# North English

MISO asset profile · https://askthegrid.com/assets/facilities/north-english

## Current generation inventory

EIA plant 62133 · Inventory reporting month: 2026-08.

- wind: 340 MW operating nameplate
- Capacity basis: operating_generator_nameplate_mw
- Source inventory: [EIA-860M workbook (preliminary)](https://www.eia.gov/electricity/data/eia860m/xls/august_generator2026.xlsx)
- Inventory retrieved: 2026-10-10T02:12:40.665346+00:00
- Filed coordinate (longitude, latitude): -92.49906, 41.642776
- OSM extract: 2026-10-08T20:21:06Z
- OSM mapped edit: 2024-03-25 04:13:53+00:00
- Map prepared: 2026-10-10T02:28:18.447963+00:00

Battery power (MW) and stored energy (MWh) are separate measures. Shared physical-site membership does not establish electrical connectivity, settlement or a common export limit.

## Reviewed overview

North English is a 340 MW wind farm in Poweshiek County, Iowa, owned by MidAmerican Energy. Announced in October 2017 as the third site of the utility's Wind XI project, it was planned with up to 170 turbines, and construction had begun with completion scheduled for December 2018. The farm shares an operations and maintenance building in Montezuma with the Prairie wind farm in neighboring Mahaska County.

## Reviewed metrics

- **Nameplate capacity:** 340 MW — Canonical EIA plant baseline.
- **Registry anchor:** Plant 62133 — plant-62133

## Facts

- **Technology:** Onshore Wind Turbine
- **Operator:** MidAmerican Energy

## Related parties

- **Owner / operator / developer:** MidAmerican Energy — owner ([source](https://www.midamericanenergy.com))

## Sources

- [windpowerengineering.com](https://www.windpowerengineering.com/midamerican-energy-announces-third-site-wind-xi-project/) — windpowerengineering.com · public_source — Source retained for exact-record publication review.

---

Canonical page: https://askthegrid.com/assets/facilities/north-english
Website: [MidAmerican Energy](https://www.midamericanenergy.com)

Source: Ask the Grid — https://askthegrid.com/
