# Pyron Wind Farm LLC Hybrid

ERCOT asset profile · https://askthegrid.com/assets/facilities/pyron-wind-farm-llc-hybrid

RWE Clean Energy · Fisher, Scurry, Mitchell, and Nolan counties · ERCOT

Pyron Wind Farm is an EIA hybrid plant registered in Fisher County, Texas. RWE describes the broader wind facility as spanning Fisher, Scurry, Mitchell, and Nolan counties. EIA's May 2026 inventory contains a 249 MW wind generator that is out of service but expected to return in the next calendar year, plus an operating 9.9 MW / 9.9 MWh battery installed in January 2018. The resulting EIA nameplate aggregate is 258.9 MW, but only the battery record is currently coded operating. RWE reports the wind farm at 269 MW in its company portfolio.

## Profile

- **Current EIA status:** 249 MW wind record OA · 9.9 MW battery record operating.
- **Battery:** 9.9 MW / 9.9 MWh · one-hour duration · Texas Waves-Pyron.
- **Capacity scope:** 258.9 MW EIA record aggregate; RWE reports the wind farm at 269 MW.

## Metrics

- **EIA aggregate:** 258.9 MW — Wind plus battery
- **Wind status:** OA — Expected to return
- **Battery:** 9.9 MW / 9.9 MWh — Operating
- **Settlement point:** PYR_PYRON1 — ERCOT settlement point.
- **Registry anchor:** Plant 56981 — RWE Clean Energy

## Facts

- **Wind generator:** 249 MW · status OA — EIA May 2026 · confidence: high
- **Battery generator:** 9.9 MW / 9.9 MWh · operating — EIA May 2026 · confidence: high
- **Company wind rating:** 269 MW — RWE · confidence: high
- **Registered operator:** RWE Clean Energy — EIA · confidence: high

## Related parties

- **Portfolio eia registered operator and current portfolio owner:** RWE Clean Energy — Financing covers a portfolio that includes Pyron Wind Farm LLC Hybrid. ([source](https://www.rwe.com/))

## Sources

- [EIA May 2026 generator inventory](https://www.eia.gov/electricity/data/eia860m/) — U.S. Energy Information Administration · regulatory — Current generator records, capacity scopes, dates, status, operator, and technology.
- [RWE Pyron storage](https://www.rwe.com/en/press/rwe-clean-energy/2023-07-24-rwe-co-located-battery-storage-facility-comes-online-in-texas/) — RWE · official — Texas Waves-Pyron identity and battery power rating.

---

Canonical page: https://askthegrid.com/assets/facilities/pyron-wind-farm-llc-hybrid
Website: [RWE](https://www.rwe.com/en/press/rwe-clean-energy/2023-07-24-rwe-co-located-battery-storage-facility-comes-online-in-texas/)
Profile published: 2026-07-17T03:34:42.453Z
Source: Ask the Grid — https://askthegrid.com/
