# Phoebe Solar

ERCOT asset profile · https://askthegrid.com/assets/facilities/phoebe-solar

Innergex · Winkler County · ERCOT

Phoebe Solar is a 250 MWac / 315 MWdc photovoltaic facility in Winkler County, Texas. EIA's May 2026 inventory lists one operating generator under Plant ID 61906, with service beginning in November 2019 and Phoebe Energy Project LLC as the registered operator. In 2024 Innergex sold a 49.9% interest in Phoebe while retaining operating control and a majority interest.

## Profile

- **Grid role:** Utility-scale solar generation in ERCOT.
- **Capacity:** 250 MWac EIA nameplate · 315 MWdc project rating.
- **Ownership:** Innergex retained operating control and a 50.1% interest after a 2024 minority sale.
- **Equipment and offtake:** First Solar Series 6 modules · Shell Energy power hedge covering 89% of expected output at financing.

## Metrics

- **Reported capacity:** 250 MW — EIA-reported operating capacity; nameplate, seasonal, AC/DC, and unit ratings may differ.
- **Operating capacity:** 250 MWac — EIA May 2026
- **DC rating:** 315 MWdc — Innergex
- **Innergex interest:** 50.1% — After Jun 2024 sale
- **Settlement point:** PHOEBE_ALL — ERCOT settlement point.
- **Registry anchor:** Plant 61906 — Phoebe Energy Project LLC

## Facts

- **Operating capacity:** 250 MWac — EIA May 2026 · confidence: high
- **DC rating:** 315 MWdc — Innergex · confidence: high
- **Controlling owner and operator:** Innergex — 2024 transaction record · confidence: high
- **Module platform:** First Solar Series 6 — Innergex · confidence: high

## Related parties

- **Project company and EIA registered operator:** Phoebe Energy Project LLC — EIA May 2026 generator inventory
- **Portfolio lead arranger of non-recourse financing:** CIT — Financing covers a portfolio that includes Phoebe Solar. ([source](https://www.firstcitizens.com/commercial/cit))
- **Portfolio tax-equity investor:** Wells Fargo — Financing covers a portfolio that includes Phoebe Solar. ([source](https://www.wellsfargo.com/))
- **Module supplier and initial five-year O&M provider:** First Solar — Innergex Phoebe acquisition and financing ([source](https://www.firstsolar.com/))

## Sources

- [EIA May 2026 generator inventory](https://www.eia.gov/electricity/data/eia860m/) — U.S. Energy Information Administration · regulatory — Current generator records, capacity scopes, dates, status, operator, and technology.
- [Innergex Phoebe acquisition and financing](https://files.innergex.com/files/documents/2019/02/press-release-announce-phoebe-2018-07-02-en.pdf) — Innergex · official — Acquisition capacity equipment financing project cost hedge and initial O&M.
- [Innergex Texas minority sale](https://files.innergex.com/files/documents/INE_ERCOT_EN.pdf) — Innergex · official — 2024 minority sale and retained operating control.

---

Canonical page: https://askthegrid.com/assets/facilities/phoebe-solar
Website: [Innergex](https://www.innergex.com/en/media/innergex-announces-the-full-commissioning-of-phoebe-the-largest-solar-farm-in-operation-in-texas)
Profile published: 2026-07-17T03:34:40.700Z
Source: Ask the Grid — https://askthegrid.com/
