# Oberon II Solar Project

CAISO Solar Photovoltaic, Batteries · https://askthegrid.com/assets/facilities/oberon-ii-solar-project

Oberon II Solar Project is a hybrid solar and battery storage facility with 375 MW of EIA-reported total operating capacity and 500 MWh of reported storage energy capacity in Riverside County, California, registered as EIA Plant ID 65735. The broader Oberon Solar + Storage site was the first project to achieve operation through the streamlined Bureau of Land Management Desert Renewable Energy Conservation Plan. Its grid role is hybrid solar generation with co-located battery storage.

## Key facts

- Technology: Solar Photovoltaic, Batteries
- Power capacity: 375 MW
- Energy capacity: 500 MWh
- Operating status: operating

## Grid and market context

- ISO/RTO: CAISO
- Balancing authority: CISO / CAISO
- Substation: SCE Red Bluff Substation
- Point of interconnection: SCE Red Bluff Substation
- Transmission owner: Southern California Edison (SCE)
- Interconnection voltage: 500 kV

## Source-backed facts

- Owner logo domain: intersect.com — Intersect | Powering AI Data Centers at Scale · confidence: medium
- Identifiers: [{"value":"65735","system":"EIA plant ID"},{"value":"OBIIP","system":"EIA generator ID — solar photovoltaic"},{"value":"OBIIB","system":"EIA generator ID — battery"},{"value":"CAISO / CISO","system":"Balancing authority and power market"},{"value":"OBR2","system":"CAISO SCID for IP Oberon II, LLC"},{"value":"1642","system":"CAISO queue position — Oberon interconnection"},{"value":"REDBLUFF_2_B1","system":"CAISO RTO/ISO LMP node"},{"value":"22GEN23701","system":"CAISO network-model resource — Oberon 2A Solar"},{"value":"22-142-000","system":"FERC exempt wholesale generator docket"},{"value":"C011815","system":"FERC company identifier"}] — MBR | Index · confidence: medium
- Identifiers: [{"value":"65735","system":"EIA plant ID"},{"value":"OBIIP","system":"EIA generator ID — solar photovoltaic"},{"value":"OBIIB","system":"EIA generator ID — battery"},{"value":"CAISO / CISO","system":"Balancing authority and power market"},{"value":"OBR2","system":"CAISO SCID for IP Oberon II, LLC"},{"value":"1642","system":"CAISO queue position — Oberon interconnection"},{"value":"REDBLUFF_2_B1","system":"CAISO RTO/ISO LMP node"},{"value":"22GEN23701","system":"CAISO network-model resource — Oberon 2A Solar"},{"value":"22-142-000","system":"FERC exempt wholesale generator docket"},{"value":"C011815","system":"FERC company identifier"}] — Notice of new market participants as of 7/31/24 | California ISO · confidence: medium
- Identifiers: [{"value":"65735","system":"EIA plant ID"},{"value":"OBIIP","system":"EIA generator ID — solar photovoltaic"},{"value":"OBIIB","system":"EIA generator ID — battery"},{"value":"CAISO / CISO","system":"Balancing authority and power market"},{"value":"OBR2","system":"CAISO SCID for IP Oberon II, LLC"},{"value":"1642","system":"CAISO queue position — Oberon interconnection"},{"value":"REDBLUFF_2_B1","system":"CAISO RTO/ISO LMP node"},{"value":"22GEN23701","system":"CAISO network-model resource — Oberon 2A Solar"},{"value":"22-142-000","system":"FERC exempt wholesale generator docket"},{"value":"C011815","system":"FERC company identifier"}] — Queue Report Export · confidence: medium
- Identifiers: [{"value":"65735","system":"EIA plant ID"},{"value":"OBIIP","system":"EIA generator ID — solar photovoltaic"},{"value":"OBIIB","system":"EIA generator ID — battery"},{"value":"CAISO / CISO","system":"Balancing authority and power market"},{"value":"OBR2","system":"CAISO SCID for IP Oberon II, LLC"},{"value":"1642","system":"CAISO queue position — Oberon interconnection"},{"value":"REDBLUFF_2_B1","system":"CAISO RTO/ISO LMP node"},{"value":"22GEN23701","system":"CAISO network-model resource — Oberon 2A Solar"},{"value":"22-142-000","system":"FERC exempt wholesale generator docket"},{"value":"C011815","system":"FERC company identifier"}] — NRI · confidence: medium
- Identifiers: [{"value":"65735","system":"EIA plant ID"},{"value":"OBIIP","system":"EIA generator ID — solar photovoltaic"},{"value":"OBIIB","system":"EIA generator ID — battery"},{"value":"CAISO / CISO","system":"Balancing authority and power market"},{"value":"OBR2","system":"CAISO SCID for IP Oberon II, LLC"},{"value":"1642","system":"CAISO queue position — Oberon interconnection"},{"value":"REDBLUFF_2_B1","system":"CAISO RTO/ISO LMP node"},{"value":"22GEN23701","system":"CAISO network-model resource — Oberon 2A Solar"},{"value":"22-142-000","system":"FERC exempt wholesale generator docket"},{"value":"C011815","system":"FERC company identifier"}] — MBR | Asset Appendix Report · confidence: medium
- Owner name: IP Oberon II, LLC — MBR | Index · confidence: medium
- Identifiers.0: {"value":"65735","system":"EIA plant ID"} — MBR | Index · confidence: high
- Identifiers.1: {"value":"OBIIP","system":"EIA generator ID — solar photovoltaic"} — MBR | Index · confidence: high
- Identifiers.2: {"value":"OBIIB","system":"EIA generator ID — battery"} — MBR | Index · confidence: high
- Identifiers.4: {"value":"OBR2","system":"CAISO SCID for IP Oberon II, LLC"} — Notice of new market participants as of 7/31/24 | California ISO · confidence: high
- Identifiers.5: {"value":"1642","system":"CAISO queue position — Oberon interconnection"} — Queue Report Export · confidence: medium
- Identifiers.7: {"value":"22GEN23701","system":"CAISO network-model resource — Oberon 2A Solar"} — NRI · confidence: medium
- Identifiers.9: {"value":"C011815","system":"FERC company identifier"} — MBR | Asset Appendix Report · confidence: high
- Parties.0: {"relationship":"Registered owner and FERC filing entity","name":"IP Oberon II, LLC","official_url":null} — MBR | Asset Appendix Report · confidence: medium
- Parties.3: {"relationship":"CAISO market participant","name":"IP Oberon II, LLC","official_url":null} — Notice of new market participants as of 7/31/24 | California ISO · confidence: high
- Interconnection: Southern California Edison (SCE) Red Bluff Substation at 500 kV, via a new 500 kV gen-tie; CAISO node REDBLUFF_2_B1. — Source · confidence: medium
- Construction scope: Oberon II Solar Project (EIA plant 65735) is an operational 375 MW solar-and-battery facility with two operating generating units. The shared Oberon build is documented with 679 MWp/500 MWac of solar, 250 MW/1 GWh of co-located storage, single-axis tracking PV arrays, a high-voltage substation, First Solar modules, Nextracker NX Horizon trackers, and Tesla battery technology. Exact plant-65735 installed counts for panels, PCS/inverters, battery units, and containers are not disclosed; combined Oberon sources do not allocate those counts specifically to Oberon II. — Solar Projects · confidence: medium
- Product url: https://www.tesla.com/megapack — Megapack | Tesla · confidence: high
- Equipment models: [{"manufacturer_domain":"tesla.com","product_url":"https://www.tesla.com/megapack","count":null,"unit_mw":null,"name":"Tesla Megapack 2XL"},{"manufacturer_domain":"firstsolar.com","product_url":"https://www.firstsolar.com/en/Products/Series-6","count":null,"unit_mw":null,"name":"First Solar PV modules (model not disclosed for plant 65735)"},{"manufacturer_domain":"nextracker.com","product_url":"https://www.nextracker.com/products/nx-horizon/","count":null,"unit_mw":null,"name":"Nextracker NX Horizon trackers"}] — Solar Projects · confidence: medium
- Product family: Tesla Megapack 2XL — Solar Projects · confidence: medium
- Equipment models.0: {"manufacturer_domain":"tesla.com","product_url":"https://www.tesla.com/megapack","count":null,"unit_mw":null,"name":"Tesla Megapack 2XL"} — Solar Projects · confidence: medium
- Construction scope: Oberon II Solar Project (EIA plant 65735) is an operational 375 MW solar-and-battery facility with two operating generating units. The shared Oberon build is documented with 679 MWp/500 MWac of solar, 250 MW/1 GWh of co-located storage, single-axis tracking PV arrays, a high-voltage substation, First Solar modules, Nextracker NX Horizon trackers, and Tesla battery technology. Exact plant-65735 installed counts for panels, PCS/inverters, battery units, and containers are not disclosed; combined Oberon sources do not allocate those counts specifically to Oberon II. — Intersect | Intersect Reaches Commercial Operation of 679 MWp / 1 GWh… · confidence: medium
- Construction scope: Oberon II Solar Project (EIA plant 65735) is an operational 375 MW solar-and-battery facility with two operating generating units. The shared Oberon build is documented with 679 MWp/500 MWac of solar, 250 MW/1 GWh of co-located storage, single-axis tracking PV arrays, a high-voltage substation, First Solar modules, Nextracker NX Horizon trackers, and Tesla battery technology. Exact plant-65735 installed counts for panels, PCS/inverters, battery units, and containers are not disclosed; combined Oberon sources do not allocate those counts specifically to Oberon II. — Source · confidence: medium
- Product url: https://www.tesla.com/megapack — Source · confidence: medium
- Product url: https://www.tesla.com/megapack — Intersect | Intersect Reaches Commercial Operation of 679 MWp / 1 GWh… · confidence: medium
- Manufacturer domain: tesla.com — Source · confidence: medium
- Equipment models: [{"manufacturer_domain":"tesla.com","product_url":"https://www.tesla.com/megapack","count":null,"unit_mw":null,"name":"Tesla Megapack 2XL"},{"manufacturer_domain":"firstsolar.com","product_url":"https://www.firstsolar.com/en/Products/Series-6","count":null,"unit_mw":null,"name":"First Solar PV modules (model not disclosed for plant 65735)"},{"manufacturer_domain":"nextracker.com","product_url":"https://www.nextracker.com/products/nx-horizon/","count":null,"unit_mw":null,"name":"Nextracker NX Horizon trackers"}] — Intersect | Intersect Reaches Commercial Operation of 679 MWp / 1 GWh… · confidence: medium
- Product family: Tesla Megapack 2XL — Source · confidence: medium
- Manufacturer name: Tesla — Source · confidence: medium
- Equipment models.0: {"manufacturer_domain":"tesla.com","product_url":"https://www.tesla.com/megapack","count":null,"unit_mw":null,"name":"Tesla Megapack 2XL"} — Source · confidence: medium
- Equipment models.1: {"manufacturer_domain":"firstsolar.com","product_url":"https://www.firstsolar.com/en/Products/Series-6","count":null,"unit_mw":null,"name":"First Solar PV modules (model not disclosed for plant 65735)"} — Intersect | Intersect Reaches Commercial Operation of 679 MWp / 1 GWh… · confidence: medium
- Equipment models.2: {"manufacturer_domain":"nextracker.com","product_url":"https://www.nextracker.com/products/nx-horizon/","count":null,"unit_mw":null,"name":"Nextracker NX Horizon trackers"} — Intersect | Intersect Reaches Commercial Operation of 679 MWp / 1 GWh… · confidence: medium
- Timeline: [{"event":"Portfolio financing announced","date":"2021-11","detail":"Intersect announced $2.6 billion of financing commitments for a six-project portfolio that included Oberon I and Oberon II, covering construction financing, tax equity, land financing, and portfolio-level term debt."},{"event":"Construction authorized and begun","date":"2022-07","detail":"The Bureau of Land Management approved the start of construction of the Oberon solar project on July 13; contemporaneous reporting stated that construction had begun on July 11, with completion targeted for September 2023."},{"event":"Portfolio financing closed","date":"2022-09-29","detail":"Intersect closed $3.1 billion of aggregate portfolio financing, including Oberon I and Oberon II. The package included $2.4 billion of new commitments and $675 million of allocated previously announced commitments."},{"event":"First unit entered service","date":"2023-09","detail":"EIA-derived plant data records the first Oberon II unit online on September 1, 2023."},{"event":"Commercial operation announced","date":"2023-11-14","detail":"Intersect announced commercial operation of the broader Oberon Solar + Storage project in Riverside County. The combined site announcement described 679 MWp/500 MWac of solar and 250 MW/1 GWh of co-located storage."},{"event":"Agreement to acquire Intersect announced","date":"2025-12-22","detail":"Alphabet announced an agreement to acquire Intersect for $4.75 billion in cash plus assumed debt. Intersect stated that its operating and in-development California assets would not be part of the acquisition."},{"event":"Oberon transferred to IPX Power portfolio","date":"2026-03","detail":"Following the early-2026 sale of Intersect to Google, IPX Power was carved out as an independent power producer and assumed ownership of a portion of Intersect's solar and storage assets, including the Oberon facility. The sources describe this as a carve-out or assumed ownership rather than a separately priced sale of plant 65735."}] — Bureau of Land Management OKs construction start for 500... · confidence: medium
- Timeline: [{"event":"Portfolio financing announced","date":"2021-11","detail":"Intersect announced $2.6 billion of financing commitments for a six-project portfolio that included Oberon I and Oberon II, covering construction financing, tax equity, land financing, and portfolio-level term debt."},{"event":"Construction authorized and begun","date":"2022-07","detail":"The Bureau of Land Management approved the start of construction of the Oberon solar project on July 13; contemporaneous reporting stated that construction had begun on July 11, with completion targeted for September 2023."},{"event":"Portfolio financing closed","date":"2022-09-29","detail":"Intersect closed $3.1 billion of aggregate portfolio financing, including Oberon I and Oberon II. The package included $2.4 billion of new commitments and $675 million of allocated previously announced commitments."},{"event":"First unit entered service","date":"2023-09","detail":"EIA-derived plant data records the first Oberon II unit online on September 1, 2023."},{"event":"Commercial operation announced","date":"2023-11-14","detail":"Intersect announced commercial operation of the broader Oberon Solar + Storage project in Riverside County. The combined site announcement described 679 MWp/500 MWac of solar and 250 MW/1 GWh of co-located storage."},{"event":"Agreement to acquire Intersect announced","date":"2025-12-22","detail":"Alphabet announced an agreement to acquire Intersect for $4.75 billion in cash plus assumed debt. Intersect stated that its operating and in-development California assets would not be part of the acquisition."},{"event":"Oberon transferred to IPX Power portfolio","date":"2026-03","detail":"Following the early-2026 sale of Intersect to Google, IPX Power was carved out as an independent power producer and assumed ownership of a portion of Intersect's solar and storage assets, including the Oberon facility. The sources describe this as a carve-out or assumed ownership rather than a separately priced sale of plant 65735."}] — BLM approves start of construction of Oberon solar project · confidence: medium
- Timeline: [{"event":"Portfolio financing announced","date":"2021-11","detail":"Intersect announced $2.6 billion of financing commitments for a six-project portfolio that included Oberon I and Oberon II, covering construction financing, tax equity, land financing, and portfolio-level term debt."},{"event":"Construction authorized and begun","date":"2022-07","detail":"The Bureau of Land Management approved the start of construction of the Oberon solar project on July 13; contemporaneous reporting stated that construction had begun on July 11, with completion targeted for September 2023."},{"event":"Portfolio financing closed","date":"2022-09-29","detail":"Intersect closed $3.1 billion of aggregate portfolio financing, including Oberon I and Oberon II. The package included $2.4 billion of new commitments and $675 million of allocated previously announced commitments."},{"event":"First unit entered service","date":"2023-09","detail":"EIA-derived plant data records the first Oberon II unit online on September 1, 2023."},{"event":"Commercial operation announced","date":"2023-11-14","detail":"Intersect announced commercial operation of the broader Oberon Solar + Storage project in Riverside County. The combined site announcement described 679 MWp/500 MWac of solar and 250 MW/1 GWh of co-located storage."},{"event":"Agreement to acquire Intersect announced","date":"2025-12-22","detail":"Alphabet announced an agreement to acquire Intersect for $4.75 billion in cash plus assumed debt. Intersect stated that its operating and in-development California assets would not be part of the acquisition."},{"event":"Oberon transferred to IPX Power portfolio","date":"2026-03","detail":"Following the early-2026 sale of Intersect to Google, IPX Power was carved out as an independent power producer and assumed ownership of a portion of Intersect's solar and storage assets, including the Oberon facility. The sources describe this as a carve-out or assumed ownership rather than a separately priced sale of plant 65735."}] — Intersect | Alphabet Announces Agreement to Acquire Intersect to… · confidence: medium
- Timeline: [{"event":"Portfolio financing announced","date":"2021-11","detail":"Intersect announced $2.6 billion of financing commitments for a six-project portfolio that included Oberon I and Oberon II, covering construction financing, tax equity, land financing, and portfolio-level term debt."},{"event":"Construction authorized and begun","date":"2022-07","detail":"The Bureau of Land Management approved the start of construction of the Oberon solar project on July 13; contemporaneous reporting stated that construction had begun on July 11, with completion targeted for September 2023."},{"event":"Portfolio financing closed","date":"2022-09-29","detail":"Intersect closed $3.1 billion of aggregate portfolio financing, including Oberon I and Oberon II. The package included $2.4 billion of new commitments and $675 million of allocated previously announced commitments."},{"event":"First unit entered service","date":"2023-09","detail":"EIA-derived plant data records the first Oberon II unit online on September 1, 2023."},{"event":"Commercial operation announced","date":"2023-11-14","detail":"Intersect announced commercial operation of the broader Oberon Solar + Storage project in Riverside County. The combined site announcement described 679 MWp/500 MWac of solar and 250 MW/1 GWh of co-located storage."},{"event":"Agreement to acquire Intersect announced","date":"2025-12-22","detail":"Alphabet announced an agreement to acquire Intersect for $4.75 billion in cash plus assumed debt. Intersect stated that its operating and in-development California assets would not be part of the acquisition."},{"event":"Oberon transferred to IPX Power portfolio","date":"2026-03","detail":"Following the early-2026 sale of Intersect to Google, IPX Power was carved out as an independent power producer and assumed ownership of a portion of Intersect's solar and storage assets, including the Oberon facility. The sources describe this as a carve-out or assumed ownership rather than a separately priced sale of plant 65735."}] — Clean Energy Projects | IPX Power · confidence: medium
- Timeline: [{"event":"Portfolio financing announced","date":"2021-11","detail":"Intersect announced $2.6 billion of financing commitments for a six-project portfolio that included Oberon I and Oberon II, covering construction financing, tax equity, land financing, and portfolio-level term debt."},{"event":"Construction authorized and begun","date":"2022-07","detail":"The Bureau of Land Management approved the start of construction of the Oberon solar project on July 13; contemporaneous reporting stated that construction had begun on July 11, with completion targeted for September 2023."},{"event":"Portfolio financing closed","date":"2022-09-29","detail":"Intersect closed $3.1 billion of aggregate portfolio financing, including Oberon I and Oberon II. The package included $2.4 billion of new commitments and $675 million of allocated previously announced commitments."},{"event":"First unit entered service","date":"2023-09","detail":"EIA-derived plant data records the first Oberon II unit online on September 1, 2023."},{"event":"Commercial operation announced","date":"2023-11-14","detail":"Intersect announced commercial operation of the broader Oberon Solar + Storage project in Riverside County. The combined site announcement described 679 MWp/500 MWac of solar and 250 MW/1 GWh of co-located storage."},{"event":"Agreement to acquire Intersect announced","date":"2025-12-22","detail":"Alphabet announced an agreement to acquire Intersect for $4.75 billion in cash plus assumed debt. Intersect stated that its operating and in-development California assets would not be part of the acquisition."},{"event":"Oberon transferred to IPX Power portfolio","date":"2026-03","detail":"Following the early-2026 sale of Intersect to Google, IPX Power was carved out as an independent power producer and assumed ownership of a portion of Intersect's solar and storage assets, including the Oberon facility. The sources describe this as a carve-out or assumed ownership rather than a separately priced sale of plant 65735."}] — Intersect | Solutions · confidence: medium
- Commercial parties.1: {"relationship":"Current portfolio owner following carve-out","name":"IPX Power","detail":"IPX Power states that it owns the Oberon Solar + Storage Facility and assumed ownership of a portion of Intersect's operating and development assets after Intersect was sold to Google.","official_url":"https://ipxpower.com/"} — Clean Energy Projects | IPX Power · confidence: medium
- Commercial parties.1: {"relationship":"Current portfolio owner following carve-out","name":"IPX Power","detail":"IPX Power states that it owns the Oberon Solar + Storage Facility and assumed ownership of a portion of Intersect's operating and development assets after Intersect was sold to Google.","official_url":"https://ipxpower.com/"} — Intersect | Solutions · confidence: medium
- Commercial parties.10: {"relationship":"Construction-financing lead arranger","name":"MUFG","detail":"Served as a coordinating lead arranger for the broader construction-financing package.","official_url":"https://www.mufg.jp/english/"} — Intersect Power Closes $3.1 Billion in Project Financing to Complete Near Term Portfolio Totaling 2.2 GWDC · confidence: high
- Commercial parties.10: {"relationship":"Construction-financing lead arranger","name":"MUFG","detail":"Served as a coordinating lead arranger for the broader construction-financing package.","official_url":"https://www.mufg.jp/english/"} — Intersect | Intersect Reaches Commercial Operation of 679 MWp / 1 GWh… · confidence: high
- Commercial parties.12: {"relationship":"Offtaker","name":"Calpine Energy Solutions","detail":"Named as one of the counterparties purchasing power from the broader Oberon project.","official_url":"https://www.calpine.com/"} — Intersect | Intersect Reaches Commercial Operation of 679 MWp / 1 GWh… · confidence: medium
- Commercial parties.13: {"relationship":"Offtaker","name":"Constellation","detail":"Named as one of the counterparties purchasing power from the broader Oberon project.","official_url":"https://www.constellationenergy.com/"} — Intersect | Intersect Reaches Commercial Operation of 679 MWp / 1 GWh… · confidence: medium
- Commercial parties.14: {"relationship":"Offtaker","name":"Ava Community Energy","detail":"Named as an offtaker; the announcement identifies it as the successor name to East Bay Community Energy.","official_url":"https://avaenergy.org/"} — Intersect | Intersect Reaches Commercial Operation of 679 MWp / 1 GWh… · confidence: medium
- Commercial parties.15: {"relationship":"Offtaker","name":"Microsoft","detail":"Named as one of the counterparties purchasing power from the broader Oberon project.","official_url":"https://www.microsoft.com/"} — Intersect | Intersect Reaches Commercial Operation of 679 MWp / 1 GWh… · confidence: medium
- Commercial parties.16: {"relationship":"Offtaker","name":"San Diego Community Power","detail":"Named as one of the counterparties purchasing power from the broader Oberon project.","official_url":"https://sdcommunitypower.org/"} — Intersect | Intersect Reaches Commercial Operation of 679 MWp / 1 GWh… · confidence: medium
- Commercial parties.0: {"relationship":"Registered owner and FERC filing entity","name":"IP Oberon II, LLC","detail":"Named in FERC and EIA-related records for Oberon II Solar Project, plant 65735.","official_url":null} — Source · confidence: high
- Substation: SCE Red Bluff Substation — Source · confidence: medium

## Timeline

- 2023-11-14 — Commercial operation announced
  Intersect announced commercial operation of the broader Oberon Solar + Storage project in Riverside County. The combined site announcement described 679 MWp/500 MWac of solar and 250 MW/1 GWh of co-located storage.
  Source: Intersect | Intersect Reaches Commercial Operation of 679 MWp / 1 GWh… (https://www.intersect.com/historical-releases/intersect-power-reaches-commercial-operation-of-oberon-solar-storage-project)
- 2025-12-22 — Agreement to acquire Intersect announced
  Alphabet announced an agreement to acquire Intersect for $4.75 billion in cash plus assumed debt. Intersect stated that its operating and in-development California assets would not be part of the acquisition.
  Source: Intersect | Alphabet Announces Agreement to Acquire Intersect to… (https://www.intersect.com/news/alphabet-announces-agreement-to-acquire-intersect-to-advance-u-s-energy-innovation)

## Sources

- [Intersect | Powering AI Data Centers at Scale](https://www.intersect.com/) — intersect.com · tier other
- [MBR | Index](https://mbrweb.ferc.gov/SearchlkpEIA/Index?page=723) — mbrweb.ferc.gov · tier regulatory
- [Notice of new market participants as of 7/31/24 | California ISO](https://www.caiso.com/notices/notice-of-new-market-participants-as-of-7-31-24) — caiso.com · tier other
- [Queue Report Export](https://www.caiso.com/documents/publicqueuereport.pdf) — caiso.com · tier other
- [NRI](https://www.caiso.com/documents/fullnetworkmodel_workscope_db23m1.xlsx) — caiso.com · tier other
- [MBR | Asset Appendix Report](https://mbrweb.ferc.gov/SearchMBRAssetAppendix/AssetAppendixDetails?AssetAppendixId=10818) — mbrweb.ferc.gov · tier regulatory
- [Intersect | Intersect Reaches Commercial Operation of 679 MWp / 1 GWh…](https://www.intersect.com/historical-releases/intersect-power-reaches-commercial-operation-of-oberon-solar-storage-project) — intersect.com · tier other
- [Source](https://www.waterboards.ca.gov/rwqcb7/documents/nop_oberon.pdf) — waterboards.ca.gov · tier regulatory
- [Solar Projects](https://blymyerengineers.com/project-category/solar/) — blymyerengineers.com · tier other
- [Intersect | Tesla Provides Intersect with 15.3 GWh of Megapacks for…](https://www.intersect.com/historical-releases/tesla-provides-intersect-power-with-15-3-gwh-of-megapacks-for-solar-storage-projects) — intersect.com · tier other
- [Megapack | Tesla](https://www.tesla.com/megapack) — tesla.com · tier other
- [Oberon Solar and Storage Project, USA](https://www.power-technology.com/projects/oberon-solar-and-storage-project-usa/) — power-technology.com · tier other
- [APPENDIX A](https://planning.rctlma.org/sites/g/files/aldnop416/files/2024-11/A_NOP%20Scoping%20Report.pdf) — planning.rctlma.org · tier other
- [Source](https://blymyerengineers.com/project-category/solar) — blymyerengineers.com · tier other
- [Intersect | Solutions](https://www.intersect.com/solutions) — intersect.com · tier other
- [Intersect Power Closes $3.1 Billion in Project Financing to Complete Near Term Portfolio Totaling 2.2 GWDC](https://www.prnewswire.com/news-releases/intersect-power-closes-3-1-billion-in-project-financing-to-complete-near-term-portfolio-totaling-2-2-gwdc-301636316.html) — prnewswire.com · tier other
- [Bureau of Land Management OKs construction start for 500 ...](https://www.utilitydive.com/news/blm-final-approval-build-oberon-solar-project-california/627673/) — utilitydive.com · tier other
- [BLM approves start of construction of Oberon solar project](https://www.blm.gov/press-release/blm-approves-start-construction-oberon-solar-project) — blm.gov · tier regulatory
- [Intersect | Alphabet Announces Agreement to Acquire Intersect to…](https://www.intersect.com/news/alphabet-announces-agreement-to-acquire-intersect-to-advance-u-s-energy-innovation) — intersect.com · tier other
- [Clean Energy Projects | IPX Power](https://www.ipxpower.com/portfolio/) — ipxpower.com · tier other
- [Intersect | IPX Power Launches as Independent Power Producer…](https://www.intersect.com/historical-releases/ipx-power-launches-as-independent-power-producer-following-intersect-acquisition-by-google) — intersect.com · tier other
- [Clean Energy Projects | IPX Power](https://ipxpower.com/portfolio/) — ipxpower.com · tier other
- [Battery Storage Charges Ahead as Ultimate US ...](https://www.enr.com/articles/63351-battery-storage-charges-ahead-as-ultimate-us-renewable-energy-growth-enabler) — enr.com · tier other

## Data quality

- EIA plant 65735 refers specifically to Oberon II. Public project announcements often describe the combined Oberon I and Oberon II site, whose aggregate figures are 679 MWp/500 MWac of solar and 1 GWh of storage; those figures should not be treated as the EIA nameplate capacity of plant 65735. The EIA record lists 375 MW of total nameplate capacity, two operating generators, and solar-plus-battery technology. The available EIA/FERC material does not provide a separate storage-energy rating for plant 65735. No retirement, repowering, or completed uprate/derate event is identified; the plant remains operational and its EIA generator record states that no uprate or derate was completed.

---

Canonical page: https://askthegrid.com/assets/facilities/oberon-ii-solar-project

Source: Ask the Grid — https://askthegrid.com/