# PowerHouse Irving Data Center Campus

ERCOT data center · https://askthegrid.com/assets/facilities/powerhouse-irving-data-center-campus--grid-load-7e51926832a43b30

PowerHouse Irving is a campus of up to three two-story data center buildings on a 50-acre site at 111 Customer Way in Irving, Texas, and it is under construction. The first building topped out in March 2026, and the developer says deliveries are scheduled to begin in January 2027. The developer describes the campus as designed for up to 201 MW of utility power, after an original announcement of 200 MW and 67 MW per building. A state registration for one building lists a 65 MW total load. The site is adjacent to a substation serviced by Oncor.

## Identity and location

- Operating status: under_construction
- Asset scope: campus
- Location: 111 Customer Way, Irving, Dallas County, TX
- Operator: PowerHouse Data Centers (campus)
- Developer: PowerHouse Data Centers (campus)
- Owner: Powerhouse Data LCX, LLC (exact asset)
- Owner: American Real Estate Partners (exact asset)

## Power and grid context

- Reported unspecified: 200 MW · proposed · campus — Original campus announcement; the basis is not stated
- Reported unspecified: 67 MW · proposed · building — Total power load per building for each of three powered-shell data centers
- Reported unspecified: 65 MW · reported · building — Total load of the 300,000-square-foot core-and-shell building in the state accessibility registration
- Utility service: Up to 201 MW · proposed · campus — Maximum utility power across three buildings
- Reported unspecified: 201 MW · target · target 2027 · campus — Power-secured campus scheduled to begin delivering in January 2027; the source does not allocate MW by date
- ISO/RTO: ERCOT
- Electric utility: Oncor
- Substation: Existing adjacent substation serviced by Oncor

## Development

- Site area: 50.028 acres
- Buildings: 3

## Sources

- [#powerhousedatacenters #texasdatacenters #dfw #hyperscale #datacenterdevelopment | PowerHouse Data Centers](https://www.linkedin.com/posts/powerhousedatacenters_powerhousedatacenters-texasdatacenters-activity-7443292029314465792-XREB)
- [PowerHouse Closes on Irving-Las Colinas Site, Entering Dallas-Fort Worth Market to Develop New State-of-The-Art Data Center Campus](https://www.powerhousedata.com/news/powerhouse-closes-on-irving-las-colinas-site-entering-dallas-fort-worth-market-to-develop-new-state-of-the-art-data-center-campus)
- [TDLR TABS - Project Details](https://www.tdlr.texas.gov/TABS/Projects/TABS2025013924)
- [Just a moment...](https://www.datacenterdynamics.com/en/news/powerhouse-tops-out-first-irving-data-center-in-texas/)
- [PowerHouse Irving](https://www.powerhousedata.com/data-center/powerhouse-irving)
- [PowerHouse Irving - Built for Irving's Future | PowerHouse Data Centers](https://www.linkedin.com/posts/powerhousedatacenters_powerhouse-irving-built-for-irvings-future-activity-7507808587272925184-i85j)
- [https://irvingtx.gov/corecode/storage/uber_resource/uploaded_pdfs/corecode/Full%20Binder_202405150924427635_5523.pdf](https://irvingtx.gov/corecode/storage/uber_resource/uploaded_pdfs/corecode/Full%20Binder_202405150924427635_5523.pdf)
- [https://irvingtx.gov/corecode/storage/uber_resource/uploaded_pdfs/May-15-2024-Budget-retreat-minutes_1744208834.pdf](https://irvingtx.gov/corecode/storage/uber_resource/uploaded_pdfs/May-15-2024-Budget-retreat-minutes_1744208834.pdf)
- [https://irvingtx.gov/corecode/storage/uber_resource/uploaded_pdfs/corecode/1-25-24%20Regular%20meeting%20minutes_202402131058329426_8109.pdf](https://irvingtx.gov/corecode/storage/uber_resource/uploaded_pdfs/corecode/1-25-24%20Regular%20meeting%20minutes_202402131058329426_8109.pdf)
- [https://irvingtx.gov/corecode/storage/uber_resource/uploaded_pdfs/PZ_Final_Minutes_08_04_2025_1757019425.pdf](https://irvingtx.gov/corecode/storage/uber_resource/uploaded_pdfs/PZ_Final_Minutes_08_04_2025_1757019425.pdf)
- [https://echodata.epa.gov/echo/dfr_rest_services.get_dfr?output=JSON&p_id=TXR1567TG](https://echodata.epa.gov/echo/dfr_rest_services.get_dfr?output=JSON&p_id=TXR1567TG)

---

Canonical page: https://askthegrid.com/assets/facilities/powerhouse-irving-data-center-campus--grid-load-7e51926832a43b30
Profile generated: 2026-11-02T18:59:47.973160Z
Source: Ask the Grid — https://askthegrid.com/