station)

## Sources

- [Source](https://www.essentialpowerllc.com/) — essentialpowerllc.com · tier other
- [MBR | Asset Appendix Report](https://mbrweb.ferc.gov/SearchMBRAssetAppendix/AssetAppendixDetails?AssetAppendixId=10797) — mbrweb.ferc.gov · tier regulatory
- [NAEA Ocean Peaking power station - Global Energy Monitor](https://www.gem.wiki/NAEA_Ocean_Peaking_power_station) — gem.wiki · tier other
- [Power plant profile: Ocean Peaking Power Plant, US](https://www.power-technology.com/data-insights/power-plant-profile-ocean-peaking-power-plant-us/) — power-technology.com · tier other
- [Carlyle Acquire Power Generation Portfolio from IFM Investors](https://www.carlyle.com/media-room/news-release-archive/carlyle-group-acquire-power-generation-portfolio-ifm-investors) — carlyle.com · tier other
- [Source](https://www.epa.gov/sites/default/files/2015-07/documents/oceanpp.pdf) — epa.gov · tier regulatory
- [Lockwood Greene awarded $40 million power project in New Jersey](https://www.power-eng.com/coal/lockwood-greene-awarded-40-million-power-project-in-new-jersey/) — power-eng.com · tier other
- [May Completion Expected for Ocean Peaking Power Plant in New Jers...](https://www.industrialinfo.com/news/article/may-completion-expected-for-ocean-peaking-power-plant-in-new-jersey--14802) — industrialinfo.com · tier other
- [7F Heavy Duty Gas Turbine | 7F.04/7F.05](https://www.gevernova.com/gas-power/products/gas-turbines/7f) — gevernova.com · tier other
- [Source](https://www.nj.gov/bpu/pdf/energy/Initial%20Comments%20NAEA.pdf) — nj.gov · tier regulatory
- [Lakewood Planning Board Approves Con Edison Development Power Plant | Consolidated Edison, Inc.](https://investor.conedison.com/news-releases/news-release-details/lakewood-planning-board-approves-con-edison-development-power/) — investor.conedison.com · tier other
- [Con Edison Announces Agreement to Sell Generation Projects to North American Energy Alliance | Consolidated Edison, Inc.](https://investor.conedison.com/news-releases/news-release-details/con-edison-announces-agreement-sell-generation-projects-north/) — investor.conedison.com · tier other

## Data quality

- Capacity figures vary among records: EIA/FERC unit records list two 191.5 MW units, while other plant summaries report an aggregate capacity of approximately 397.8 MW. Early permitting material described a modification covering three GE Frame 7FA turbines, whereas a February 2003 construction report described two installed units with an option for a third; current generator records identify OPP3 and OPP4. No exact-project project-finance lender, retirement, or repowering transaction is disclosed in the cited records.

---

Canonical page: https://askthegrid.com/assets/facilities/naea-ocean-peaking-power-llc

Source: Ask the Grid — https://askthegrid.com/