# Poolside Project Horizon Data Center Campus

ERCOT data center · https://askthegrid.com/assets/facilities/poolside-project-horizon-data-center-campus--grid-load-c34377502d7aeadf

Project Horizon is a data center campus under development by Poolside in unincorporated Pecos County, Texas, about 25 miles outside Fort Stockton. The latest investor disclosure describes an initial 200 MW building within a 1.2 GW campus, with first operations targeted for late 2027 and subject to financing. Earlier disclosures gave 2 GW and 400 MW, and the original anchor-tenant arrangement fell apart in 2026. Power is planned from behind-the-meter natural gas generation, with a public-grid connection for backup.

## Identity and location

- Operating status: proposed
- Asset scope: campus
- Location: Pecos County, TX
- Owner: Poolside, Inc (exact asset)

## Power and grid context

- Reported unspecified: 1,200 MW · proposed · exact asset — Latest investor-disclosed campus plan, subject to financing and execution
- Reported unspecified: 200 MW · target · target 2027 · exact asset — Initial building within the campus plan; first operations targeted for late 2027
- Reported unspecified: 7,000+ MW · reported · exact asset — Identified longer-term expansion potential
- Reported unspecified: 400 MW · reported · exact asset — Project Horizon described in an August 2026 company release
- Reported unspecified: Up to 2,000 MW · proposed · exact asset — Original multi-phase campus potential in the tax-abatement notice
- Onsite generation: 576 MW · reported · campus — Dedicated power supply: Reported gas-fired facility to power the campus
- Onsite generation: 360 MW · proposed · campus — Dedicated power supply: Additional generation under consideration, years away
- ISO/RTO: ERCOT

## Sources

- [Attention Required! | Cloudflare](https://investors.tiny.com/news/news-details/2026/NVIDIA-Deal-Highlights-Value-of-Tinys-Early-Poolside-Investment/default.aspx)
- [Poolside Infrastructure Company Announces New CFO Justin Lagasse](https://www.prnewswire.com/news-releases/poolside-infrastructure-company-announces-new-cfo-justin-lagasse-302853196.html)
- [www.pcmhfs.com](https://www.pcmhfs.com/docs/PCMH-POOLSIDE-JH-100925_%281%29.pdf)
- [Behind-the-Meter Power Generation Increasingly Prevalent at U.S. ...](https://www.industrialinfo.com/news/article/behind-the-meter-power-generation-increasingly-prevalent-at-us-data-centers--358873)
- [https://projecthorizon-tx.com/power](https://projecthorizon-tx.com/power)
- [Not found — Poolside](https://poolside.ai/blog/announcing-project-horizon)
- [https://projecthorizon-tx.com/water](https://projecthorizon-tx.com/water)
- [Commissioner’s Court Regular Session Agenda 11/10/2025 &#8211; Pecos County](https://www.co.pecos.tx.us/regular_session_agenda-20251110/)
- [https://records.tceq.texas.gov/cs/idcplg?IdcService=GET_FILE&dDocName=8294578&dID=9580276](https://records.tceq.texas.gov/cs/idcplg?IdcService=GET_FILE&dDocName=8294578&dID=9580276)
- [Just a moment...](https://www.datacenterdynamics.com/en/news/poolside-seeks-partners-for-data-center-in-texas-after-coreweave-deal-falls-apart/)
- [Rules, Regulations, and Guidelines &#8211; Pecos County](https://www.co.pecos.tx.us/guidelines-criteria-rules/)

---

Canonical page: https://askthegrid.com/assets/facilities/poolside-project-horizon-data-center-campus--grid-load-c34377502d7aeadf
Profile generated: 2026-11-02T22:17:21.030031Z
Source: Ask the Grid — https://askthegrid.com/