# QTS Richmond 1

PJM data center · https://askthegrid.com/assets/facilities/qts-richmond-1

QTS Richmond 1 is a multi-building data center campus in Sandston, Virginia, whose first three facilities are at 6000 Technology Blvd. The campus covers 207 acres, and QTS reports 238 MW of critical campus capacity; the master plan calls for 6 facilities. The site is listed as near an undersea cable landing station, is LEED Gold certified and has an on-site solar power system.

## Identity and location

- Operating status: operating
- Asset scope: campus
- Location: 6000 Technology Blvd, Sandston, VA
- Operator: QTS (campus) — https://www.qtsdatacenters.com

## Power and grid context

- Campus gross power: 238 MW · reported · campus — Operator-reported critical campus capacity.

## Development

- Site area: 207 acres
- Construction: Master planned campus will feature 6 facilities

## Sources

- [U.S. Department of Transportation address point](https://services.arcgis.com/xOi1kZaI0eWDREZv/ArcGIS/rest/services/Address_Points_from_National_Address_Database_view/FeatureServer/0/query?f=json&where=Add_Number%3D6000&geometry=-77.274177%2C37.458073%2C-77.21417699999999%2C37.518073&geometryType=esriGeometryEnvelope&inSR=4326&spatialRel=esriSpatialRelIntersects&outSR=4326&outFields=%2A&returnGeometry=true&resultRecordCount=2000) — U.S. Department of Transportation
- [https://www.qtsdatacenters.com/data-centers/richmond](https://www.qtsdatacenters.com/data-centers/richmond)

## Data quality

- Power values retain their reported, requested, contracted, energized, gross-campus, or critical-IT basis.
- Map point: government rooftop address point.

---

Canonical page: https://askthegrid.com/assets/facilities/qts-richmond-1
Profile generated: 2026-10-09T00:03:15.451257Z
Source: Ask the Grid — https://askthegrid.com/