# Nobles 2 Wind Project

MISO asset profile · https://askthegrid.com/assets/facilities/nobles-2-wind-project

## Current generation inventory

EIA plant 62364 · Inventory reporting month: 2026-08.

- wind: 250 MW operating nameplate
- Capacity basis: operating_generator_nameplate_mw
- Source inventory: [EIA-860M workbook (preliminary)](https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx)
- Inventory retrieved: 2026-10-10T02:12:40.665346+00:00
- Filed coordinate (longitude, latitude): -95.85277, 43.789636
- OSM extract: 2026-10-08T20:21:06Z
- OSM mapped edit: 2024-10-14 22:05:08+00:00
- Map prepared: 2026-10-10T02:28:18.747586+00:00

Battery power (MW) and stored energy (MWh) are separate measures. Shared physical-site membership does not establish electrical connectivity, settlement or a common export limit.

## Reviewed overview

Nobles 2 Wind Project is a 250 MW onshore wind turbine plant in Nobles County. Nobles 2 is a 250 MW wind farm near Wilmont in Nobles County, Minnesota, with 74 Vestas turbines. Mortenson was the construction contractor. The wind farm reached commercial operation on 12 December 2020 and sells its output to Minnesota Power under a 20-year power purchase agreement. Tenaska closed $158 million of financing for the project in November 2019.

## Reviewed metrics

- **Nameplate capacity:** 250 MW — Canonical EIA plant baseline.
- **Registry anchor:** Plant 62364 — plant-62364

## Facts

- **Technology:** Onshore Wind Turbine
- **Operator:** Tenaska

## Related parties

- **Operator / developer / equity investor:** Tenaska — developer ([source](https://www.tenaska.com))
- **Offtaker:** Minnesota Power — offtaker ([source](https://www.mnpower.com))
- **O&M provider / equipment supplier:** Vestas — equipment_supplier ([source](https://www.vestas.com))
- **EPC contractor:** Mortenson — epc_contractor ([source](https://www.mortenson.com))

## Sources

- [dglobe.com](https://www.dglobe.com/business/nobles-2-wind-farm-now-operational) — dglobe.com · public_source — Source retained for exact-record publication review.
- [mortenson.com](https://www.mortenson.com/news-insights/benefits-of-the-nobles-2-wind-farm) — mortenson.com · public_source — Source retained for exact-record publication review.
- [powermag.com](https://www.powermag.com/press-releases/nobles-2-wind-farm-in-southwest-minnesota-begins-commercial-operation) — powermag.com · public_source — Source retained for exact-record publication review.

---

Canonical page: https://askthegrid.com/assets/facilities/nobles-2-wind-project
Website: [Nobles 2 Power Partners, LLC](https://www.tenaska.com)

Source: Ask the Grid — https://askthegrid.com/