# NTT Garland Campus

ERCOT data center · https://askthegrid.com/assets/facilities/ntt-garland-campus--grid-load-9a97c343ea4e9027

NTT Garland Campus contains separately identified colocation buildings. Dallas TX1 at 2008 Lookout Drive has 16 MW of critical IT load, with air-cooled rooftop units and indirect air economizers. NTT describes TX4 at 2060 Lookout Drive as 36 MW of critical IT load with closed-loop water cooling. Its public page still advertises a June 2026 opening target, while the Texas filing lists an April 2026 scheduled completion; neither establishes an actual TX4 opening date.

## Identity and location

- Operating status: operating
- Asset scope: campus
- Location: 2008 Lookout Drive, Garland, Dallas County, TX
- Operator: NTT DATA (campus) — https://www.nttdata.com

## Power and grid context

- Critical it load: 16 MW · reported · building · Dallas TX1 — NTT operator-reported critical IT load for TX1 only; not a campus aggregate.
- Backup generation: 34 MW · reported · building · Dallas TX1 — TX1 backup-generator equipment rating; not critical IT capacity.
- Critical it load: 36 MW · reported · building · Dallas TX4 — Operator-reported TX4 critical IT specification. Future wording and the June 2026 target do not confirm commercial operation.

## Development

- Construction: The campus includes Dallas TX1 at 2008 Lookout Drive and separately identified TX4 at 2060 Lookout Drive. Texas registration TABS2024017291 lists TX4 at the campus address of 2008 Lookout Drive, describes a 235,910-square-foot new construction project, and records scheduled dates of September 1, 2024 to April 1, 2026 with status Review Complete. NTT’s TX4 webpage advertises an opening target from June 2026. These are schedules, not actual completion or commercial-operation dates.

## Compute and operations

- Facility classes: colocation
- Operating context: NTT offers cabinets, customizable cages, private suites and dedicated vaults at TX1 and TX4. TX1 also lists build-to-suit deployments. TX1’s datasheet describes a 160 MW campus while the TX4 webpage describes a 124 MW campus; the campus aggregate is source-conflicting.

## Sources

- [ntt-tx1-sheet](https://dam.nttdata.com/api/public/content/GDC_FactSheet_DallasTX1_EN?v=bbfc0a04)
- [US Census reverse-geography at preserved registry anchor](https://geocoding.geo.census.gov/geocoder/geographies/coordinates?x=-96.65838015555534&y=32.97957735&benchmark=Public_AR_Current&vintage=Current_Current&format=json)
- [ntt-tx4-sheet](https://images.datacenter.hello.global.ntt/Web/GDCAmericas/%7Bc4d1193a-da4f-4142-961b-d10ac6e988f3%7D_GDC_Factsheet_TX4_EN.pdf)
- [ntt-tx4](https://www.nttdata.com/en-ke/services/global-data-centers/global-locations/americas/dallas-data-centers/dallas-tx-4-data-center)
- [ntt-tx1](https://www.nttdata.com/en-th/services/global-data-centers/global-locations/americas/dallas-data-centers/dallas-tx-1-data-center)
- [ntt-tdlr](https://www.tdlr.texas.gov/TABS/Search/Print/TABS2024017291)

## Data quality

- Power values retain their reported, requested, contracted, energized, gross-campus, or critical-IT basis.

---