# NTT Lancaster TX10 Data Center Campus (Project Orange)

ERCOT data center · https://askthegrid.com/assets/facilities/ntt-lancaster-tx10-data-center-campus-project-orange--grid-load-693fa230f3212837

Project Orange is a proposed NTT data center campus at 201 Sunrise Road in Lancaster, Dallas County, Texas. The city ratified the development agreement in August 2025 and amended its incentive agreement with NTT in April 2026. A trade report describes seven buildings that together total 252 MW, and a site-plan exhibit shows a proposed on-site substation. Oncor is named as the expected power supplier, and no construction or operation has been confirmed.

## Identity and location

- Operating status: approved
- Asset scope: campus
- Location: 201 Sunrise Road, Lancaster, Dallas County, TX
- Developer: NTT Global Data Centers Americas, Inc. (exact asset)
- Operator: NTT Global Data Centers Americas, Inc. (exact asset)

## Power and grid context

- Reported unspecified: 252 MW · proposed · exact asset — Reported campus buildout of seven buildings; electrical basis not stated
- ISO/RTO: ERCOT
- Electric utility: Oncor

## Development

- Site area: 108.652 acres

## Sources

- [Just a moment...](https://www.datacenterdynamics.com/en/news/large-data-center-campus-proposed-in-lancaster-area-of-dallas-texas/)
- [https://public.destinyhosted.com/lancadocs/2024/CCREG/20241209_2201/5268_Project_Orange_11.22.24_-_%28City_Edit_11.22.24%29_-_FINAL_-_11-26-24_-_exhibit.pdf](https://public.destinyhosted.com/lancadocs/2024/CCREG/20241209_2201/5268_Project_Orange_11.22.24_-_%28City_Edit_11.22.24%29_-_FINAL_-_11-26-24_-_exhibit.pdf)
- [https://public.destinyhosted.com/lancadocs/2025/CCREG/20250811_2311/5019_5019_M24-48_CP_Project_Orange_PD__Development_Agreement_Compiled.pdf](https://public.destinyhosted.com/lancadocs/2025/CCREG/20250811_2311/5019_5019_M24-48_CP_Project_Orange_PD__Development_Agreement_Compiled.pdf)
- [https://public.destinyhosted.com/lancadocs/2026/CCREG/20260427_2492/AGENDApacket__04-27-26_0446_2490.pdf](https://public.destinyhosted.com/lancadocs/2026/CCREG/20260427_2492/AGENDApacket__04-27-26_0446_2490.pdf)
- [https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=201+Sunrise+Road%2C+Lancaster%2C+TX&benchmark=Public_AR_Current&vintage=Current_Current&format=json](https://geocoding.geo.census.gov/geocoder/geographies/onelineaddress?address=201+Sunrise+Road%2C+Lancaster%2C+TX&benchmark=Public_AR_Current&vintage=Current_Current&format=json)
- [https://public.destinyhosted.com/lancadocs/2025/CCREG/20250811_2311/5662_Draft_Ordinance.pdf](https://public.destinyhosted.com/lancadocs/2025/CCREG/20250811_2311/5662_Draft_Ordinance.pdf)

---

Canonical page: https://askthegrid.com/assets/facilities/ntt-lancaster-tx10-data-center-campus-project-orange--grid-load-693fa230f3212837
Profile generated: 2026-11-02T22:40:52.372022Z
Source: Ask the Grid — https://askthegrid.com/