# Oregon Clean Energy Center

PJM Natural Gas Fired Combined Cycle, Petroleum Liquids · https://askthegrid.com/assets/facilities/oregon-clean-energy-center

Oregon Clean Energy Center is a natural gas-fired power facility with 1,061.5 MW of EIA-reported nameplate capacity in Lucas County, Ohio, registered as EIA Plant ID 59764. Oregon Clean Energy Center is the registered plant entity or operator. The plant's generating configuration is four operating generators: two natural-gas-fired combined-cycle combustion-turbine units, one natural-gas-fired combined-cycle steam-turbine unit, and one petroleum-liquids internal-combustion generator.
OREGONEN19 (unit-specific PJM LMP nodes: OREGONEN19 KV CTG11, OREGONEN19 KV CTG12, and OREGONEN19 KV ST10) · 345 kV.

## Key facts

- Technology: Natural Gas Fired Combined Cycle, Petroleum Liquids
- Power capacity: 1061.5 MW
- Operating status: operating

## Grid and market context

- ISO/RTO: PJM
- Balancing authority: PJM

## Source-backed facts

- Owner logo domain: indianamichiganpower.com — I&M Receives IURC Approval for Oregon Clean Energy Center Purchase · confidence: medium
- Identifiers: [{"value":"59764","system":"EIA plant ID"},{"value":"CTG11","system":"EIA generator ID"},{"value":"CTG12","system":"EIA generator ID"},{"value":"STG10","system":"EIA generator ID"},{"value":"EDG13","system":"EIA generator ID"},{"value":"OREGONEN19 KV CTG11","system":"PJM RTO/ISO LMP node"},{"value":"OREGONEN19 KV CTG12","system":"PJM RTO/ISO LMP node"},{"value":"OREGONEN19 KV ST10","system":"PJM RTO/ISO LMP node"},{"value":"PJM","system":"Balancing authority / market"},{"value":"ER16-2462-000","system":"FERC MBR docket"},{"value":"11646","system":"FERC MBR asset appendix serial"},{"value":"12-2959-EL-BGN","system":"Ohio Power Siting Board case"}] — 12-2959-EL-BGN:Oregon Clean Energy Center · confidence: medium
- Owner name: Indiana Michigan Power (I&M), through Oregon Clean Energy, LLC — Source · confidence: high
- Description: Oregon Clean Energy Center is an operating natural-gas combined-cycle generating facility at 816 Lallendorf Road in Oregon, Ohio, in Lucas County. The EIA plant record reports 1,061.5 MW of total nameplate capacity across four operating generators; the generator records identify two natural-gas combustion-turbine units, one natural-gas steam-turbine unit, and a petroleum-liquids emergency generator. The plant began commercial operation in 2017 and is connected to the PJM market. Indiana Michigan Power acquired 100% of Oregon Clean Energy, LLC, the plant owner, in March 2026. — 12-2959-EL-BGN:Oregon Clean Energy Center · confidence: medium
- Description: Oregon Clean Energy Center is an operating natural-gas combined-cycle generating facility at 816 Lallendorf Road in Oregon, Ohio, in Lucas County. The EIA plant record reports 1,061.5 MW of total nameplate capacity across four operating generators; the generator records identify two natural-gas combustion-turbine units, one natural-gas steam-turbine unit, and a petroleum-liquids emergency generator. The plant began commercial operation in 2017 and is connected to the PJM market. Indiana Michigan Power acquired 100% of Oregon Clean Energy, LLC, the plant owner, in March 2026. — Source · confidence: medium
- Parties: [{"relationship":"Current legal owner","name":"Oregon Clean Energy, LLC","official_url":null},{"relationship":"Current owner and operating company","name":"Indiana Michigan Power","official_url":"https://www.indianamichiganpower.com"},{"relationship":"Parent company","name":"American Electric Power","official_url":"https://www.aep.com"},{"relationship":"Developer","name":"North America Project Development, LLC","official_url":null},{"relationship":"Developer and historical minority owner","name":"CME Energy","official_url":"https://cme-energy.com"},{"relationship":"Development partner","name":"Pure Energy","official_url":null},{"relationship":"Engineering, procurement and construction contractor","name":"Black & Veatch","official_url":"https://www.bv.com"},{"relationship":"Power-island equipment OEM","name":"Siemens","official_url":"https://www.siemens-energy.com/us/en/home.html"},{"relationship":"Heat-recovery steam-generator supplier","name":"NEM","official_url":null},{"relationship":"Historical investor and owner","name":"Ares Capital","official_url":null},{"relationship":"Historical co-investor and owner","name":"I Squared Capital","official_url":null},{"relationship":"EIA-listed operator name in the plant record","name":"Oregon Clean Energy Center","official_url":null}] — Source · confidence: medium
- Parties: [{"relationship":"Current legal owner","name":"Oregon Clean Energy, LLC","official_url":null},{"relationship":"Current owner and operating company","name":"Indiana Michigan Power","official_url":"https://www.indianamichiganpower.com"},{"relationship":"Parent company","name":"American Electric Power","official_url":"https://www.aep.com"},{"relationship":"Developer","name":"North America Project Development, LLC","official_url":null},{"relationship":"Developer and historical minority owner","name":"CME Energy","official_url":"https://cme-energy.com"},{"relationship":"Development partner","name":"Pure Energy","official_url":null},{"relationship":"Engineering, procurement and construction contractor","name":"Black & Veatch","official_url":"https://www.bv.com"},{"relationship":"Power-island equipment OEM","name":"Siemens","official_url":"https://www.siemens-energy.com/us/en/home.html"},{"relationship":"Heat-recovery steam-generator supplier","name":"NEM","official_url":null},{"relationship":"Historical investor and owner","name":"Ares Capital","official_url":null},{"relationship":"Historical co-investor and owner","name":"I Squared Capital","official_url":null},{"relationship":"EIA-listed operator name in the plant record","name":"Oregon Clean Energy Center","official_url":null}] — Oregon, Ohio Clean Energy Center – CME Energy · confidence: medium
- Canonical name: Oregon Clean Energy Center — 12-2959-EL-BGN:Oregon Clean Energy Center · confidence: high
- Identifiers.11: {"value":"12-2959-EL-BGN","system":"Ohio Power Siting Board case"} — 12-2959-EL-BGN:Oregon Clean Energy Center · confidence: high
- Parties.0: {"relationship":"Current legal owner","name":"Oregon Clean Energy, LLC","official_url":null} — Source · confidence: high
- Parties.1: {"relationship":"Current owner and operating company","name":"Indiana Michigan Power","official_url":"https://www.indianamichiganpower.com"} — I&M Takes Ownership of Oregon Clean Energy Center · confidence: high
- Parties.3: {"relationship":"Developer","name":"North America Project Development, LLC","official_url":null} — Oregon, Ohio Clean Energy Center – CME Energy · confidence: high
- Parties.4: {"relationship":"Developer and historical minority owner","name":"CME Energy","official_url":"https://cme-energy.com"} — Oregon, Ohio Clean Energy Center – CME Energy · confidence: high
- Parties.5: {"relationship":"Development partner","name":"Pure Energy","official_url":null} — Oregon, Ohio Clean Energy Center – CME Energy · confidence: medium
- Parties.6: {"relationship":"Engineering, procurement and construction contractor","name":"Black & Veatch","official_url":"https://www.bv.com"} — Advanced Combined Cycle Facility Delivers Value to Community, Environment, Investors | Black & Veatch · confidence: high
- Commercial operation date: 2017-07-01 — Source · confidence: medium
- Construction scope: Operating natural-gas combined-cycle plant with two Siemens SGT6-8000H combustion turbines, one Siemens SST6-5000 steam turbine, three Siemens SGen6-2000H generators, and two NEM heat-recovery steam generators in a two-on-one configuration. The current EIA record lists four operating generators totaling 1,061.5 MW, including one 1.5 MW EDG13 petroleum-liquids emergency generator. Black & Veatch served as EPC contractor; documented construction included two combustion-turbine foundations, two HRSG foundations, an STG foundation, cooling-tower foundation, approximately 1,200 auger-cast piles, 110 drilled piers, and approximately 23,000 cubic yards of concrete. EPA permitting records additionally describe an auxiliary boiler, emergency fire-water pump, wet cooling tower, and emissions-control systems. — Siemens wins Power Island order for combined cycle power plant – CME Energy · confidence: medium
- Construction scope: Operating natural-gas combined-cycle plant with two Siemens SGT6-8000H combustion turbines, one Siemens SST6-5000 steam turbine, three Siemens SGen6-2000H generators, and two NEM heat-recovery steam generators in a two-on-one configuration. The current EIA record lists four operating generators totaling 1,061.5 MW, including one 1.5 MW EDG13 petroleum-liquids emergency generator. Black & Veatch served as EPC contractor; documented construction included two combustion-turbine foundations, two HRSG foundations, an STG foundation, cooling-tower foundation, approximately 1,200 auger-cast piles, 110 drilled piers, and approximately 23,000 cubic yards of concrete. EPA permitting records additionally describe an auxiliary boiler, emergency fire-water pump, wet cooling tower, and emissions-control systems. — Oregon Clean Energy Center - Lake Erie Electric · confidence: medium
- Construction scope: Operating natural-gas combined-cycle plant with two Siemens SGT6-8000H combustion turbines, one Siemens SST6-5000 steam turbine, three Siemens SGen6-2000H generators, and two NEM heat-recovery steam generators in a two-on-one configuration. The current EIA record lists four operating generators totaling 1,061.5 MW, including one 1.5 MW EDG13 petroleum-liquids emergency generator. Black & Veatch served as EPC contractor; documented construction included two combustion-turbine foundations, two HRSG foundations, an STG foundation, cooling-tower foundation, approximately 1,200 auger-cast piles, 110 drilled piers, and approximately 23,000 cubic yards of concrete. EPA permitting records additionally describe an auxiliary boiler, emergency fire-water pump, wet cooling tower, and emissions-control systems. — Oregon Clean Energy - Mosser · confidence: medium
- Construction scope: Operating natural-gas combined-cycle plant with two Siemens SGT6-8000H combustion turbines, one Siemens SST6-5000 steam turbine, three Siemens SGen6-2000H generators, and two NEM heat-recovery steam generators in a two-on-one configuration. The current EIA record lists four operating generators totaling 1,061.5 MW, including one 1.5 MW EDG13 petroleum-liquids emergency generator. Black & Veatch served as EPC contractor; documented construction included two combustion-turbine foundations, two HRSG foundations, an STG foundation, cooling-tower foundation, approximately 1,200 auger-cast piles, 110 drilled piers, and approximately 23,000 cubic yards of concrete. EPA permitting records additionally describe an auxiliary boiler, emergency fire-water pump, wet cooling tower, and emissions-control systems. — Oregon Clean Energy Center - Permitting Information | US EPA · confidence: medium
- Product url: https://www.siemens-energy.com/global/en/home/products-services/product/sgt6-8000h.html — SGT6-8000H Heavy-duty gas turbine (60 Hz) · confidence: high
- Significance: The Oregon Clean Energy Center is an operating PJM-market generating facility with 1,061.5 MW of EIA-reported total nameplate capacity across four operating generators. Its configuration combines two natural-gas combustion-turbine units, a natural-gas steam-turbine unit, and a 1.5 MW petroleum-liquids emergency generator. — Oregon Clean Energy Center secures project financing · confidence: medium
- Description: The Oregon Clean Energy Center is a natural-gas combined-cycle facility in Oregon, Lucas County, Ohio, with an EIA-reported 1,061.5 MW of total nameplate capacity and four operating generators. Indiana Michigan Power acquired 100% of Oregon Clean Energy, LLC, the plant owner, in March 2026, and operates the facility within the American Electric Power group. CME Energy and Pure Energy formed North America Project Development, LLC in 2012 to develop the project; Ares/EIF and I Squared Capital later joined as equity owners. Construction began in November 2014, and the Ohio Power Siting Board records commercial operation beginning July 1, 2017. — Source · confidence: medium
- Description: The Oregon Clean Energy Center is a natural-gas combined-cycle facility in Oregon, Lucas County, Ohio, with an EIA-reported 1,061.5 MW of total nameplate capacity and four operating generators. Indiana Michigan Power acquired 100% of Oregon Clean Energy, LLC, the plant owner, in March 2026, and operates the facility within the American Electric Power group. CME Energy and Pure Energy formed North America Project Development, LLC in 2012 to develop the project; Ares/EIF and I Squared Capital later joined as equity owners. Construction began in November 2014, and the Ohio Power Siting Board records commercial operation beginning July 1, 2017. — Oregon, Ohio Clean Energy Center – CME Energy · confidence: medium
- Quality notes: ["Capacity figures use different measurement bases: EIA reports 1,061.5 MW of total nameplate capacity including the emergency generator, while I&M describes 870 MW of natural-gas generation, the Ohio Power Siting Board describes a 960 MW facility, and CME describes an 869 MW project with higher peak-capacity figures.","Commercial-operation timing varies by source: CME states June 2017, while the Ohio Power Siting Board records July 1, 2017; July 1, 2017 is used as the formal regulatory operation date.","The approximately $856 million project cost and the later debt facilities are not interchangeable with sale consideration. I&M's 2026 acquisition table shows a $918 million amount alongside the Oregon Plant, but the reviewed excerpt does not identify that figure as purchase consideration; no separately stated sale price was found.","The reviewed plant records show all four units operational and no planned units; no documented post-commissioning expansion, retirement, or repowering was identified. The generator records also report no completed uprate or derate."] — Source · confidence: medium
- Quality notes: ["Capacity figures use different measurement bases: EIA reports 1,061.5 MW of total nameplate capacity including the emergency generator, while I&M describes 870 MW of natural-gas generation, the Ohio Power Siting Board describes a 960 MW facility, and CME describes an 869 MW project with higher peak-capacity figures.","Commercial-operation timing varies by source: CME states June 2017, while the Ohio Power Siting Board records July 1, 2017; July 1, 2017 is used as the formal regulatory operation date.","The approximately $856 million project cost and the later debt facilities are not interchangeable with sale consideration. I&M's 2026 acquisition table shows a $918 million amount alongside the Oregon Plant, but the reviewed excerpt does not identify that figure as purchase consideration; no separately stated sale price was found.","The reviewed plant records show all four units operational and no planned units; no documented post-commissioning expansion, retirement, or repowering was identified. The generator records also report no completed uprate or derate."] — I&M Takes Ownership of Oregon Clean Energy Center · confidence: medium
- Timeline: [{"event":"Development company formed","date":"2012-04","detail":"CME Energy and Pure Energy formed North America Project Development, LLC and began developing the Oregon Clean Energy Center in Oregon, Ohio."},{"event":"Ohio Power Siting Board application filed","date":"2013-01-17","detail":"The project application was filed with the Ohio Power Siting Board."},{"event":"Ohio Power Siting Board certificate issued","date":"2013-05-01","detail":"The Ohio Power Siting Board certificated the project."},{"event":"Project financial close","date":"2014-11-14","detail":"The project reached financial close with Ares/EIF and I Squared Capital as equity participants; NAPD used loans from EIF United States Power Fund IV."},{"event":"Construction began","date":"2014-11-17","detail":"Black & Veatch began construction of the natural-gas combined-cycle project."},{"event":"Project received industry award","date":"2015-03","detail":"The Oregon Clean Energy Center won IJGlobal's North American Single-Asset Power 2014 Award."},{"event":"Commercial operation","date":"2017-07-01","detail":"The Ohio Power Siting Board records the facility as operational on July 1, 2017; CME separately states that commercial operations began in June 2017."},{"event":"Refinancing underway","date":"2018","detail":"CME reported that the project was being refinanced as of 2018."},{"event":"Term-loan refinancing","date":"2019-02","detail":"Oregon Clean Energy, LLC's senior secured term loan B was upsized to $530 million from $500 million, with a $50 million revolving credit facility."},{"event":"Subsequent refinancing proposed","date":"2024-08","detail":"A proposed $455 million refinancing consisted of a $415 million senior secured term loan B and a $40 million revolving facility."},{"event":"IURC approval for acquisition","date":"2025-11","detail":"The Indiana Utility Regulatory Commission approved I&M's agreement to acquire the Oregon Clean Energy Center."},{"event":"Acquisition completed","date":"2026-03-03","detail":"Indiana Michigan Power took full ownership of the Oregon Clean Energy Center; its SEC filing states that I&M acquired 100% of the equity interests in Oregon Clean Energy, LLC during March 2026."}] — Oregon, Ohio Clean Energy Center – CME Energy · confidence: medium
- Timeline: [{"event":"Development company formed","date":"2012-04","detail":"CME Energy and Pure Energy formed North America Project Development, LLC and began developing the Oregon Clean Energy Center in Oregon, Ohio."},{"event":"Ohio Power Siting Board application filed","date":"2013-01-17","detail":"The project application was filed with the Ohio Power Siting Board."},{"event":"Ohio Power Siting Board certificate issued","date":"2013-05-01","detail":"The Ohio Power Siting Board certificated the project."},{"event":"Project financial close","date":"2014-11-14","detail":"The project reached financial close with Ares/EIF and I Squared Capital as equity participants; NAPD used loans from EIF United States Power Fund IV."},{"event":"Construction began","date":"2014-11-17","detail":"Black & Veatch began construction of the natural-gas combined-cycle project."},{"event":"Project received industry award","date":"2015-03","detail":"The Oregon Clean Energy Center won IJGlobal's North American Single-Asset Power 2014 Award."},{"event":"Commercial operation","date":"2017-07-01","detail":"The Ohio Power Siting Board records the facility as operational on July 1, 2017; CME separately states that commercial operations began in June 2017."},{"event":"Refinancing underway","date":"2018","detail":"CME reported that the project was being refinanced as of 2018."},{"event":"Term-loan refinancing","date":"2019-02","detail":"Oregon Clean Energy, LLC's senior secured term loan B was upsized to $530 million from $500 million, with a $50 million revolving credit facility."},{"event":"Subsequent refinancing proposed","date":"2024-08","detail":"A proposed $455 million refinancing consisted of a $415 million senior secured term loan B and a $40 million revolving facility."},{"event":"IURC approval for acquisition","date":"2025-11","detail":"The Indiana Utility Regulatory Commission approved I&M's agreement to acquire the Oregon Clean Energy Center."},{"event":"Acquisition completed","date":"2026-03-03","detail":"Indiana Michigan Power took full ownership of the Oregon Clean Energy Center; its SEC filing states that I&M acquired 100% of the equity interests in Oregon Clean Energy, LLC during March 2026."}] — 12-2959-EL-BGN:Oregon Clean Energy Center · confidence: medium
- Timeline: [{"event":"Development company formed","date":"2012-04","detail":"CME Energy and Pure Energy formed North America Project Development, LLC and began developing the Oregon Clean Energy Center in Oregon, Ohio."},{"event":"Ohio Power Siting Board application filed","date":"2013-01-17","detail":"The project application was filed with the Ohio Power Siting Board."},{"event":"Ohio Power Siting Board certificate issued","date":"2013-05-01","detail":"The Ohio Power Siting Board certificated the project."},{"event":"Project financial close","date":"2014-11-14","detail":"The project reached financial close with Ares/EIF and I Squared Capital as equity participants; NAPD used loans from EIF United States Power Fund IV."},{"event":"Construction began","date":"2014-11-17","detail":"Black & Veatch began construction of the natural-gas combined-cycle project."},{"event":"Project received industry award","date":"2015-03","detail":"The Oregon Clean Energy Center won IJGlobal's North American Single-Asset Power 2014 Award."},{"event":"Commercial operation","date":"2017-07-01","detail":"The Ohio Power Siting Board records the facility as operational on July 1, 2017; CME separately states that commercial operations began in June 2017."},{"event":"Refinancing underway","date":"2018","detail":"CME reported that the project was being refinanced as of 2018."},{"event":"Term-loan refinancing","date":"2019-02","detail":"Oregon Clean Energy, LLC's senior secured term loan B was upsized to $530 million from $500 million, with a $50 million revolving credit facility."},{"event":"Subsequent refinancing proposed","date":"2024-08","detail":"A proposed $455 million refinancing consisted of a $415 million senior secured term loan B and a $40 million revolving facility."},{"event":"IURC approval for acquisition","date":"2025-11","detail":"The Indiana Utility Regulatory Commission approved I&M's agreement to acquire the Oregon Clean Energy Center."},{"event":"Acquisition completed","date":"2026-03-03","detail":"Indiana Michigan Power took full ownership of the Oregon Clean Energy Center; its SEC filing states that I&M acquired 100% of the equity interests in Oregon Clean Energy, LLC during March 2026."}] — I&M Takes Ownership of Oregon Clean Energy Center · confidence: medium
- Timeline: [{"event":"Development company formed","date":"2012-04","detail":"CME Energy and Pure Energy formed North America Project Development, LLC and began developing the Oregon Clean Energy Center in Oregon, Ohio."},{"event":"Ohio Power Siting Board application filed","date":"2013-01-17","detail":"The project application was filed with the Ohio Power Siting Board."},{"event":"Ohio Power Siting Board certificate issued","date":"2013-05-01","detail":"The Ohio Power Siting Board certificated the project."},{"event":"Project financial close","date":"2014-11-14","detail":"The project reached financial close with Ares/EIF and I Squared Capital as equity participants; NAPD used loans from EIF United States Power Fund IV."},{"event":"Construction began","date":"2014-11-17","detail":"Black & Veatch began construction of the natural-gas combined-cycle project."},{"event":"Project received industry award","date":"2015-03","detail":"The Oregon Clean Energy Center won IJGlobal's North American Single-Asset Power 2014 Award."},{"event":"Commercial operation","date":"2017-07-01","detail":"The Ohio Power Siting Board records the facility as operational on July 1, 2017; CME separately states that commercial operations began in June 2017."},{"event":"Refinancing underway","date":"2018","detail":"CME reported that the project was being refinanced as of 2018."},{"event":"Term-loan refinancing","date":"2019-02","detail":"Oregon Clean Energy, LLC's senior secured term loan B was upsized to $530 million from $500 million, with a $50 million revolving credit facility."},{"event":"Subsequent refinancing proposed","date":"2024-08","detail":"A proposed $455 million refinancing consisted of a $415 million senior secured term loan B and a $40 million revolving facility."},{"event":"IURC approval for acquisition","date":"2025-11","detail":"The Indiana Utility Regulatory Commission approved I&M's agreement to acquire the Oregon Clean Energy Center."},{"event":"Acquisition completed","date":"2026-03-03","detail":"Indiana Michigan Power took full ownership of the Oregon Clean Energy Center; its SEC filing states that I&M acquired 100% of the equity interests in Oregon Clean Energy, LLC during March 2026."}] — Source · confidence: medium
- Commercial parties.0: {"relationship":"Current owner and operating company; buyer","name":"Indiana Michigan Power","detail":"I&M acquired 100% of Oregon Clean Energy, LLC in March 2026 and took full ownership of the facility on March 3, 2026.","official_url":"https://www.indianamichiganpower.com"} — I&M Takes Ownership of Oregon Clean Energy Center · confidence: medium
- Commercial parties.1: {"relationship":"Current legal owner / acquired entity","name":"Oregon Clean Energy, LLC","detail":"The legal entity that owned the Oregon Clean Energy Center before I&M acquired its equity interests; it remains the plant-owning entity within the I&M ownership structure.","official_url":null} — Source · confidence: medium
- Commercial parties.6: {"relationship":"Developer and historical minority owner","name":"CME Energy","detail":"CME Energy partnered with Pure Energy to form North America Project Development, LLC and retained a minority ownership interest as of 2018.","official_url":"https://cme-energy.com"} — Oregon, Ohio Clean Energy Center – CME Energy · confidence: medium
- Commercial parties.7: {"relationship":"Development partner","name":"Pure Energy","detail":"Pure Energy partnered with CME Energy in forming North America Project Development, LLC to develop the facility.","official_url":null} — Oregon, Ohio Clean Energy Center – CME Energy · confidence: medium
- Commercial parties.8: {"relationship":"Development company","name":"North America Project Development, LLC","detail":"The CME/Pure Energy development company that developed the Oregon Clean Energy Center and retained an interest during the original project financing.","official_url":null} — Oregon, Ohio Clean Energy Center – CME Energy · confidence: medium
- Commercial parties.9: {"relationship":"Engineering, procurement and construction contractor","name":"Black & Veatch","detail":"Black & Veatch began construction on November 17, 2014 and received the Siemens power-island equipment order for the project.","official_url":"https://www.bv.com"} — Oregon, Ohio Clean Energy Center – CME Energy · confidence: medium
- Commercial parties.9: {"relationship":"Engineering, procurement and construction contractor","name":"Black & Veatch","detail":"Black & Veatch began construction on November 17, 2014 and received the Siemens power-island equipment order for the project.","official_url":"https://www.bv.com"} — Siemens wins Power Island order for combined cycle... · confidence: medium
- Commercial parties.10: {"relationship":"Power-island equipment OEM","name":"Siemens Energy","detail":"Siemens supplied the power-island equipment, including two SGT6-8000H gas turbines and a steam turbine for the combined-cycle facility.","official_url":"https://www.siemens-energy.com/us/en/home.html"} — Siemens wins Power Island order for combined cycle... · confidence: medium
- Commercial parties.10: {"relationship":"Power-island equipment OEM","name":"Siemens Energy","detail":"Siemens supplied the power-island equipment, including two SGT6-8000H gas turbines and a steam turbine for the combined-cycle facility.","official_url":"https://www.siemens-energy.com/us/en/home.html"} — Oregon Clean Energy Center secures project financing · confidence: medium
- Commercial parties.11: {"relationship":"Project-financing vehicle","name":"EIF United States Power Fund IV","detail":"North America Project Development used loans from USPF IV in connection with the original project financing; the fund was associated with Energy Investors Funds/EIF.","official_url":null} — Oregon Clean Energy Center secures project financing · confidence: medium
- Acquisition detail: In March 2026, Indiana Michigan Power completed the acquisition of 100% of the equity interests in Oregon Clean Energy, LLC, the owner of the Oregon Clean Energy Center. — I&M Takes Ownership of Oregon Clean Energy Center · confidence: high
- Acquisition date: 2026-03 — Source · confidence: medium
- Ownership interest pct: 100 — Source · confidence: high
- Prior owner: Ares/EIF and I Squared Capital were historical owners; CME Energy, through North America Project Development, LLC, retained a minority ownership interest as of 2018. — Oregon, Ohio Clean Energy Center – CME Energy · confidence: medium
- Acquirer: Indiana Michigan Power (I&M) — Source · confidence: high
- Acquirer: Indiana Michigan Power (I&M) — I&M Takes Ownership of Oregon Clean Energy Center · confidence: high
- Transaction scope: ownership_stake — Source · confidence: high

## Timeline

- 2012-04 — Development company formed
  CME Energy and Pure Energy formed North America Project Development, LLC and began developing the Oregon Clean Energy Center in Oregon, Ohio.
  Source: Oregon, Ohio Clean Energy Center – CME Energy (https://cme-energy.com/projects/oregon-ohio-clean-energy-center/)
- 2013-01-17 — Ohio Power Siting Board application filed
  The project application was filed with the Ohio Power Siting Board.
  Source: 12-2959-EL-BGN:Oregon Clean Energy Center (https://opsb.ohio.gov/cases/12-2959-el-bgn)
- 2013-05-01 — Ohio Power Siting Board certificate issued
  The Ohio Power Siting Board certificated the project.
  Source: 12-2959-EL-BGN:Oregon Clean Energy Center (https://opsb.ohio.gov/cases/12-2959-el-bgn)
- 2014-11-14 — Project financial close
  The project reached financial close with Ares/EIF and I Squared Capital as equity participants; NAPD used loans from EIF United States Power Fund IV.
  Source: Oregon, Ohio Clean Energy Center – CME Energy (https://cme-energy.com/projects/oregon-ohio-clean-energy-center/)
- 2014-11-17 — Construction began
  Black & Veatch began construction of the natural-gas combined-cycle project.
  Source: Oregon, Ohio Clean Energy Center – CME Energy (https://cme-energy.com/projects/oregon-ohio-clean-energy-center/)
- 2015-03 — Project received industry award
  The Oregon Clean Energy Center won IJGlobal's North American Single-Asset Power 2014 Award.
  Source: Oregon, Ohio Clean Energy Center – CME Energy (https://cme-energy.com/projects/oregon-ohio-clean-energy-center/)
- 2018 — Refinancing underway
  CME reported that the project was being refinanced as of 2018.
  Source: Oregon, Ohio Clean Energy Center – CME Energy (https://cme-energy.com/projects/oregon-ohio-clean-energy-center/)
- 2025-11 — IURC approval for acquisition
  The Indiana Utility Regulatory Commission approved I&M's agreement to acquire the Oregon Clean Energy Center.
  Source: I&M Takes Ownership of Oregon Clean Energy Center (https://www.indianamichiganpower.com/company/news/view?releaseID=10785)

## Sources

- [I&M Receives IURC Approval for Oregon Clean Energy ...](https://www.indianamichiganpower.com/company/news/view?releaseID=10587) — indianamichiganpower.com · tier other
- [12-2959-EL-BGN:Oregon Clean Energy Center](https://opsb.ohio.gov/cases/12-2959-el-bgn) — opsb.ohio.gov · tier regulatory
- [I&M Takes Ownership of Oregon Clean Energy Center](https://www.indianamichiganpower.com/company/news/view?releaseID=10785) — indianamichiganpower.com · tier other
- [Source](https://www.sec.gov/Archives/edgar/data/4904/000000490426000034/R59.htm) — sec.gov · tier regulatory
- [Oregon, Ohio Clean Energy Center – CME Energy](https://cme-energy.com/projects/oregon-ohio-clean-energy-center/) — cme-energy.com · tier other
- [Advanced Combined Cycle Facility Delivers Value to Community, Environment, Investors | Black & Veatch](https://www.bv.com/projects/advanced-combined-cycle-facility-delivers-value-to-community-environment) — bv.com · tier other
- [Oregon Clean Energy Center ‘the next iteration of technology’ – CME Energy](https://cme-energy.com/news/oregon-clean-energy-center-the-next-iteration-of-technology/) — cme-energy.com · tier other
- [Siemens wins Power Island order for combined cycle ...](https://cme-energy.com/news/siemens-wins-power-island-order-for-combined-cycle-power-plant/) — cme-energy.com · tier other
- [Oregon Clean Energy Center - Lake Erie Electric](https://www.lakeerieelectric.com/oregon-clean-energy-center/) — lakeerieelectric.com · tier other
- [Oregon Clean Energy - Mosser](https://mosserconstruction.com/portfolio/oregon-clean-energy/) — mosserconstruction.com · tier other
- [Oregon Clean Energy Center - Permitting Information | US EPA](https://www.epa.gov/nsr/oregon-clean-energy-center-permitting-information) — epa.gov · tier regulatory
- [SGT6-8000H Heavy-duty gas turbine (60 Hz)](https://www.siemens-energy.com/global/en/home/products-services/product/sgt6-8000h.html) — siemens-energy.com · tier other
- [Utility steam turbines](https://www.siemens-energy.com/global/en/home/products-services/product/utility-steam-turbines.html) — siemens-energy.com · tier other
- [Oregon Clean Energy Center secures project financing](https://www.power-eng.com/coal/oregon-clean-energy-center-secures-project-financing/) — power-eng.com · tier other
- [Source](https://sec.gov/Archives/edgar/data/4904/000000490426000034/R59.htm) — sec.gov · tier regulatory
- [Source](https://iurc.portal.in.gov/_entity/sharepointdocumentlocation/c10382dd-0417-f011-998a-001dd803db57/bb9c6bba-fd52-45ad-8e64-a444aef13c39?file=46217_IndMich_Submission%20of%20Direct%20Testimony%20of%20Nicholas%20Fisher_041125.pdf) — iurc.portal.in.gov · tier regulatory
- [Indiana Michigan Power eyes purchase of 870-MW gas plant](https://www.power-eng.com/gas/indiana-michigan-power-eyes-purchase-of-870-mw-gas-plant/) — power-eng.com · tier other

## Data quality

- Capacity figures use different measurement bases: EIA reports 1,061.5 MW of total nameplate capacity including the emergency generator, while I&M describes 870 MW of natural-gas generation, the Ohio Power Siting Board describes a 960 MW facility, and CME describes an 869 MW project with higher peak-capacity figures. The approximately $856 million project cost and the later debt facilities are not interchangeable with sale consideration. I&M's 2026 acquisition table shows a $918 million amount alongside the Oregon Plant, but the reviewed excerpt does not identify that figure as purchase consideration; no separately stated sale price was found. The reviewed plant records show all four units operational and no planned units; no documented post-commissioning expansion, retirement, or repowering was identified. The generator records also report no completed uprate or derate.

---