# QTS Irving 1

ERCOT data center · https://askthegrid.com/assets/facilities/qts-irving-1--grid-load-0974a4b72bd79438

QTS Irving 1 is a 56-acre data-center campus along Longhorn Drive. QTS's master plan identifies six facilities and advertises more than 165 MW of critical campus capacity. That campus-wide marketing figure does not establish measured demand or completed capacity in each building. DC1 and DC2 share the 6431 Longhorn Drive address; the other planned facilities have separate Longhorn addresses. A redundant campus conduit system provides fiber routes to individual buildings and between future buildings, supporting expansion within the same campus.

## Identity and location

- Operating status: unknown
- Asset scope: campus
- Location: 6431 Longhorn Drive, Irving, TX
- Operator: QTS (exact asset) — https://q.com/data-centers/irving/

## Development

- Site status: QTS describes a 56-acre master-planned campus with six facilities: DC1/DC2 at 6431 Longhorn Drive, DC3 at 6351, DC4 at 6311, DC5 at 6300 and DC6 at 6440. The master plan is not evidence that every facility is completed.

## Sources

- [https://q.com/data-centers/irving/](https://q.com/data-centers/irving/)

## Data quality

- Power values retain their reported, requested, contracted, energized, gross-campus, or critical-IT basis.

---

Canonical page: https://askthegrid.com/assets/facilities/qts-irving-1--grid-load-0974a4b72bd79438
Profile generated: 2026-09-05T21:38:39.459553Z
Source: Ask the Grid — https://askthegrid.com/